# PPE Matrix Worksheet and Hazard Assessment

> Source: https://netray.co/tools/ppe-hazard-assessment-matrix-worksheet
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

An editable PPE matrix listing tasks, hazards and the required protection for each, exportable to Excel for your written hazard assessment.

## Category

ehs-workforce

## Region

United States

## Audience

- Safety manager
- EHS coordinator
- Supervisor

## Tool

**Kind:** worksheet

**Mode:** editable

**Columns:**

#### Area

**Key:** area

**Type:** text

#### Task

**Key:** task

**Type:** text

#### Main hazards

**Key:** hazard

**Type:** text

#### Head

**Key:** head

**Type:** select

**Options:**

- Required
- As needed
- Not required

#### Eye / face

**Key:** eye

**Type:** select

**Options:**

- Safety glasses
- Goggles
- Face shield plus glasses
- Welding helmet
- Not required

#### Hearing

**Key:** hearing

**Type:** select

**Options:**

- Required
- As needed
- Not required

#### Hand

**Key:** hand

**Type:** select

**Options:**

- Cut-resistant
- Chemical-resistant
- Heat-resistant
- Impact
- General work
- Not required

#### Foot

**Key:** foot

**Type:** select

**Options:**

- Safety toe
- Metatarsal guard
- Electrical hazard rated
- Not required

#### Respiratory

**Key:** resp

**Type:** select

**Options:**

- Required
- As needed
- Not required

#### Specification / notes

**Key:** notes

**Type:** text

#### Next review

**Key:** review

**Type:** date

**Rows:**

**Area:** CNC machining

**Task:** Machine operation with coolant

**Hazard:** Flying chips, noise, coolant mist

**Head:** Not required

**Eye:** Safety glasses

**Hearing:** As needed

**Hand:** Not required

**Foot:** Safety toe

**Resp:** Not required

**Notes:** Side shields; hearing protection where dosimetry shows 85 dBA TWA or above

**Review:** 2027-04-01

**Area:** Maintenance

**Task:** Grinding and cutting

**Hazard:** Sparks, abrasive fragments, noise, dust

**Head:** Not required

**Eye:** Face shield plus glasses

**Hearing:** Required

**Hand:** Cut-resistant

**Foot:** Safety toe

**Resp:** As needed

**Notes:** Dust mask or respirator depending on material and exposure monitoring

**Review:** 2027-04-01

**Area:** Welding bay

**Task:** MIG welding

**Hazard:** Arc radiation, spatter, fume, heat

**Head:** Not required

**Eye:** Welding helmet

**Hearing:** As needed

**Hand:** Heat-resistant

**Foot:** Safety toe

**Resp:** As needed

**Notes:** Flame-resistant clothing; local exhaust at the arc

**Review:** 2027-04-01

**Area:** Plating line

**Task:** Chemical bath handling

**Hazard:** Splash of acid and caustic, vapors

**Head:** Not required

**Eye:** Goggles

**Hearing:** Not required

**Hand:** Chemical-resistant

**Foot:** Safety toe

**Resp:** As needed

**Notes:** Apron and face shield for transfers; follow SDS for glove material

**Review:** 2027-04-01

**Area:** Warehouse

**Task:** Forklift loading and racking

**Hazard:** Struck by load, falling objects, vehicle traffic

**Head:** As needed

**Eye:** Safety glasses

**Hearing:** Not required

**Hand:** General work

**Foot:** Safety toe

**Resp:** Not required

**Notes:** High-visibility vest in traffic aisles; hard hat in high-rack zones

**Review:** 2027-04-01

**Notes:** 29 CFR 1910.132(d) requires the employer to assess the workplace for hazards, select suitable PPE, and certify the assessment in writing with the date, the workplace evaluated and the person certifying. Specific standards cover eye and face (1910.133), respiratory (1910.134), head (1910.135), foot (1910.136) and hand protection (1910.138), and occupational noise (1910.95). This worksheet is a starting point, not legal advice. Prefer engineering and administrative controls first, and verify selections against the actual hazard data.

## Content

**Intro:** A PPE matrix shows, for each task or area, the protection a worker must wear. It is also the backbone of the written hazard assessment OSHA expects under 29 CFR 1910.132. Edit the sample rows, add your own tasks, and export the result to Excel to post or keep on file.

**Sections:**

#### How to use this worksheet

**Body:** List each area and task, then walk it to identify the hazards: impact, penetration, compression, chemical, heat, harmful dust, light radiation, noise and electrical. For each task choose the level of protection in the columns. Use the specification column to note ratings such as impact class, cut level, glove material or respirator type. Set a review date for each row. Export to Excel to build your certification record, add the evaluator's name and date, and give a copy to supervisors so enforcement is consistent.

#### The hazard assessment requirement

**Body:** Employers must assess the workplace to decide whether hazards are present that require PPE. If they are, the employer must select suitable PPE, have employees use it, and train them on when it is necessary, what to wear, how to put it on and care for it, and its limits. The written certification must name the workplace evaluated, the person certifying, the date, and state that it is a certification of hazard assessment. Reassess when new equipment, processes or injuries change the picture.

**Bullets:**

- PPE is the last line of defense in the hierarchy of controls
- Provide the right size and fit
- Train and document the training
- Retrain when tasks or PPE change

#### Worked example and reading the matrix

**Body:** In the sample, grinding calls for a face shield over glasses, hearing protection and cut-resistant gloves, while CNC operation needs only glasses and optional hearing protection. The notes column carries the specifics that make the matrix enforceable, such as the 85 dBA action level in the OSHA noise standard. A matrix with only yes and no entries is often too vague to defend. Pair it with exposure monitoring results and SDS requirements for the chemical rows.

#### Common mistakes

**Body:** Typical issues are a single plant-wide PPE rule that does not reflect task hazards, outdated matrices after process changes, and selecting PPE without checking compatibility, such as glove material against a specific chemical. Others are missing the written certification, ignoring contractors and visitors, and treating PPE as the first rather than the last control. Review at least annually and after any related incident.

**Cta:** If your job roles and training records are held in an ERP or HR system, we can help flag which workers are missing required PPE training for their tasks.

**Faq:**

#### Is a written PPE hazard assessment required?

**Answer:** In the US, yes. 29 CFR 1910.132(d) requires the employer to certify in writing that a workplace hazard assessment has been performed, identifying the workplace, the person certifying and the date.

#### How often should the PPE matrix be updated?

**Answer:** Whenever tasks, equipment, chemicals or processes change, after an incident that involves PPE, and at least annually as a routine check. Record the review date for each row.

#### Who pays for PPE?

**Answer:** Under 29 CFR 1910.132(h), the employer must pay for most required PPE, with exceptions such as ordinary safety-toe footwear and prescription safety eyewear if the employee may take them off site. Check the rule and your local law.

#### Does PPE replace other controls?

**Answer:** No. PPE is the last line of defense. Where practicable, eliminate the hazard, substitute, apply engineering controls such as guarding or ventilation, and use administrative controls before relying on PPE.