# PQR Template: Procedure Qualification Record

> Source: https://netray.co/tools/pqr-procedure-qualification-record-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A fill-in PQR with actual test weld variables, tensile, guided bend and Charpy results, and certification block.

## Category

quality

## Industry

Fabrication

## Audience

- Welding engineer
- Quality engineer
- Third party inspector

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Company

**Key:** company

**Type:** text

**Default:** Acme Fabrication Ltd

#### PQR number

**Key:** pqr_no

**Type:** text

**Default:** PQR-001

#### Date of test weld

**Key:** date

**Type:** date

**Default:** 2026-09-15

#### Code

**Key:** code

**Type:** select

**Options:**

- ASME IX
- AWS D1.1
- ISO 15614-1
- EN 1090
- API 1104
- Other

**Default:** ASME IX

#### Process

**Key:** process

**Type:** select

**Options:**

- SMAW
- GTAW
- GMAW
- FCAW
- SAW

**Default:** GTAW

#### Base metal and thickness

**Key:** base

**Type:** text

**Default:** ASTM A106 Gr B pipe, 12.7 mm wall, 168 mm OD

#### Filler metal

**Key:** filler

**Type:** text

**Default:** AWS A5.18 ER70S-2, 2.4 mm

#### Position tested

**Key:** position

**Type:** text

**Default:** 6G

#### Preheat and interpass actual

**Key:** preheat

**Type:** text

**Default:** Preheat 20 C, interpass max 200 C

#### PWHT

**Key:** pwht

**Type:** text

**Default:** None

#### Actual parameters

**Key:** actual

**Type:** textarea

**Default:** DCEN, 2.4 mm tungsten. Root 105 A, 11 V. Fill 135 A, 12 V. Gas argon 14 L/min. Heat input 0.9 to 1.3 kJ/mm.

#### Tensile test results

**Key:** tensile

**Type:** textarea

**Default:** Specimen T1: 480 MPa, broke in base metal. Specimen T2: 485 MPa, broke in base metal. Required minimum: 415 MPa.

#### Guided bend results

**Key:** bend

**Type:** textarea

**Default:** Two face and two root bends. No open discontinuity exceeding limit. Acceptable.

#### Impact (Charpy) results if required

**Key:** impact

**Type:** textarea

**Default:** Not required for this procedure.

#### Visual and radiographic results

**Key:** ndt

**Type:** textarea

**Default:** Visual acceptable. RT acceptable per applicable criteria.

#### Overall result

**Key:** result

**Type:** select

**Options:**

- Accepted
- Rejected
- Retest required

**Default:** Accepted

**Blocks:**

#### Procedure Qualification Record

**Body:** Company: {{company}}
PQR No.: {{pqr_no}}   Test date: {{date}}
Code: {{code}}
Process: {{process}}

#### Test weld variables (actual)

**Body:** Base metal: {{base}}
Filler metal: {{filler}}
Position: {{position}}
Preheat and interpass: {{preheat}}
PWHT: {{pwht}}

Parameters: {{actual}}

#### Mechanical test results

**Table:**

**Columns:**

- Test
- Specimens
- Result
- Required

**Rows:**

**0:** Tensile

**1:** 2

**2:** See notes below

**3:** Per code

**0:** Face bend

**1:** 2

**3:** No open discontinuity over limit

**0:** Root bend

**1:** 2

**3:** No open discontinuity over limit

**0:** Impact

**1:** As required

**3:** Per specification

#### Tensile

**Body:** {{tensile}}

#### Bend tests

**Body:** {{bend}}

#### Impact tests

**Body:** {{impact}}

#### Non-destructive examination

**Body:** {{ndt}}

#### Conclusion

**Body:** Overall result: {{result}}

#### Certification

**Signatures:**

- Welder who made test weld
- Welding engineer
- Test laboratory
- Witness or inspector

**Notes:** Starting point only. A PQR records what was actually done and tested. Do not edit it after the fact to widen ranges. Follow the acceptance criteria and specimen counts in the code you qualify to.

## Content

**Intro:** A procedure qualification record documents the test weld that proves a welding procedure. This template captures the actual variables and test results in a form you can file with the supporting WPS.

**Sections:**

#### How to use the template

**Body:** Record what was actually used on the test coupon, not what was planned: base metal, thickness, filler, position, preheat and measured parameters. Then enter the tensile, bend and any impact results from the lab report. Select the overall result and collect signatures. Save the PDF in the qualification file.

**Bullets:**

- Record actual, not target, parameters
- Attach the lab report and radiograph
- Keep the coupon identification
- Link the PQR to each WPS that relies on it

#### Tests that prove a procedure

**Body:** Groove weld PQRs typically require transverse tension tests and guided bend tests, and impact tests when the material or service demands them. Pass criteria depend on the code. For example, tensile strength must meet the minimum specified for the base metal, and bends must show no open discontinuities beyond a specified size.

#### From PQR to WPS

**Body:** A single qualified PQR supports a range of thickness, diameter and parameters defined by the code. Write each WPS inside those ranges. Changing an essential variable such as process, base metal group or filler classification beyond what the code allows needs a new PQR.

#### Common mistakes

**Body:** Auditors find PQRs that list planned values instead of measured ones, miss the heat input, lack lab traceability or have no signature. Another error is reusing a PQR after an essential variable change.

**Bullets:**

- Planned values entered as actual
- Missing lab report reference
- No coupon identification
- Unsigned certification block

**Cta:** Netray can help organize PQR, WPS and test certificates alongside material traceability in your ERP or document system.

**Faq:**

#### Do I need a PQR for every WPS?

**Answer:** No. One PQR supports every WPS whose variables fall inside the ranges the code allows from that test. You need a new PQR when you change an essential variable beyond those allowances.

#### Can I edit a PQR later?

**Answer:** A PQR is a record of a test already performed, so it should not be changed to widen ranges. Clerical corrections are possible with documented review. New conditions require a new test and a new PQR.

#### What mechanical tests are common?

**Answer:** Transverse tensile and guided bend tests are standard for groove welds. Charpy impact, hardness and macro examination are added when the material, temperature or specification demands them. The code defines specimen numbers and acceptance.

#### Who certifies a PQR?

**Answer:** The manufacturer or contractor certifies that the record is correct, usually via a signature from the welding engineer, often with a lab and a witness. Some projects require third party or authorized inspector witness of the test.