# Pennsylvania Manufacturing Sales Tax Exemption Checklist

> Source: https://netray.co/tools/pennsylvania-manufacturing-sales-tax-exemption-checklist
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A practical checklist for claiming the Pennsylvania manufacturing exemption from sales and use tax: qualification tests, the exemption certificate, ERP exempt tax code setup and credits worth reviewing.

## Category

compliance-legal

## Region

United States (Pennsylvania)

## Audience

- Controller
- Tax manager
- ERP administrator
- Purchasing

## Tool

**Kind:** checklist

**Groups:**

#### 1. Does the business qualify?

**Items:**

**Text:** The activity is manufacturing, processing, mining, dairying or similar production of tangible personal property for sale, not only assembly of real estate or repair

**Critical:** true

**Text:** The business is registered with the Pennsylvania Department of Revenue and has a sales tax license / account number

**Critical:** true

You can describe the product being manufactured and the stages in the process

You have identified which departments and lines are production versus administrative or warehouse

You have read the Department of Revenue guidance on the manufacturing exemption, or have a tax adviser's written position

You know the sales tax rate is 6 percent statewide, with additional local tax in Allegheny and Philadelphia counties, so the exposure is quantified

#### 2. Which purchases are in scope?

**Items:**

**Text:** Machinery and equipment used directly in manufacturing have been listed, with the stage of the process each supports

**Critical:** true

Repair and replacement parts for exempt machinery are reviewed under the same test

Supplies and materials consumed in the manufacturing process are identified (catalysts, tooling that is consumed, cutting fluid used in production)

Raw materials and components that become part of the product are treated as purchases for resale / ingredients, not tangible consumed supplies

Utilities (electricity, gas, water) used directly in production are separated from facility use through a documented study or meter

Items used mainly in administration, shipping, storage after production, R&D or maintenance of buildings are marked taxable unless a rule says otherwise

Construction contractor purchases for real estate are handled separately, because contractors generally pay tax on materials they install

Rented or leased equipment used directly in manufacturing is reviewed for the same exemption

#### 3. The exemption certificate

**Items:**

**Text:** The current Pennsylvania exemption certificate form (REV-1220 at the time of writing; confirm on the Department of Revenue site) is downloaded

**Critical:** true

The manufacturing exemption box and a description of the item or property are completed correctly

Business name, address, sales tax license number and signature match registration records

A certificate is issued to each vendor, not just to the largest

Blanket versus single-purchase use is decided and written on the certificate

**Text:** Copies are stored with the vendor master record and available to auditors

**Critical:** true

Utility providers receive the certificate or the exempt percentage per the utility's process

#### 4. ERP and AP setup

**Items:**

**Text:** An exempt tax code (or tax group) for Pennsylvania manufacturing exemption exists in the ERP, with zero rate and a clear name

**Critical:** true

Vendors holding your certificate are flagged exempt in the vendor master

Item classes are marked as production or non-production so the right tax code defaults on POs

Fixed assets purchased as manufacturing equipment carry the exempt code and the asset category

**Text:** Use tax accrual runs for purchases taxed incorrectly or where the vendor did not charge tax

**Critical:** true

AP invoice review checks that vendor-charged tax matches the code and creates a refund request when wrong

A report exists listing exempt purchases by vendor, GL account and amount for audit support

Exemption certificate expiry or review dates are tracked per vendor

#### 5. Credits and incentives to review separately

**Items:**

Pennsylvania Research and Development tax credit: check eligibility for qualified R&D expenses, annual caps and the application period

Job Creation Tax Credit and other DCED programs: check whether a project qualifies before hiring or investing

Keystone Opportunity Zones and other local abatements for real estate or business taxes

Corporate net income tax rate schedule: confirm the current year's rate with the Department of Revenue

Federal incentives such as bonus depreciation or Section 179 are reviewed by your accountant, since state conformity differs

Written position memo from your tax adviser is on file for audit

**Scoring Note:** This checklist is general information, not tax advice. The Pennsylvania manufacturing exemption depends on the facts of what is used directly in the production process, and rules change. Confirm form numbers, rates and tests with the Pennsylvania Department of Revenue or a qualified tax adviser before relying on them.

