# Pick and Place Centroid CSV Converter: Python Script Generator

> Source: https://netray.co/tools/pick-and-place-centroid-file-converter-python-generator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Fill a few fields and get a Python script that reads a centroid CSV, applies offsets and writes a machine ready file.

## Category

developer

## Industry

Electronics Manufacturing

## Audience

- SMT programmer
- NPI engineer
- PCBA process engineer

## Tool

**Kind:** template

**Output:** code

**Language:** python

**Fields:**

#### Input CSV file name

**Key:** in_file

**Type:** text

**Default:** board_pos.csv

#### Output CSV file name

**Key:** out_file

**Type:** text

**Default:** machine_pnp.csv

#### Input column: reference designator

**Key:** col_ref

**Type:** text

**Default:** Ref

#### Input column: value

**Key:** col_val

**Type:** text

**Default:** Val

#### Input column: package

**Key:** col_pkg

**Type:** text

**Default:** Package

#### Input column: X

**Key:** col_x

**Type:** text

**Default:** PosX

#### Input column: Y

**Key:** col_y

**Type:** text

**Default:** PosY

#### Input column: rotation

**Key:** col_rot

**Type:** text

**Default:** Rot

#### Input column: side

**Key:** col_side

**Type:** text

**Default:** Side

#### Side to export

**Key:** side

**Type:** select

**Options:**

- top
- bottom

**Default:** top

#### X offset (mm)

**Key:** x_off

**Type:** number

**Default:** 0.0

#### Y offset (mm)

**Key:** y_off

**Type:** number

**Default:** 0.0

#### Global rotation offset (degrees)

**Key:** rot_off

**Type:** number

**Default:** 0

**Blocks:**

#### convert_pnp.py

**Body:** import csv

IN_FILE = '{{in_file}}'
OUT_FILE = '{{out_file}}'
SIDE = '{{side}}'
X_OFF = {{x_off}}
Y_OFF = {{y_off}}
ROT_OFF = {{rot_off}}

rows = []
with open(IN_FILE, newline='') as f:
    reader = csv.DictReader(f)
    for r in reader:
        if r['{{col_side}}'].strip().lower() != SIDE:
            continue
        x = float(r['{{col_x}}']) + X_OFF
        y = float(r['{{col_y}}']) + Y_OFF
        rot = (float(r['{{col_rot}}']) + ROT_OFF) % 360
        rows.append([r['{{col_ref}}'], r['{{col_val}}'], r['{{col_pkg}}'], round(x, 4), round(y, 4), round(rot, 1), SIDE])

rows.sort(key=lambda row: row[0])

with open(OUT_FILE, 'w', newline='') as f:
    w = csv.writer(f)
    w.writerow(['RefDes', 'Value', 'Package', 'X_mm', 'Y_mm', 'Rotation_deg', 'Side'])
    w.writerows(rows)

print('Wrote %d placements to %s' % (len(rows), OUT_FILE))

#### Per package rotation corrections (optional)

**Body:** # Some machine libraries define zero degrees differently from the CAD library.
# Add package specific corrections before the rows.append call, for example:
PKG_ROT_FIX = {
    'SOT-23': 180,
    'SOIC-8': 90,
}
# rot = (rot + PKG_ROT_FIX.get(r['{{col_pkg}}'], 0)) % 360

**Notes:** Verify the output on a first article. Machine vendors define coordinate origin, rotation direction and bottom side mirroring differently, so check the first board on the machine before running a lot. The script assumes millimetre units and a header row.

## Content

**Intro:** CAD tools export centroid files in their own column layout and rotation convention, while the pick and place machine expects another. This generator produces a short Python script that filters one side, applies offsets and writes a clean CSV you can load in your programming software.

**Sections:**

#### How to use the generator

**Body:** Open your centroid file and note the exact column names. Enter them in the fields, choose top or bottom, and set any X, Y and rotation offsets. Copy the generated script into a file, install Python 3 and run it from the folder containing the CSV. The output is a sorted file with a standard header that most programming software can import with a column mapping.

#### Coordinates and rotation

**Body:** Centroid data has an origin, a unit and a rotation direction. The origin may be the board corner or the auxiliary axis. Rotation of zero degrees in the CAD library does not always match zero degrees in the machine library, which is why package based corrections are common. The bottom side is often mirrored, so confirm how your CAD tool writes it.

**Bullets:**

- Confirm the origin on the fabrication drawing
- Check units: mm or mils
- Confirm clockwise or counter clockwise rotation
- Check polarized parts first on a trial board

#### Worked example

**Body:** A KiCad position file lists parts with columns Ref, Val, Package, PosX, PosY, Rot and Side. Setting the side to top and a 0.0 offset produces a sorted file of top side placements. If the first board shows every SOT-23 rotated by 180 degrees, uncomment the package correction block and re-run.

#### Common mistakes

**Body:** Common mistakes include forgetting that the file uses a decimal comma in some regions, ignoring parts marked do not populate, and exporting both sides into the same machine program. Always compare the part count in the output with the BOM quantity for the chosen side.

**Cta:** Netray can help connect CAD, BOM and ERP data so placement files, BOM revisions and work orders stay consistent.

**Faq:**

#### Does this script handle bottom side mirroring?

**Answer:** Not automatically. It filters the side and applies offsets. Some machines expect mirrored X for the bottom side, so add that step if your vendor requires it, and verify on a first article.

#### Which Python version is needed?

**Answer:** Any current Python 3 version works. The script uses only the standard library csv module, so no extra packages are required.

#### Can I use it with Excel exported CSV files?

**Answer:** Yes, if the file is saved as CSV with a header row and a dot decimal separator. Check the column names exactly, including capitalisation and spaces.

#### How do I check the result?

**Answer:** Compare the number of lines with the BOM count for that side, load the file into the machine software and run a trial board. Check polarized parts and connectors first.

## Search terms

pick and place file converter, centroid file to machine format, kicad pos file to csv, pnp rotation offset script, smt programming csv python, convert xy data pcb assembly, centroid file generator, cpl file converter

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
