# QAD EE Private AI Layer Blueprint Generator

> Source: https://netray.co/tools/qad-ee-private-ai-layer-blueprint-generator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Fill in your version, database, hosting and use cases to get an architecture plan for a private, on-prem AI assistant on QAD EE, ready to share with IT and security.

## Category

on-prem-ai

## Erp

QAD Enterprise Edition

## Audience

- CIO
- IT manager
- ERP administrator
- Plant manager

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Company name

**Key:** company

**Type:** text

**Default:** Acme Precision Ltd

#### QAD EE version

**Key:** version

**Type:** select

**Options:**

- QAD EE 2008
- QAD EE 2009 to 2012
- QAD EE 2013 to 2016
- QAD EE 2017 to 2021

**Default:** QAD EE 2017 to 2021

#### Database engine

**Key:** db

**Type:** select

**Options:**

- Progress OpenEdge 10.2B
- Progress OpenEdge 11.x
- Progress OpenEdge 12.x

**Default:** Progress OpenEdge 10.2B

#### Hosting model

**Key:** hosting

**Type:** select

**Options:**

- On-prem server
- Private cloud
- Air-gapped

**Default:** On-prem server

#### Named users

**Key:** users

**Type:** number

**Default:** 220

#### Sites or plants

**Key:** sites

**Type:** number

**Default:** 2

#### Main use cases

**Key:** usecases

**Type:** textarea

**Default:** Inventory by lot and location, open sales and purchase order status, work order shortages, supplier quality documents.

#### Data that must never leave the site

**Key:** never

**Type:** textarea

**Default:** Customer drawings, pricing and cost data, ITAR-controlled technical data, employee records.

#### GPU available

**Key:** gpu

**Type:** select

**Options:**

- None yet
- One 24 GB GPU
- One 48 GB GPU
- Two or more 48 GB GPUs
- 80 GB class GPUs

**Default:** None yet

#### Target go-live

**Key:** golive

**Type:** text

**Default:** Q1 2027 for read-only phase

**Blocks:**

#### Private AI Layer Blueprint: QAD EE

**Body:** Prepared for: {{company}}

Scope: a private AI assistant for {{version}} running on {{db}}, hosted as: {{hosting}}. Named users: {{users}}. Sites or plants: {{sites}}. Target go-live: {{golive}}.

Principle: the assistant reads from a copy of the system, runs open-weight models on infrastructure the company controls, and changes data only through supported interfaces after a named person approves.

#### 1. Context and use cases

**Body:** Use cases in scope:
{{usecases}}

Data that must never leave the site:
{{never}}

Available GPU: {{gpu}}.

#### 2. Components

**Table:**

**Columns:**

- Component
- Design for QAD EE
- Notes

**Rows:**

**0:** Data access path

**1:** OpenEdge SQL-92 (JDBC or ODBC) on a replica; QXtend for approved writes

**2:** Read-only account; no direct writes to application tables

**0:** Retrieval index

**1:** Local vector store over documents and long-text fields, tagged with domain, site and document class

**2:** Embedding model runs locally

**0:** Model serving

**1:** Open-weight model on vLLM or Ollama, GPU: {{gpu}}

**2:** Sized for {{users}} named users; see sizing calculator

**0:** Tool server

**1:** Approved parameterised read actions exposed through MCP or similar

**2:** Every call logged; limits on rows returned

**0:** Identity and permissions

**1:** QAD user ID mapped to domains and sites via your identity provider

**2:** Scope applied to queries and retrieval filters

**0:** Audit

**1:** Append-only log of user, prompt, tool calls, rows returned and answer

**2:** Retained on site per company policy

#### 3. Security controls for {{company}}

**Body:** Hosting: {{hosting}}. All inference, embeddings and indexes stay inside this boundary.

Data that must not leave: {{never}} This data is excluded from any external service, and outbound network access from the AI components is blocked or limited to an allow list.

Access: users sign in through the company identity provider; the assistant enforces the same data scope as the system for each user. Database credentials are held in a vault and the account is read-only.

Write-back: disabled in phases 1 and 2; in phase 3 only for named actions, through supported interfaces, with human approval showing the exact change.

