# Dead Stock Hold vs Liquidate Calculator for Prophet 21 Distributors

> Source: https://netray.co/tools/p21-dead-stock-hold-vs-liquidate-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Decide whether to keep dead or obsolete stock or sell it down now. Compares the all-in loss of each path and finds the break-even month.

## Category

epicor

## Erp

Epicor Prophet 21

## Industry

Wholesale Distribution

## Audience

- Inventory manager
- Distribution controller
- P21 administrator

## Tool

**Kind:** calculator

**Currency:** $

**Inputs:**

#### Dead stock value at cost

**Key:** dead_value

**Type:** number

**Default:** 480000

**Min:** 0

**Step:** 10000

**Unit:** $

**Help:** Cost value of items with no sales in your cutoff window, from your slow mover or no-sale report.

#### Annual carrying cost rate

**Key:** carry_pct

**Type:** number

**Default:** 22

**Min:** 0

**Max:** 60

**Step:** 1

**Unit:** %

**Help:** Capital, storage, insurance, shrink and handling as a percent of inventory cost per year.

#### Eventual recovery if held

**Key:** hold_rec

**Type:** number

**Default:** 55

**Min:** 0

**Max:** 100

**Step:** 1

**Unit:** % of cost

**Help:** What you realistically expect to recover over time through normal sales or a later sale.

#### Recovery if liquidated now

**Key:** liq_rec

**Type:** number

**Default:** 35

**Min:** 0

**Max:** 100

**Step:** 1

**Unit:** % of cost

**Help:** Broker, auction, return-to-vendor or bulk-sale proceeds as a percent of cost.

#### Months you expect to hold

**Key:** months_held

**Type:** slider

**Default:** 18

**Min:** 0

**Max:** 60

**Step:** 1

**Unit:** months

**Outputs:**

#### Carrying cost while held

**Key:** carry_cost

**Expr:** dead_value * carry_pct / 100 * months_held / 12

**Format:** currency

#### Total loss if held

**Key:** hold_loss

**Expr:** dead_value * (1 - hold_rec / 100) + carry_cost

**Format:** currency

**Primary:** true

**Description:** Write-down to expected recovery plus carrying cost over the holding period.

#### Total loss if liquidated now

**Key:** liq_loss

**Expr:** dead_value * (1 - liq_rec / 100)

**Format:** currency

**Primary:** true

#### Advantage of liquidating (positive) or holding (negative)

**Key:** advantage

**Expr:** hold_loss - liq_loss

**Format:** currency

#### Break-even holding period

**Key:** be_months

**Expr:** if(gt(carry_pct, 0), (hold_rec - liq_rec) / carry_pct * 12, 0)

**Format:** months

**Description:** Holding is cheaper only if you expect to sell down within this many months.

**Chart:**

#### Total loss by holding period

**Type:** line

**X:** months_held

**From:** 0

**To:** 60

**Steps:** 30

**Series:**

- hold_loss
- liq_loss

**Disclaimer:** Planning estimate. Tax effects of write-offs and donations are not included. Confirm with your controller.

## Content

**Intro:** Most distributors carry a layer of stock that has not sold in a year and may never sell. This calculator compares the real cost of keeping it against selling it down now, using your carrying cost rate and two recovery assumptions.

**Sections:**

#### How to use it

**Body:** Pull the cost value of your dead stock from your no-sale or slow mover report in Prophet 21 (or any ERP), then enter your annual carrying cost rate. Enter two recovery percentages: what you expect to get back if you keep the stock and sell it slowly, and what a liquidation buyer or vendor return would pay today. Slide the holding period to see how the gap changes. The chart shows both losses over time so the crossover is visible.

**Bullets:**

- Use cost, not selling price, for every value.
- Run it by vendor or product group, since recovery rates differ widely.
- Treat the hold recovery as a probability weighted figure, not a hope.

#### The math behind it

**Body:** Loss if held equals value times (1 minus hold recovery) plus value times carry rate times months over 12. Loss if liquidated equals value times (1 minus liquidation recovery). Setting them equal gives the break-even: months = (hold recovery minus liquidation recovery) divided by carry rate, times 12. With 55 percent hold recovery, 35 percent liquidation recovery and a 22 percent carry rate, the break-even is about 11 months. Hold longer than that and liquidating wins.

#### Reading the result

**Body:** If your honest holding period exceeds the break-even, the calculator is telling you the stock is costing more to keep than it will ever earn. The advantage figure is the cash value of acting now. Remember the opportunity side: freed cash and warehouse space can fund fast movers, which this model does not credit.

#### Common mistakes

**Body:** Teams overestimate hold recovery because they remember a single lucky sale. Another error is ignoring that dead stock tends to be written down eventually, which converts the loss into a tax and reporting event anyway. Finally, do not mix serialized, lot-controlled or hazardous items into the same pool as ordinary catalog goods, since their disposal costs differ.

**Cta:** If you want dead stock lists, last-sale dates and vendor return eligibility pulled straight from your ERP data instead of exported by hand, Netray can set that up read-only.

**Faq:**

#### What carrying cost rate should I use?

**Answer:** Many distributors land between 18 and 30 percent annually once capital cost, space, insurance, taxes, shrink and handling are included. Use your finance team's cost of capital plus a measured storage and handling figure rather than a default.

#### Does this include tax write-off benefits?

**Answer:** No. Write-downs and donations can change the after-tax picture, and rules vary by country and entity. Use the pre-tax result to rank options, then have your controller model the tax effect.

#### How do I find dead stock in Prophet 21?

**Answer:** Use your inventory reports or a custom query filtered by last sale date and on-hand quantity, then total the cost value. The exact report name varies by configuration, so check with your P21 administrator.

#### Should I always liquidate?

**Answer:** No. If the break-even is longer than the time you realistically need, or the item has contractual demand coming, holding can win. The tool shows the crossover so the decision is explicit.

## Search terms

dead stock calculator, obsolete inventory write down calculator, hold vs liquidate inventory, prophet 21 dead stock report, slow moving inventory carrying cost, distributor excess inventory calculator, inventory liquidation break even

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
