# PCBA Turnkey Quote Letter Template

> Source: https://netray.co/tools/pcba-turnkey-quote-letter-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Fill in your company, customer, assembly, price tiers, NRE, lead time and terms to produce a quote document with explicit assumptions and exclusions.

## Category

industry-templates

## Industry

Electronics Manufacturing

## Audience

- EMS estimator
- Sales engineer
- Contract manager

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Your company

**Key:** company

**Type:** text

**Default:** Northfield Electronics Assembly

#### Customer company

**Key:** customer

**Type:** text

**Default:** Harbor Instruments Inc.

#### Customer contact

**Key:** contact

**Type:** text

**Default:** Procurement team

#### Quote number

**Key:** quote_no

**Type:** text

**Default:** Q-26-1042

#### Quote date

**Key:** quote_date

**Type:** date

**Default:** 2026-10-20

#### Quote valid for (days)

**Key:** valid_days

**Type:** number

**Default:** 30

#### Assembly name

**Key:** assy

**Type:** text

**Default:** Sensor Interface Board

#### Part number and revision

**Key:** pn

**Type:** text

**Default:** SIB-2200 Rev C

#### Build type

**Key:** build_type

**Type:** select

**Options:**

- Full turnkey
- Partial turnkey
- Consigned (kitted)

**Default:** Full turnkey

#### Workmanship standard

**Key:** ipc_class

**Type:** select

**Options:**

- IPC-A-610 Class 2
- IPC-A-610 Class 3
- IPC-A-610 Class 2 with J-STD-001

**Default:** IPC-A-610 Class 2

#### Solder alloy and process

**Key:** finish

**Type:** select

**Options:**

- Lead-free (RoHS)
- Tin-lead
- Lead-free, selective wave

**Default:** Lead-free (RoHS)

#### Tier 1 quantity

**Key:** qty_1

**Type:** number

**Default:** 50

#### Tier 1 unit price

**Key:** price_1

**Type:** text

**Default:** $62.40

#### Tier 2 quantity

**Key:** qty_2

**Type:** number

**Default:** 250

#### Tier 2 unit price

**Key:** price_2

**Type:** text

**Default:** $48.15

#### Tier 3 quantity

**Key:** qty_3

**Type:** number

**Default:** 1000

#### Tier 3 unit price

**Key:** price_3

**Type:** text

**Default:** $41.90

#### One-time NRE (stencil, programming, fixture)

**Key:** nre

**Type:** text

**Default:** $1,150, billed with first order

#### Lead time after kit complete

**Key:** lead_time

**Type:** text

**Default:** 15 working days

#### Shipping terms

**Key:** ship_terms

**Type:** select

**Options:**

- FCA our facility
- EXW our facility
- DDP customer site

**Default:** FCA our facility

#### Payment terms

**Key:** payment

**Type:** select

**Options:**

- Net 30
- Net 45
- 50 percent deposit, balance net 30
- Prepaid

**Default:** Net 30

#### Assumptions

**Key:** assumptions

**Type:** textarea

**Default:** Pricing assumes the BOM, Gerber, centroid and assembly drawing package received on the quote date. Component prices are held for the validity period and are subject to stock availability at order. Attrition and MOQ overage are included to the extent stated in the BOM costing.

#### Exclusions

**Key:** exclusions

**Type:** textarea

**Default:** Excludes conformal coating, box build, programming of customer firmware, burn-in, and customer specific labeling unless listed. Excludes tariffs or duties changed after the quote date. Excludes engineering changes after order.

**Blocks:**

#### Quotation {{quote_no}}

**Body:** From: {{company}}
To: {{customer}}, attention {{contact}}
Date: {{quote_date}}
Valid for: {{valid_days}} days from the quote date

#### Scope

**Body:** Assembly: {{assy}}
Part number and revision: {{pn}}
Build type: {{build_type}}
Workmanship: {{ipc_class}}
Process: {{finish}}

