# Pallets per Truck Load Calculator with Cost per Pallet

> Source: https://netray.co/tools/pallets-per-truck-load-and-cost-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Work out how many pallets fit on a trailer by floor positions, stacking and weight, how many trucks you need and what each pallet costs to move.

## Category

supply-chain

## Audience

- Logistics coordinator
- Transport planner
- Warehouse manager

## Tool

**Kind:** calculator

**Currency:** $

**Inputs:**

#### Pallets to ship

**Key:** pallets

**Type:** number

**Default:** 60

**Min:** 1

**Step:** 1

**Unit:** pallets

#### Weight per loaded pallet

**Key:** pallet_kg

**Type:** number

**Default:** 650

**Min:** 10

**Step:** 10

**Unit:** kg

#### Loaded pallet height

**Key:** pallet_h

**Type:** number

**Default:** 120

**Min:** 20

**Step:** 5

**Unit:** cm

**Help:** Including the pallet itself.

#### Vehicle floor positions

**Key:** positions

**Type:** select

**Default:** 26

**Options:**

##### 26ft box truck (about 12 positions)

**Value:** 12

##### 53ft US trailer, 48x40 in pallets (26 positions)

**Value:** 26

##### 13.6m EU trailer, Euro pallets (33 positions)

**Value:** 33

**Help:** Single-layer floor positions. Mixed pallet sizes change this.

#### Usable inside height

**Key:** inside_h

**Type:** number

**Default:** 270

**Min:** 100

**Step:** 5

**Unit:** cm

#### Can pallets be double stacked?

**Key:** stack

**Type:** select

**Default:** 0

**Options:**

##### No, single layer only

**Value:** 0

##### Yes, stack where height allows

**Value:** 1

#### Max payload per truck

**Key:** payload

**Type:** number

**Default:** 20000

**Min:** 1000

**Step:** 500

**Unit:** kg

#### Truck rate for the lane

**Key:** rate

**Type:** number

**Default:** 1800

**Min:** 0

**Step:** 50

**Unit:** $ per truck

**Outputs:**

#### Layers per position

**Key:** levels

**Expr:** if(eq(stack, 1), clamp(floor(inside_h / pallet_h), 1, 2), 1)

**Format:** integer

#### Pallet capacity by space

**Key:** slots

**Expr:** positions * levels

**Format:** integer

#### Pallet capacity by weight

**Key:** by_wt

**Expr:** floor(payload / pallet_kg)

**Format:** integer

#### Pallets per truck

**Key:** per_truck

**Expr:** min(slots, by_wt)

**Format:** integer

**Primary:** true

**Description:** Lower of the space and weight limits.

#### Trucks needed

**Key:** trucks

**Expr:** ceil(pallets / per_truck)

**Format:** integer

**Primary:** true

#### Total freight cost

**Key:** total_cost

**Expr:** trucks * rate

**Format:** currency

#### Cost per pallet

**Key:** cost_pallet

**Expr:** total_cost / pallets

**Format:** currency

#### Weight utilization of a full truck

**Key:** wt_util

**Expr:** per_truck * pallet_kg / payload * 100

**Format:** percent

**Chart:**

#### Pallets per truck vs pallet weight

**Type:** line

**X:** pallet_kg

**From:** 200

**To:** 1500

**Steps:** 27

**Series:**

- per_truck

**Disclaimer:** Planning estimate. Axle weight distribution, pallet overhang and carrier loading rules can reduce real capacity.

## Content

**Intro:** Truckload pricing is per truck, so the cost of each pallet depends on how many you can load. This calculator applies the space limit and the weight limit, then gives you trucks needed and freight cost per pallet.

**Sections:**

#### How to use the pallet load calculator

**Body:** Enter the number of pallets, the weight and height of one loaded pallet, and choose the vehicle. A 53ft US trailer takes 26 standard 48x40 inch pallets in a single layer, and a 13.6m European trailer takes 33 Euro pallets. Add the usable inside height and say whether the pallets can be double stacked. Then enter the payload limit and the truck rate. The result shows pallets per truck, trucks required, total cost and cost per pallet.

#### How the calculation works

**Body:** Layers per position equal the floor of inside height divided by pallet height, limited to two and only when stacking is allowed. Pallet capacity by space is floor positions times layers. Capacity by weight is payload divided by pallet weight, rounded down. Pallets per truck is the smaller number, trucks needed is pallets divided by that, rounded up, and cost per pallet is trucks times rate divided by pallets.

**Bullets:**

- Heavy pallets weigh out: at 1,000 kg a 20 tonne truck carries only 20 pallets.
- Light pallets cube out, so stacking is the main lever.
- Partly filled last trucks raise cost per pallet, so look at consolidating with other orders.

#### Reading the chart and the result

**Body:** The chart sweeps pallet weight and shows where the binding limit switches from space to weight. Below that weight, adding stacking or better pallet patterns helps. Above it, only more payload capacity or lighter packaging helps. If cost per pallet is much higher than your price lists assume, check whether a partial truck or LTL rate would be cheaper than a dedicated vehicle for the last few pallets.

#### Common mistakes

**Body:** Do not assume a truck's legal gross weight is its cargo limit; subtract tractor, trailer and fuel. Do not stack pallets that are not rated for it, and remember that stacking on mixed pallet sizes wastes positions. Euro pallets are 120x80 cm and US pallets are 48x40 inches, about 122x102 cm, so a trailer loaded with the wrong type holds fewer pallets than the table suggests. Always confirm the rate basis with the carrier.

**Cta:** Netray can feed open sales orders and delivery lines from your ERP into this kind of load calculation, so planners see truck fill before booking transport.

**Faq:**

#### How many pallets fit in a 53 foot trailer?

**Answer:** A 53ft trailer holds 26 standard 48x40 inch pallets in a single layer using a pinwheel pattern. If pallets are stackable and light enough, double stacking can approach 52 pallets, but weight limits usually bind first.

#### How many Euro pallets fit in a standard EU trailer?

**Answer:** A 13.6m curtain-sider or box trailer holds 33 Euro pallets (120x80 cm) in a single layer, or 34 when loaded across with certain patterns. Industrial pallets (120x100 cm) fit 26 to 28.

#### Is the truck rate always per truck?

**Answer:** For full truckload, yes. For LTL or part-load, rates are quoted per pallet, per kg or per linear metre. Use the cost per pallet result to compare a full truck against part-load quotes.

#### What payload should I use?

**Answer:** Use the lower of the vehicle's rated payload and the legal limit on your route. In the US a 53ft trailer typically carries about 20 tonnes. In the EU the limit is usually 24 to 26 tonnes of cargo.

## Search terms

pallets per truck calculator, how many pallets fit in a 53 foot trailer, how many euro pallets in a 13.6m trailer, truck load calculator, freight cost per pallet, trailer pallet capacity, full truckload cost per pallet, pallet stacking height calculator

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
