# Raw Material Lot Release and Retest Tracker Worksheet

> Source: https://netray.co/tools/raw-material-lot-release-and-retest-tracker-worksheet
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

An editable tracker for incoming raw material lots, quality status, retest dates, quantity on hand and inventory value.

## Category

supply-chain

## Industry

Chemicals & Process Manufacturing

## Audience

- Warehouse supervisor
- QC chemist
- Materials planner

## Tool

**Kind:** worksheet

**Mode:** editable

**Currency:** $

**Columns:**

#### Lot number

**Key:** lot

**Type:** text

#### Material

**Key:** material

**Type:** text

#### Supplier

**Key:** supplier

**Type:** text

#### Received date

**Key:** received

**Type:** date

#### Retest / expiry date

**Key:** retest

**Type:** date

#### Status

**Key:** status

**Type:** select

**Options:**

- Quarantine
- Released
- Rejected
- Retest pending
- Expired

#### Qty on hand

**Key:** qty

**Type:** number

**Unit:** kg

#### Cost per kg

**Key:** cost

**Type:** number

**Format:** currency

#### Stock value

**Key:** value

**Type:** number

**Expr:** qty * cost

**Format:** currency

#### Location

**Key:** location

**Type:** text

**Rows:**

**Lot:** RM-24-8841

**Material:** Isopropanol

**Supplier:** North Basin Solvents

**Received:** 2026-09-02

**Retest:** 2027-09-01

**Status:** Released

**Qty:** 3200

**Cost:** 1.15

**Location:** Tank farm TK-02

**Lot:** RM-24-8902

**Material:** Sodium lauryl ether sulfate

**Supplier:** Delta Surfactants

**Received:** 2026-09-18

**Retest:** 2027-03-17

**Status:** Released

**Qty:** 1850

**Cost:** 1.62

**Location:** Warehouse A-14

**Lot:** RM-24-9015

**Material:** Citric acid anhydrous

**Supplier:** Prairie Ingredients

**Received:** 2026-10-14

**Retest:** 2028-10-13

**Status:** Quarantine

**Qty:** 1000

**Cost:** 1.05

**Location:** QC hold area

**Lot:** RM-23-7120

**Material:** Corrosion inhibitor MBT

**Supplier:** Lakeside Additives

**Received:** 2025-10-09

**Retest:** 2026-10-08

**Status:** Retest pending

**Qty:** 240

**Cost:** 8.4

**Location:** Warehouse B-03

**Lot:** RM-24-8760

**Material:** Xylene

**Supplier:** North Basin Solvents

**Received:** 2026-08-21

**Retest:** 2027-08-20

**Status:** Rejected

**Qty:** 800

**Cost:** 1.3

**Location:** Return area

**Totals:**

#### Lots tracked

**Key:** lot

**Agg:** count

**Format:** integer

#### Total quantity (kg)

**Key:** qty

**Agg:** sum

**Format:** number

#### Total stock value

**Key:** value

**Agg:** sum

**Format:** currency

#### Largest lot value

**Key:** value

**Agg:** max

**Format:** currency

**Summary:**

#### Average value per lot

**Key:** avg_cost

**Expr:** sum_value / count

**Format:** currency

**Primary:** true

#### Largest lot value

**Key:** big_lot

**Expr:** max_value

**Format:** currency

**Notes:** Illustrative data. Retest periods come from supplier specifications and your own stability data. Keep quarantined and rejected lots physically segregated and mirrored in your ERP lot status.

## Content

**Intro:** Material that is not yet released, past its retest date or rejected must never reach a batch. This tracker keeps lot status, retest dates and stock value visible in one place, ready to export.

**Sections:**

#### How to use the tracker

**Body:** Add each incoming lot as soon as it is received and set its status to quarantine. Update to released after the certificate of analysis has been reviewed and any incoming tests pass. Enter the retest or expiry date from the supplier label or your own policy. The sheet calculates stock value from quantity and unit cost. Export to Excel and sort by retest date to plan retesting before material becomes unusable.

#### Retest versus expiry

**Body:** An expiry date means the material should not be used after that date. A retest date means the material may still be usable if it passes testing, after which a new retest date is assigned. Many chemical raw materials have retest dates, not hard expiry. Use the status field to separate the two situations and record the test used for the retest.

**Bullets:**

- Quarantine: received, not yet approved
- Released: approved for use in production
- Retest pending: date reached, awaiting result
- Rejected: failed, awaiting return or disposal
- Expired: past date and not retested

#### Reading the totals

**Body:** The stock value total helps finance understand what is tied up in quarantine, retest pending or rejected status. A growing value in rejected or expired material points to supplier quality problems or over-ordering. Compare the quantity on hand with your ERP on-hand balance during cycle counts to find lots that moved without being recorded.

#### Common mistakes

**Body:** Typical failures are using material while its status is still quarantine, missing a retest date because the label was not scanned, mixing lots in a tank without recording both, and not blocking rejected stock in the ERP. Enforce status through the ERP's lot status or inspection lot functions rather than relying on this sheet alone.

**Cta:** Netray can help build alerts from ERP lot data that warn planners before retest dates are reached.

**Faq:**

#### What is the difference between quarantine and rejected?

**Answer:** Quarantine is a temporary hold pending review or testing. Rejected means the material failed and must be returned, reworked under a deviation or disposed of. Keep them in separate locations.

#### How do I set a retest date?

**Answer:** Use the supplier's stated retest period, or your own stability data and policy. Count from the manufacture date unless the supplier specifies otherwise, and record the basis.

#### Can I use expired material?

**Answer:** Generally not without a documented assessment, retest and approval. Many quality systems require a deviation. Never use material past expiry simply because stock is short.

#### Should this replace ERP lot control?

**Answer:** No. Use it as a quick register or a staging sheet. The authoritative status should live in your ERP or warehouse system so transactions are blocked automatically.

## Search terms

raw material lot tracking excel, retest date tracker, raw material release log, chemical lot status register, incoming material quarantine log, expiry tracking sheet chemicals, raw material inventory register, lot release tracker

---