# PCBA NRE and Stencil Amortization Per Unit Calculator

> Source: https://netray.co/tools/pcba-nre-stencil-amortization-per-unit-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Amortize stencil, programming, fixture and DFM NRE plus line setup and first article time over your order size, then see loaded cost, quoted unit price and how much of the price is one-time cost.

## Category

cost-finance

## Industry

Electronics Manufacturing

## Audience

- EMS estimator
- Cost engineer
- Operations manager

## Tool

**Kind:** calculator

**Currency:** $

**Inputs:**

#### Order quantity

**Key:** qty

**Type:** number

**Default:** 500

**Min:** 1

**Step:** 25

**Unit:** boards

**Help:** Boards per order. Setup and first article time recur with every order.

#### Orders over which NRE is recovered

**Key:** orders

**Type:** slider

**Default:** 1

**Min:** 1

**Max:** 10

**Step:** 1

**Unit:** orders

**Help:** 1 means the customer pays all NRE inside this order. Higher numbers assume repeat business.

#### Stencil cost

**Key:** stencil

**Type:** number

**Default:** 280

**Min:** 0

**Step:** 10

**Unit:** $

**Help:** Laser cut stainless stencil, framed or frameless, per side. Add both sides if double sided.

#### SMT, AOI and feeder program NRE

**Key:** program_nre

**Type:** number

**Default:** 350

**Min:** 0

**Step:** 25

**Unit:** $

**Help:** Centroid conversion, placement program, AOI library, feeder setup sheet.

#### Test fixture or flying probe program

**Key:** test_fixture

**Type:** number

**Default:** 1200

**Min:** 0

**Step:** 50

**Unit:** $

**Help:** ICT or functional fixture, or flying probe program. Enter 0 if none.

#### DFM review and panel tooling

**Key:** dfm_nre

**Type:** number

**Default:** 180

**Min:** 0

**Step:** 10

**Unit:** $

**Help:** Engineering hours for DFM, panel drawing and process planning.

#### Line setup time per order

**Key:** setup_hours

**Type:** number

**Default:** 2.5

**Min:** 0

**Step:** 0.25

**Unit:** hours

**Help:** Kitting verification, feeder loading, stencil and printer setup, reflow profile check.

#### First article time per order

**Key:** fa_hours

**Type:** number

**Default:** 1

**Min:** 0

**Step:** 0.25

**Unit:** hours

**Help:** First article build, inspection and signoff before the run.

#### Setup labor and machine rate

**Key:** labor_rate

**Type:** number

**Default:** 85

**Min:** 0

**Step:** 5

**Unit:** $/hour

**Help:** Fully loaded blended rate for setup crew and idle line time.

#### Recurring cost per board

**Key:** unit_cost_base

**Type:** number

**Default:** 11.6

**Min:** 0

**Step:** 0.1

**Unit:** $

**Help:** Material, placement, reflow, inspection and test cost per board, excluding NRE and setup.

#### Target gross margin

**Key:** margin

**Type:** slider

**Default:** 22

**Min:** 0

**Max:** 60

**Step:** 1

**Unit:** %

**Help:** Margin on selling price, not markup on cost.

**Outputs:**

#### Total one-time NRE

**Key:** nre_total

**Expr:** stencil + program_nre + test_fixture + dfm_nre

**Format:** currency

**Description:** Stencil plus programming plus fixture plus DFM.

#### Setup and first article cost per order

**Key:** setup_cost

**Expr:** (setup_hours + fa_hours) * labor_rate

**Format:** currency

**Description:** Recurs with each order.

#### NRE per board

**Key:** nre_unit

**Expr:** nre_total / (qty * orders)

**Format:** currency

**Description:** NRE divided by boards across all orders in the recovery window.

#### Setup per board

**Key:** setup_unit

**Expr:** setup_cost / qty

**Format:** currency

#### Loaded cost per board

**Key:** loaded_cost

**Expr:** unit_cost_base + nre_unit + setup_unit

**Format:** currency

**Primary:** true

#### Quoted unit price

**Key:** price_unit

**Expr:** loaded_cost / (1 - margin / 100)

**Format:** currency

**Primary:** true

**Description:** Price that delivers the target gross margin on the loaded cost.

#### Order value

**Key:** order_price

**Expr:** price_unit * qty

**Format:** currency

#### One-time cost share of loaded cost

**Key:** nre_share

**Expr:** (nre_unit + setup_unit) / loaded_cost * 100

**Format:** percent

**Description:** Above roughly 15 to 20 percent, customers usually push back on volume or ask for NRE to be billed separately.