#### Pricing

**Table:**

**Columns:**

- Quantity
- Unit price (USD)
- Notes

**Rows:**

**0:** {{qty_1}}

**1:** {{price_1}}

**2:** Per assembled and tested board

**0:** {{qty_2}}

**1:** {{price_2}}

**2:** Per assembled and tested board

**0:** {{qty_3}}

**1:** {{price_3}}

**2:** Per assembled and tested board

#### One-time charges

**Body:** NRE: {{nre}}

#### Lead time and shipping

**Body:** Lead time: {{lead_time}}
Shipping terms: {{ship_terms}}
Payment terms: {{payment}}

#### Assumptions

**Body:** {{assumptions}}

#### Exclusions

**Body:** {{exclusions}}

#### Acceptance

**Signatures:**

- Prepared by
- Customer authorized signature
- Date

**Notes:** A starting point for a commercial quote, not legal advice. Have counsel review your standard terms on warranty, liability, intellectual property, ITAR or export control, and cancellation or rescheduling charges. Add component price validity and lead time caveats that match your procurement reality.

## Content

**Intro:** A quote that leaves out assumptions is an invitation to a dispute. This template produces a clear turnkey PCBA quote with price tiers, NRE, lead time and explicit assumptions and exclusions you can export as PDF or Word.

**Sections:**

#### How to use the template

**Body:** Fill the company, customer and assembly fields, then enter price tiers from your costing worksheet. Select the build type (full turnkey, partial turnkey or consigned), the workmanship standard and the solder process, since each changes cost and responsibilities. Add NRE, lead time, shipping and payment terms. Edit the assumptions and exclusions to match the job and export the document. The signature block gives the customer a place to accept the quote with their purchase order reference.

#### What a good quote states

**Body:** The assumptions and exclusions sections matter most. They define what the price covers: the data package revision, component availability, validity period, overage, and what happens if tariffs or prices move. Exclusions prevent surprises about coating, box build, firmware loading, burn-in, labeling and engineering changes. State how long prices are held, who owns long lead material risk, and how excess inventory and cancellation are handled.

**Bullets:**

- Revision of BOM, Gerber and drawings quoted
- Price validity and lead time basis
- Treatment of excess material and cancellation
- Workmanship class and any test included

#### Choosing a build type

**Body:** In full turnkey you buy all parts and carry the material risk, so assumptions on lead time and price validity are essential. In partial turnkey the customer supplies selected parts and you must define receiving, shortages and attrition on consigned items. In consigned builds you quote labor and process only, and should specify overage, kitting accuracy and who pays when parts are short or damaged. The right wording differs for each, so change the assumption text rather than leaving the default.

#### Common mistakes

**Body:** Leaving out the revision of the BOM and drawings makes every later change a pricing argument. Quoting a firm price on parts with volatile availability, without a validity limit, shifts all risk to you. Mixing IPC classes silently is another problem: Class 3 inspection and documentation costs more and should be explicit. Finally, do not send a quote without checking for export control restrictions on the technical data and destination.

**Bullets:**

- Quote against a specific revision
- Set a price validity limit
- Name the IPC class
- Check export control before sharing data

**Cta:** If you generate quotes from an ERP, we can fill this structure automatically from BOM, routing and price data, with a human review step before anything goes to a customer.

**Faq:**

#### How long should a PCBA quote be valid?

**Answer:** Often 30 days, shorter if component prices or availability are volatile. Tie validity to your supplier quote validity so you are not holding prices you cannot buy at.

#### Should NRE appear on the quote?

**Answer:** Yes. List it as its own line with when it is billed and whether it is refundable or credited. Hidden NRE inside unit prices causes confusion on reorders.

#### What is the difference between full and partial turnkey?

**Answer:** In full turnkey the assembler procures all parts. In partial turnkey the customer supplies some parts, often long lead or proprietary items, and the assembler buys the rest. Responsibility for shortages and damage should be defined for the supplied parts.

#### Does this template include terms and conditions?

**Answer:** It includes the commercial essentials only. Attach your standard terms and conditions and have counsel review them. The notes remind you which items, such as warranty and liability, deserve legal review.

## Search terms

pcba quote template, pcb assembly quotation format, ems quote letter, turnkey pcb assembly quote sample, electronics manufacturing quotation template, pcba quote assumptions exclusions, contract manufacturer quote format word, pcb assembly proposal template

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
