# Prop 65 Exposure vs MADL Calculator

> Source: https://netray.co/tools/prop-65-exposure-vs-madl-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Compare the estimated daily exposure from your product with a Prop 65 safe harbor level and see the highest concentration that stays below it.

## Category

compliance-legal

## Region

United States

## Audience

- Compliance engineer
- Product safety
- Regulatory affairs

## Tool

**Kind:** calculator

**Inputs:**

#### Chemical concentration in product

**Key:** conc

**Type:** number

**Default:** 2

**Min:** 0

**Step:** 0.1

**Unit:** ug/g

**Help:** Concentration of the listed chemical in the product or material, micrograms per gram.

#### Amount contacted or ingested per use

**Key:** amount

**Type:** number

**Default:** 5

**Min:** 0

**Step:** 0.5

**Unit:** g

**Help:** Mass of product a user ingests or that transfers to skin per use.

#### Uses per day

**Key:** uses

**Type:** number

**Default:** 1

**Min:** 0

**Step:** 1

**Unit:** per day

#### Fraction transferred to the person

**Key:** transfer

**Type:** slider

**Default:** 100

**Min:** 1

**Max:** 100

**Step:** 1

**Unit:** %

**Help:** Use 100 for ingestion of the whole mass; lower values for dermal transfer from a wipe study.

#### Safe harbor level (MADL or NSRL)

**Key:** level

**Type:** number

**Default:** 0.5

**Min:** 0.0001

**Step:** 0.1

**Unit:** ug/day

**Help:** Take the value for your chemical and route from the OEHHA safe harbor table. Lead reproductive MADL is 0.5 ug/day.

**Outputs:**

#### Estimated daily exposure

**Key:** exposure

**Expr:** conc * amount * uses * transfer / 100

**Format:** decimal

**Primary:** true

**Description:** Micrograms per day.

#### Exposure as share of safe harbor level

**Key:** pct

**Expr:** exposure / level * 100

**Format:** percent

#### Warning screen (1 = exposure above level)

**Key:** over

**Expr:** gt(exposure, level)

**Format:** integer

**Primary:** true

#### Maximum concentration for no warning

**Key:** max_conc

**Expr:** level / (amount * uses * transfer / 100)

**Format:** decimal

**Description:** Micrograms per gram that keeps exposure at the level.

#### Reduction needed

**Key:** reduction

**Expr:** max(0, 1 - level / exposure) * 100

**Format:** percent

**Chart:**

#### Daily exposure vs concentration

**Type:** line

**X:** conc

**From:** 0

**To:** 10

**Steps:** 30

**Series:**

- exposure

**Disclaimer:** Prop 65 exposure assessment follows OEHHA regulations (Title 27 CCR section 25821 and related). Use the reasonably anticipated rate of exposure for the product and a qualified toxicologist for defensible claims. This tool is a screening aid, not legal advice.

## Content

**Intro:** California Proposition 65 requires a clear and reasonable warning when a product exposes people to a listed chemical above the safe harbor level. This calculator does the exposure arithmetic so you can decide whether a warning, a reformulation or a better test is the next step.

**Sections:**

#### How to use it

**Body:** Start with the analytical result for the chemical in the product. Enter the amount of product a person ingests or contacts per use and the number of uses per day. If the route is dermal, use a transfer fraction from a wipe or migration study; for ingestion leave it at 100%. Enter the safe harbor level for the chemical and the endpoint: a MADL for reproductive toxicity or an NSRL for cancer risk. The tool returns exposure, the share of the level and the highest concentration that avoids a warning.

**Bullets:**

- Use the OEHHA table for the current level
- Pick the endpoint that gives the lower level if the chemical has both
- Use the realistic upper-bound use pattern

#### The method

**Body:** Daily exposure equals concentration times mass per use times uses per day times the fraction that reaches the person. If that exposure is at or below the safe harbor level, a warning is not required for that chemical and route. The inverse gives the specification limit you can write into a purchase order: maximum concentration equals the level divided by the daily mass transferred. Safe harbor levels are not the only defence, but they are the most direct one.

**Bullets:**

- Exposure = conc x mass x uses x transfer
- Max conc = level / daily mass transferred
- Reduction = 1 - level / exposure

#### Worked example

**Body:** A product has 2 ug/g of lead and a user ingests 5 g once a day, so exposure is 10 ug/day against a lead reproductive MADL of 0.5 ug/day. That is 2,000% of the level and a warning would be needed. The maximum concentration would be 0.1 ug/g, a 95% reduction. The chart shows how steeply exposure rises with concentration, which helps when you negotiate a specification with a supplier.

#### Common mistakes

**Body:** Teams often use the level for the wrong route or endpoint, or copy a value from an old list. Another mistake is using average rather than reasonably anticipated use, or ignoring that a sold-in-California product can reach the state through a distributor. Keep the evidence, the date of the level you used and the use assumptions together in the technical file so you can defend the decision if a notice of violation arrives.

**Cta:** Netray can help you attach test results and chemical specifications to the item records in your ERP so Prop 65 decisions are traceable by part number.

**Faq:**

#### What is a MADL?

**Answer:** A maximum allowable dose level is the safe harbor level for chemicals that cause reproductive toxicity, given in micrograms per day. Exposure at or below the MADL does not require a Prop 65 warning for that chemical.

#### What is an NSRL?

**Answer:** A no significant risk level is the daily intake that is calculated to result in no more than one excess case of cancer in 100,000 individuals exposed over a 70 year lifetime. It is the cancer-endpoint equivalent of a MADL.

#### Does a warning protect me from all claims?

**Answer:** A compliant warning reduces the risk of a notice of violation for that exposure, but it must meet the content and delivery rules of the regulation. It is not a substitute for reducing exposure where that is possible.

#### Where do I get the safe harbor value?

**Answer:** OEHHA, California's Office of Environmental Health Hazard Assessment, publishes the MADL and NSRL tables on its Proposition 65 website. Use the current version and record the date you consulted it.

## Search terms

prop 65 calculator, prop 65 exposure calculation, madl calculator, prop 65 safe harbor level, nsrl calculator, proposition 65 lead exposure, prop 65 warning needed, oehha exposure assessment

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