**Chart:**

#### NRE and setup per board vs order quantity

**Type:** line

**X:** qty

**From:** 25

**To:** 2500

**Steps:** 40

**Series:**

- nre_unit
- setup_unit

**Disclaimer:** Planning estimate. Amortizing NRE into the unit price is a commercial choice; many EMS providers bill NRE as a separate line item. Margin is applied to everything including NRE.

## Content

**Intro:** Low volume PCBA quotes are won or lost on how one-time costs are handled. This calculator spreads stencil, programming, fixture and DFM engineering plus per-order line setup over your quantity, and shows what share of the unit price is not material or labor at all.

**Sections:**

#### How to use the calculator

**Body:** Enter the order quantity and the number of orders over which you expect to recover NRE. Fill in the one-time items (stencil, SMT and AOI program, fixture or flying probe program, DFM and panel tooling) and the per-order items (line setup hours and first article hours at a blended rate). Enter your recurring cost per board from your cost model, then set the target gross margin. The sweep chart shows how quickly NRE and setup per board fall as quantity rises, which is the fastest way to explain to a buyer why a 50 piece order costs so much more per board than a 500 piece order.

#### The formulas behind it

**Body:** NRE per board is total NRE divided by quantity times the number of orders. Setup per board is (setup hours plus first article hours) times the rate, divided by quantity. Loaded cost is recurring cost plus both. Unit price is loaded cost divided by (1 minus margin), which is the standard gross margin formula, not a markup. These are straight cost accounting identities, so you can check any result by hand.

**Bullets:**

- NRE total = stencil + program + fixture + DFM
- Setup per order = (setup h + first article h) x rate
- Loaded cost = recurring + NRE/(qty x orders) + setup/qty
- Price = loaded cost / (1 - margin)

#### Reading the result

**Body:** Look at the one-time cost share. At 50 boards with the defaults, NRE and setup can exceed half the loaded cost; at 2,000 boards it falls to a few percent. If the share is high, you have three levers: bill NRE as a separate line so the unit price stays comparable across tiers, raise the recovery window if the customer commits to repeat orders, or reduce the NRE itself by reusing a customer stencil or a standard panel. Stencil cost is also a place to check frame type, thickness and whether both sides need separate foils.

#### Common mistakes

**Body:** The most frequent error is amortizing NRE over orders that never arrive. Recover it over a realistic window, and state in the quote whether NRE is non-refundable. A second error is forgetting that setup recurs with every order, so it should divide by the order quantity, not by lifetime volume. Third, many shops forget first article time and reflow profile verification. Finally, apply margin to the full loaded cost; if NRE is billed separately at cost, exclude it from this calculation to avoid double counting.

**Bullets:**

- Do not amortize setup over lifetime volume
- Say whether NRE is refundable or credited at a volume
- Include both stencil sides on double sided boards
- Keep recurring cost free of any NRE you bill separately

**Cta:** If your quote inputs sit in an ERP or a spreadsheet maze, we can wire this logic to live routing and BOM data so NRE and setup flow into quotes automatically, on your own servers if needed.

**Faq:**

#### Should NRE be in the unit price or a separate line?

**Answer:** Both are common. Separate NRE keeps unit prices comparable across quantity tiers and makes repeat orders cheaper to quote. Embedding it simplifies the buyer view but hides cost and creates disputes on reorders. Whichever you choose, state it plainly on the quote.

#### What does a typical SMT stencil cost?

**Answer:** Laser cut stainless stencils for typical boards are usually in the low hundreds of dollars, depending on size, frame, thickness and finishes like nano coating or step features. Check your supplier price list, as it varies by region and quantity.

#### How many orders should I amortize NRE over?

**Answer:** Only as many as the customer has credibly committed to. Without a forecast or blanket order, treat the first order as bearing the full NRE or bill it separately. Optimistic amortization is a common cause of margin loss on prototypes that never reorder.

#### Is setup really per order and not per lot?

**Answer:** Setup recurs whenever the line is changed over to the job, so it recurs per production lot or run. If you split one order into multiple releases, each release can trigger setup again, so enter hours per release and quantity per release.

## Search terms

pcba nre calculator, stencil cost amortization, ems nre cost per unit, smt setup cost per board, pcb assembly nre charges, how to quote nre pcba, low volume pcba pricing, pcba quote nre amortization excel

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