## Content

**Intro:** Pennsylvania exempts machinery, equipment and certain supplies used directly in manufacturing from sales and use tax, but you have to claim the exemption correctly and set up your purchasing and ERP so it holds up on audit. This checklist walks through the qualification test, the exemption certificate, the ERP tax codes and the credits to review.

**Sections:**

#### How to use the checklist

**Body:** Work through the five groups in order. First confirm that your activity is manufacturing as the Department of Revenue defines it. Then list the purchases that are used directly in production, and separate them from administration, storage and building costs. Next, issue the exemption certificate to vendors and store copies. Finally, make the ERP do the work: exempt tax codes, vendor flags and a use tax accrual for anything missed. Tick items as you go, then export the sheet to PDF as your working file for the tax adviser.

#### The core tests: directly used and production stages

**Body:** The exemption turns on use, not on what the item is. Equipment used directly in the manufacturing process, from the point raw materials are first processed to the point the finished product is ready for sale, is generally eligible. Equipment used before the process starts, after it ends, or for general plant purposes usually is not. A forklift moving raw material from the dock may fail the test, where a conveyor inside the process may pass. Document each major item with the process step it supports, because auditors ask for that explanation.

**Bullets:**

- Keep a simple asset-by-asset schedule with the production step.
- Document utilities with a study or sub-meter when use is mixed.
- Treat mixed-use items conservatively and document the allocation.

#### ERP setup: exempt tax code and use tax

**Body:** Create a zero-rate tax code for the Pennsylvania manufacturing exemption and apply it to eligible item classes and vendors. In most ERPs this means a tax code or group, a default on the item or vendor, and a GL mapping, and the terminology varies by product. Add a use tax accrual for purchases where the vendor charged no tax but the item is taxable, since the use tax obligation is yours. Finally, build an exempt purchases report by vendor and GL account, which is the first thing an auditor will request.

#### Common mistakes and audit risks

**Body:** The usual errors are claiming the exemption on everything a plant buys, forgetting that office and warehouse purchases are taxable, not keeping certificates on file, and failing to review utilities. Another is relying on a vendor's assumption: the buyer carries the burden of showing the exemption applies. Refund claims for tax paid in error have a time limit, so review past invoices early. Credits are separate programs with their own applications, caps and deadlines, so verify them with the agency that runs them.

**Cta:** If your purchase history and item master are in an ERP, we can build a private assistant on your own servers that flags likely taxable purchases coded exempt, with the query shown so your tax team can verify it.

**Faq:**

#### What is the Pennsylvania manufacturing sales tax exemption?

**Answer:** Pennsylvania generally exempts from sales and use tax the purchase of machinery, equipment, parts and certain supplies used directly in manufacturing, processing and similar production. The claim is made by giving the vendor an exemption certificate. Whether an item qualifies depends on how it is used, so confirm with the Department of Revenue.

#### What form do I use to claim the exemption in PA?

**Answer:** Pennsylvania uses an exemption certificate, currently Form REV-1220 at the time of writing. You complete it with your sales tax license number, the exemption claimed and a description of the property, then give it to the vendor. Confirm the current version on the Department of Revenue website.

#### Are there Pennsylvania manufacturing tax credits?

**Answer:** Yes, there are several separate programs, such as the Research and Development tax credit and the Job Creation Tax Credit, plus local abatements in zones like Keystone Opportunity Zones. Each has its own eligibility, caps and application timing, so check the details with the administering agency.

#### What if I paid sales tax on something that was exempt?

**Answer:** You can generally seek a refund within the statutory time limit, from the vendor or through a claim with the Department of Revenue, depending on the situation. Gather the invoice, certificate and a description of the use. Ask a tax adviser about deadlines for your case.

## Search terms

pennsylvania manufacturing sales tax exemption, pennsylvania manufacturing exemption form, tax exempt for manufacturing in pa, manufacturing sales tax exemption pa, pennsylvania manufacturing exemption, pennsylvania manufacturing sales tax, pennsylvania manufacturing tax credit, pa exemption certificate manufacturing

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
