## Short answer

A form to request, assess and approve changes inside the frozen window of a production schedule, with capacity impact and sign-off.

## Category

mes-shop-floor

## Industry

Discrete Manufacturing

## Audience

- Production scheduler
- Customer service
- Plant manager

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Company

**Key:** company

**Type:** text

**Default:** Acme Precision Ltd

#### Request number

**Key:** req_no

**Type:** text

**Default:** SCR-2026-0142

#### Date requested

**Key:** date

**Type:** date

**Default:** 2026-10-20

#### Requested by

**Key:** requester

**Type:** text

**Default:** Customer service

#### Work order or job

**Key:** job

**Type:** text

**Default:** WO-10423

#### Part number and description

**Key:** part

**Type:** text

**Default:** PN-48213 Bracket assembly

#### Type of change

**Key:** change_type

**Type:** select

**Options:**

- Expedite
- Delay
- Quantity increase
- Quantity decrease
- Resequence
- Cancel
- Move to another line

**Default:** Expedite

#### Current planned finish

**Key:** old_date

**Type:** date

**Default:** 2026-10-30

#### Requested finish

**Key:** new_date

**Type:** date

**Default:** 2026-10-26

#### Reason for change

**Key:** reason

**Type:** textarea

**Default:** Customer line-down risk. Customer moved their need date forward by four days.

#### Capacity and material impact

**Key:** capacity

**Type:** textarea

**Default:** Needs 14 hours on the CNC lathe and 6 hours on assembly. Material is on hand. Overtime of 8 hours on Saturday may be required.

#### Other jobs affected

**Key:** other_jobs

**Type:** textarea

**Default:** WO-10431 moves back by one day. No customer promise date is missed.

**Blocks:**

#### Production Schedule Change Request

**Body:** Company: {{company}}
Request number: {{req_no}}
Date requested: {{date}}
Requested by: {{requester}}

#### Job details

**Body:** Work order: {{job}}
Part: {{part}}
Change type: {{change_type}}
Current planned finish: {{old_date}}
Requested finish: {{new_date}}

#### Reason for the change

**Body:** {{reason}}

#### Impact assessment

**Body:** Capacity and material:
{{capacity}}

Other jobs affected:
{{other_jobs}}

#### Checks before approval

**Table:**

**Columns:**

- Check
- Yes / No
- Notes

**Rows:**

**0:** Is the job inside the frozen window?

**0:** Material and tooling available?

**0:** Constraint work center protected?

**0:** Overtime or outside processing needed?

**0:** Customer promise dates re-confirmed?

#### Approvals

**Signatures:**

- Requester
- Production scheduler
- Operations manager
- Customer service

**Notes:** Record the approved change in your ERP or scheduling system the same day so the shop floor, purchasing and customer service see one plan. Adapt the checks to your own frozen window policy.

## Content

**Intro:** Every plant has a schedule and every plant has people who need it changed. A change request form turns a hallway demand into a recorded decision with its cost and its consequences for other jobs. This template gives you a clean form to fill and export.

**Sections:**

#### How to use the form

**Body:** Fill in the job, the type of change and the current and requested dates. State the reason in business terms, such as a customer line-down risk or a material shortage. The scheduler completes the impact section: the hours needed at each work center, any overtime or outside processing, and which other jobs move and by how much. Then run the checks and collect the approvals. Export to PDF or Word and file it with the job record.

**Bullets:**

- One request per job and per change
- State the reason, not just the new date
- Quantify the capacity impact in hours
- Name every other job that moves

#### Why a form helps

**Body:** A frozen window or time fence exists to keep the schedule stable. Changes inside it break plans for purchasing, quality and the people on the floor. Without a record, the cost of each exception is invisible and the same people expedite every week. A short form creates a trail, shows who asks for what, and gives the plant manager data when deciding how long the frozen window should be.

#### What to review each month

**Body:** Count requests by type and by requester. A lot of expedites from one customer or sales team usually points to a quoting or promising problem. Many delays point to material or supplier trouble. Compare approved and rejected changes with on time delivery to see whether exceptions help or merely move lateness around. Share the summary at the production meeting.

#### Common mistakes

**Body:** Approving a change without writing down which job moves back is the biggest one, because the displaced job simply becomes the next emergency. Another is leaving the requested date as the only required field. And forms that live only on paper fall out of date quickly, so enter the approved change in the system the same day.

**Cta:** If change requests currently travel by email and phone, we can help build an approval flow that reads capacity and open orders from your ERP and records the decision against the work order.

**Faq:**

#### What is a frozen window?

**Answer:** A frozen window, or time fence, is a period near the present in which the schedule is not changed by the planning system or by people without approval. It keeps materials, tooling and labor stable for work that is about to start.

#### Who should approve changes?

**Answer:** Normally the production scheduler assesses the impact and an operations or plant manager approves. Customer service or sales signs for the commercial reason. Set the approval level by the cost and risk of the change.

#### Does this replace the ERP?

**Answer:** No. The form captures the reason, the impact and the approval. The actual reschedule is made in your ERP or scheduling tool. Keep the request number in the work order notes so the two records stay linked.

#### How long should I keep these forms?

**Answer:** Keep them with the job records for as long as your quality system or customer contracts require. Some aerospace and defense customers specify retention periods, so check your quality manual.