# Phishing Simulation Tracking Worksheet

> Source: https://netray.co/tools/phishing-simulation-results-tracking-worksheet
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Log each phishing simulation with sent, clicked, reported and credential counts. Click, report and compromise rates are calculated per campaign and overall.

## Category

ehs-workforce

## Industry

Discrete Manufacturing

## Audience

- IT security lead
- Security awareness manager

## Tool

**Kind:** worksheet

**Mode:** editable

**Columns:**

#### Campaign

**Key:** campaign

**Type:** text

#### Launch date

**Key:** date

**Type:** date

#### Audience

**Key:** group

**Type:** select

**Options:**

- All staff
- Office
- Plant floor
- Finance
- Executives
- IT
- New hires

#### Lure type

**Key:** lure

**Type:** select

**Options:**

- Credential link
- Invoice attachment
- Shipping notice
- HR notice
- MFA reset
- QR code
- Vendor request

#### Sent

**Key:** sent

**Type:** number

#### Clicked

**Key:** clicked

**Type:** number

#### Entered credentials

**Key:** creds

**Type:** number

#### Reported

**Key:** reported

**Type:** number

#### Click rate

**Key:** click_rate

**Type:** number

**Expr:** if(gt(sent,0), clicked / sent * 100, 0)

**Format:** percent

#### Credential rate

**Key:** cred_rate

**Type:** number

**Expr:** if(gt(sent,0), creds / sent * 100, 0)

**Format:** percent

#### Report rate

**Key:** report_rate

**Type:** number

**Expr:** if(gt(sent,0), reported / sent * 100, 0)

**Format:** percent

**Rows:**

**Campaign:** Q1 invoice lure

**Date:** 2026-01-20

**Group:** Finance

**Lure:** Invoice attachment

**Sent:** 40

**Clicked:** 9

**Creds:** 3

**Reported:** 8

**Campaign:** Q1 shipping notice

**Date:** 2026-02-17

**Group:** Office

**Lure:** Shipping notice

**Sent:** 120

**Clicked:** 22

**Creds:** 7

**Reported:** 31

**Campaign:** Q2 MFA reset

**Date:** 2026-05-12

**Group:** All staff

**Lure:** MFA reset

**Sent:** 380

**Clicked:** 52

**Creds:** 19

**Reported:** 96

**Campaign:** Q2 plant HR notice

**Date:** 2026-06-09

**Group:** Plant floor

**Lure:** HR notice

**Sent:** 150

**Clicked:** 31

**Creds:** 6

**Reported:** 24

**Campaign:** Q3 QR code poster

**Date:** 2026-09-08

**Group:** All staff

**Lure:** QR code

**Sent:** 380

**Clicked:** 41

**Creds:** 12

**Reported:** 118

**Totals:**

#### Total sent

**Key:** sent

**Agg:** sum

**Format:** integer

#### Total clicked

**Key:** clicked

**Agg:** sum

**Format:** integer

#### Total credentials entered

**Key:** creds

**Agg:** sum

**Format:** integer

#### Total reported

**Key:** reported

**Agg:** sum

**Format:** integer

**Summary:**

#### Overall click rate

**Key:** overall_click

**Expr:** if(gt(sum_sent,0), sum_clicked / sum_sent * 100, 0)

**Format:** percent

**Primary:** true

#### Overall credential rate

**Key:** overall_cred

**Expr:** if(gt(sum_sent,0), sum_creds / sum_sent * 100, 0)

**Format:** percent

#### Overall report rate

**Key:** overall_report

**Expr:** if(gt(sum_sent,0), sum_reported / sum_sent * 100, 0)

**Format:** percent

**Primary:** true

#### Reports per click

**Key:** report_to_click

**Expr:** if(gt(sum_clicked,0), sum_reported / sum_clicked, 0)

**Format:** decimal

**Description:** Above 1 means more people report than click.

**Notes:** Replace the sample rows with your own campaigns. Report rate is the number of people who reported divided by messages sent. Count each person once per campaign. Use simulations for learning, not punishment, and avoid naming individuals in the shared version.

## Content

**Intro:** Phishing simulations only help if you track what changed. This worksheet records each campaign by audience and lure, calculates click, credential and report rates, and gives you an overall trend you can show management.

**Sections:**

#### How to use the worksheet

**Body:** Add one row per campaign and audience. Enter how many messages were sent, how many people clicked, how many entered credentials on the landing page and how many reported the message through the report button or to the security mailbox. The rate columns calculate themselves. Export to Excel to chart the trend. Compare like with like: the same audience and a similar lure difficulty, otherwise a lower click rate may only mean an easier test.

**Bullets:**

- One row per campaign and audience
- Count unique people, not repeat clicks
- Keep lure types consistent for comparisons

#### Which rate matters most

**Body:** Click rate is the number everyone quotes, but report rate is the better sign of a healthy culture, because reported messages give your team an early warning in a real attack. Credential rate shows who went all the way. A falling click rate with a rising report rate is the pattern to aim for. Plant floor staff often have no daily email use, so compare them against themselves, not against the office, and consider SMS, QR code and USB lures that match how they are really targeted.

#### Common mistakes

**Body:** Do not turn simulations into a punishment scheme, because staff then stop reporting. Do not run the same easy lure repeatedly and call the result progress. Make sure your mail filter allow-lists the simulation domains, or the data will be wrong. And remember that the real aim is behaviour change: pair each campaign with short training and a visible way to report.

**Bullets:**

- Check allow-listing before launch
- Vary lure difficulty and channel
- Reward reporting
- Track results by group but protect individual privacy

**Cta:** If you want phishing and awareness data combined with ERP user roles to focus training on people with payment or purchasing rights, Netray can talk through a private approach. The worksheet needs no sign-up.

**Faq:**

#### What is a good phishing click rate?

**Answer:** It depends on lure difficulty and audience. Many programs start in the double digits and aim for single digits over time. Focus on the trend, and on rising report rates, rather than comparing to another company's number.

#### How often should we run simulations?

**Answer:** Monthly or quarterly is common, with short training right after. More frequent sends to the same people tends to cause fatigue. Rotate lure types and audiences, including finance and executives.

#### How do I treat people who entered credentials?

**Answer:** Give immediate, private micro-training and reset guidance in a learning tone. Escalate repeated high-risk behaviour through coaching, not public shaming, so reporting stays safe.

#### Can I include plant floor employees without company email?

**Answer:** Yes. Use other channels they actually use, such as SMS or QR codes on notice boards, and compare them with their own past results. Log those campaigns here with a matching lure type.

## Search terms

phishing simulation tracking spreadsheet, phishing campaign results template, phishing click rate tracker, security awareness metrics excel, phishing test results template, phishing report rate, phishing simulation worksheet

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
