# Preventive Maintenance Schedule Template (Excel)

> Source: https://netray.co/tools/preventive-maintenance-schedule-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Editable PM schedule worksheet that turns task intervals and durations into annual runs, annual hours and technician load.

## Category

maintenance

## Industry

Manufacturing

## Audience

- Maintenance manager
- Maintenance planner
- Reliability engineer

## Tool

**Kind:** worksheet

**Mode:** editable

**Columns:**

#### Asset ID

**Key:** asset_id

**Type:** text

#### Asset

**Key:** asset

**Type:** text

#### PM task

**Key:** task

**Type:** text

#### Frequency

**Key:** frequency

**Type:** select

**Options:**

- Daily
- Weekly
- Monthly
- Quarterly
- Semi-annual
- Annual
- Meter based

#### Interval (days)

**Key:** interval_days

**Type:** number

**Unit:** days

**Help:** Calendar days between tasks. Convert meter-based tasks to an average.

#### Hours per task

**Key:** hours

**Type:** number

**Unit:** h

#### Craft

**Key:** craft

**Type:** select

**Options:**

- Mechanical
- Electrical
- Instrument
- Operator
- Lubrication
- Contractor

#### Last done

**Key:** last_done

**Type:** date

#### Runs per year

**Key:** runs

**Type:** number

**Expr:** 365 / interval_days

**Format:** decimal

#### Annual hours

**Key:** annual_hours

**Type:** number

**Expr:** hours * 365 / interval_days

**Format:** decimal

**Rows:**

**Asset id:** CMP-101

**Asset:** Screw compressor 75 kW

**Task:** Check oil level, drain condensate, inspect belts

**Frequency:** Weekly

**Interval days:** 7

**Hours:** 0.5

**Craft:** Mechanical

**Last done:** 2026-10-12

**Asset id:** CMP-101

**Asset:** Screw compressor 75 kW

**Task:** Replace oil filter and separator element

**Frequency:** Semi-annual

**Interval days:** 182

**Hours:** 3

**Craft:** Mechanical

**Last done:** 2026-06-04

**Asset id:** CNC-204

**Asset:** CNC machining centre

**Task:** Clean and lubricate way covers, check coolant concentration

**Frequency:** Weekly

**Interval days:** 7

**Hours:** 1

**Craft:** Operator

**Last done:** 2026-10-14

**Asset id:** CNC-204

**Asset:** CNC machining centre

**Task:** Spindle vibration reading and drawbar force check

**Frequency:** Quarterly

**Interval days:** 91

**Hours:** 2.5

**Craft:** Mechanical

**Last done:** 2026-08-19

**Asset id:** MCC-007

**Asset:** Motor control centre

**Task:** Thermographic scan and torque check of lugs

**Frequency:** Annual

**Interval days:** 365

**Hours:** 6

**Craft:** Electrical

**Last done:** 2026-03-11

**Asset id:** CVR-310

**Asset:** Packing line conveyor

**Task:** Gearbox oil sample and chain tension check

**Frequency:** Monthly

**Interval days:** 30

**Hours:** 1.5

**Craft:** Lubrication

**Last done:** 2026-09-28

**Totals:**

#### Total PM runs per year

**Key:** runs

**Agg:** sum

**Format:** decimal

#### Total annual PM hours

**Key:** annual_hours

**Agg:** sum

**Format:** decimal

**Summary:**

#### Average PM hours per week

**Key:** weekly_hours

**Expr:** sum_annual_hours / 52

**Format:** decimal

**Primary:** true

**Description:** Annual PM hours spread evenly over 52 weeks.

#### Technician FTE needed

**Key:** fte

**Expr:** sum_annual_hours / 1600

**Format:** decimal

**Description:** Assumes about 1,600 productive wrench hours per technician per year, after leave, meetings and travel.

**Notes:** Edit any cell, add or delete rows, then export to Excel. Interval days drives runs per year and annual hours. Keep one row per task per asset so work orders map one to one to your CMMS or ERP maintenance plan.

## Content

**Intro:** A PM schedule is only useful if it matches the labor you actually have. This worksheet lists each asset task with its interval and duration, then totals the annual hours so you can see the technician load before the year starts.

**Sections:**

#### How to use the schedule

**Body:** Enter one row per asset and task. Set the interval in days (weekly is 7, monthly about 30, quarterly about 91, annual 365) and the realistic hours for one person or crew to complete it. The sheet computes runs per year as 365 divided by the interval and annual hours as hours per task times runs per year. The summary converts the total into average hours per week and the number of full time technicians needed. Export the result to Excel to load into your CMMS, or print the PDF for the planning board.

**Bullets:**

- Use task level rows, not asset level, so hours are honest
- Record the last done date to sequence the first work orders
- Split operator tasks from craft tasks
- Review intervals against failure history yearly

#### Where the intervals come from

**Body:** Start with the OEM manual, then adjust for duty cycle and failure history. Time based intervals suit wear that follows calendar or run time. Condition based tasks such as vibration, oil analysis and thermography are listed here as inspections, and the repair they trigger belongs on a separate corrective work order. If a task never finds anything over several cycles, lengthen the interval. If the asset keeps failing between visits, shorten it or change the task. Standards such as ISO 55000 expect this kind of evidence based review, but the schedule itself does not need any certification.

#### Reading the load figures

**Body:** Average PM hours per week is a planning number, not a promise, because tasks cluster around shutdowns and month ends. If the FTE figure is more than about half of your crew, there is little room for corrective work, projects and training, so expect the PM program to slip. A common warning sign is a schedule that totals more hours than the crew can deliver while compliance is still reported as high, which usually means tasks are being closed without being done.

#### Common mistakes

**Body:** The usual errors are copying OEM intervals without checking duty cycle, listing a task with zero hours, forgetting contractor visits and statutory inspections, and building the schedule once and never revising it. In an ERP or CMMS, the same data becomes maintenance plans and task lists, for example SAP PM maintenance plans and task lists or IBM Maximo job plans and PM records. Keep the worksheet as the single reviewed source before loading it.

**Cta:** If your PM plans already live in SAP PM, Maximo or another ERP, Netray can build a read-only view that compares scheduled hours against crew capacity from live data.

**Faq:**

#### How do I convert a monthly task to an interval in days?

**Answer:** Use 30 for monthly, 91 for quarterly, 182 for semi-annual and 365 for annual. If you want exactness, use 365 divided by the number of runs per year. The small difference rarely changes the labor forecast.

#### How do I handle meter based tasks such as every 500 running hours?

**Answer:** Convert the meter interval to calendar days using the average running hours per day. For a machine that runs 16 hours a day, 500 hours is about 31 days. Update the figure if utilization changes.

#### Why 1,600 hours per technician?

**Answer:** A 2,080 hour paid year loses time to leave, holidays, training, meetings and travel. About 1,600 hours is a conservative productive figure. Replace it with your own number if you track wrench time.

#### Can I import this into my CMMS?

**Answer:** Yes. Export to Excel or CSV and map the columns to your CMMS PM or maintenance plan import. Most systems need asset ID, task text, interval, estimated hours and craft, which this sheet already holds.

## Search terms

preventive maintenance schedule template, preventive maintenance schedule excel, pm schedule template, equipment maintenance schedule template, annual maintenance plan template, pm task list template, maintenance planning spreadsheet, free pm checklist schedule

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json