#### 4. Rollout phases

**Table:**

**Columns:**

- Phase
- Scope
- Exit criteria

**Rows:**

**0:** 1: Read-only questions

**1:** Status and lookup questions over the use cases above, with the query shown to the user

**2:** Accuracy measured on a test set agreed with power users; scope tests pass

**0:** 2: Documents and drafts

**1:** Document Q and A and drafted messages or transactions that a user enters manually

**2:** Citations verified; no cross-scope leakage in tests

**0:** 3: Approved actions

**1:** A short list of write actions through supported interfaces with approval

**2:** Each action signed off by the business owner and IT

#### 5. Open questions for IT

**Body:** 1. Which database edition, version and replication options are licensed for {{db}}?
2. Who owns the read-only copy and its refresh schedule?
3. Which identity provider and groups map to roles for {{users}} users across {{sites}} site(s)?
4. Where will the GPU host sit, and how are model files approved and updated?
5. What is the retention period for audit logs?
6. Which customer or regulatory commitments restrict where data may be processed?

**Signatures:**

- Prepared by
- IT / Security review
- Business owner

**Notes:** This is a planning document, not a security certification or legal advice. Table and API details differ by release, so verify each data access detail against your own system before building.

## Content

**Intro:** This generator produces a structured architecture plan for adding a private AI assistant to QAD EE without moving data to a public cloud. It captures your version, database, hosting model, users and sensitive data, and returns a document you can send to IT and security. Export it as PDF or Word.

**Sections:**

#### How to use the generator

**Body:** Fill in the company, version, database, hosting model, user and site counts, and the use cases you want first. List the data that must never leave the site as specifically as you can, because the security section is built from it. Then export the document and use it as the agenda for a review with IT, security and the business owner.

**Bullets:**

- Start with two or three use cases, not ten
- Be specific about restricted data classes
- Pick the hosting model your policy allows
- Share the open questions with IT before the meeting

#### What the blueprint contains

**Body:** The plan sets out the context, a component table (data access path, retrieval index, model serving, tool server, identity and audit), the security controls mapped to your inputs, a three-phase rollout and a list of open questions. The component choices follow a common pattern: read from a copy, retrieve documents locally, serve an open-weight model on your GPUs, and log everything.

**Bullets:**

- Data access path: OpenEdge SQL-92 (JDBC or ODBC) on a replica; QXtend for approved writes
- Identity: QAD user ID mapped to domains and sites via your identity provider
- Phases: read-only, drafts, approved actions

#### Reading the output critically

**Body:** Treat the blueprint as a starting hypothesis. Table names, interfaces and replication options vary by release, so have your administrator confirm each data access item. Check licensing for any database replication feature you plan to rely on, and decide who will own the model host, the index and the audit log after go-live.

#### Common mistakes

**Body:** Teams often start by pointing the model at the production database, letting write-back arrive in the first release, or skipping role tests. Another frequent error is ignoring documents: much of the value is in drawings, certificates and procedures that never sat in the database.

**Bullets:**

- Production database used for AI queries
- No role or scope tests before go-live
- Write-back enabled too early
- No owner for the audit log

**Cta:** Netray builds read-only AI over QAD EE on your own hardware, including the semantic layer, tool server and audit log. If you want the blueprint reviewed against your actual domains and custom tables, ask for an expert review.

**Faq:**

#### Is this blueprint specific to QAD EE?

**Answer:** The data access path, identity mapping and component notes are tailored to QAD EE, but you should still verify table names, interfaces and licensing against your own release before building.

#### Does the plan require a public cloud?

**Answer:** No. The design keeps inference, embeddings, indexes and logs inside your boundary. You can choose on-prem server, private cloud or air-gapped hosting in the form.

#### Can I give the output to my security team?

**Answer:** Yes. It is formatted for sharing and lists controls and open questions. It is a planning document, not a certification, so your security team will still apply its own review.

#### Do I need a GPU before I start?

**Answer:** No. The form accepts none yet. The sizing calculator estimates GPU count from your usage, and a pilot can start on a single 24 GB or 48 GB GPU.

## Search terms

QAD EE AI architecture, QAD EE on-prem AI plan, private AI architecture template, on-prem LLM architecture document, AI integration plan QAD EE, air-gapped AI blueprint, ERP AI security plan, AI rollout plan template

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
