## Short answer

Typical drying temperature, time and maximum moisture for common injection molding resins, in a table you can search and export.

## Category

industry-templates

## Industry

Plastics and Injection Molding

## Audience

- Process engineer
- Molder
- Material handler
- Quality engineer

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Resin

**Key:** resin

**Type:** text

#### Abbreviation

**Key:** abbr

**Type:** text

#### Typical drying temperature (deg C)

**Key:** temp

**Type:** text

#### Typical drying time (hours)

**Key:** time

**Type:** text

#### Typical max moisture before molding

**Key:** moisture

**Type:** text

#### Note

**Key:** note

**Type:** text

**Rows:**

**Resin:** Acrylonitrile butadiene styrene

**Abbr:** ABS

**Temp:** 80 to 85

**Time:** 2 to 4

**Moisture:** about 0.1 percent

**Note:** Moisture causes splay and silver streaks

**Resin:** Styrene acrylonitrile

**Abbr:** SAN

**Temp:** 80

**Time:** 2 to 3

**Moisture:** about 0.1 percent

**Note:** Slightly hygroscopic

**Resin:** Polycarbonate

**Abbr:** PC

**Temp:** 120

**Time:** 3 to 4

**Moisture:** about 0.02 percent

**Note:** Wet PC hydrolyzes and loses impact strength

**Resin:** PC/ABS blend

**Abbr:** PC/ABS

**Temp:** 90 to 100

**Time:** 3 to 4

**Moisture:** about 0.04 percent

**Note:** Follow the supplier grade sheet

**Resin:** Polymethyl methacrylate (acrylic)

**Abbr:** PMMA

**Temp:** 80

**Time:** 3 to 4

**Moisture:** about 0.04 percent

**Note:** Bubbles and haze when wet

**Resin:** Polyamide 6

**Abbr:** PA6

**Temp:** 80

**Time:** 4 to 6

**Moisture:** about 0.2 percent

**Note:** Dry in a desiccant dryer; absorbs moisture from air

**Resin:** Polyamide 66

**Abbr:** PA66

**Temp:** 80

**Time:** 4 to 6

**Moisture:** about 0.2 percent

**Note:** Glass-filled grades dry the same way

**Resin:** Polyamide 12

**Abbr:** PA12

**Temp:** 80

**Time:** 3 to 4

**Moisture:** about 0.1 percent

**Note:** Lower moisture uptake than PA6 and PA66

**Resin:** Polybutylene terephthalate

**Abbr:** PBT

**Temp:** 120

**Time:** 3 to 4

**Moisture:** about 0.02 percent

**Note:** Hydrolysis sensitive

**Resin:** Polyethylene terephthalate

**Abbr:** PET

**Temp:** 150 to 160

**Time:** 4 to 6

**Moisture:** about 0.005 percent

**Note:** Needs low dew point and tight moisture control

**Resin:** Glycol modified PET

**Abbr:** PETG

**Temp:** 65

**Time:** 4

**Moisture:** about 0.04 percent

**Note:** Dries at lower temperature to avoid pellet sticking

**Resin:** Modified polyphenylene ether

**Abbr:** mPPE

**Temp:** 100

**Time:** 2 to 3

**Moisture:** about 0.05 percent

**Note:** Check grade data

**Resin:** Polysulfone

**Abbr:** PSU

**Temp:** 135

**Time:** 3 to 4

**Moisture:** about 0.05 percent

**Note:** High temperature dryer required

**Resin:** Polyetherimide

**Abbr:** PEI

**Temp:** 150

**Time:** 4

**Moisture:** about 0.02 percent

**Note:** High temperature dryer required

**Resin:** Polyphenylene sulfide

**Abbr:** PPS

**Temp:** 130 to 150

**Time:** 3

**Moisture:** about 0.02 percent

**Note:** Pre-drying recommended on filled grades

**Resin:** Polyether ether ketone

**Abbr:** PEEK

**Temp:** 150

**Time:** 3

**Moisture:** about 0.02 percent

**Note:** Use dryer rated for the temperature

**Resin:** Liquid crystal polymer

**Abbr:** LCP

**Temp:** 150

**Time:** 4

**Moisture:** about 0.01 percent

**Note:** Follow supplier data closely

**Resin:** Thermoplastic polyurethane

**Abbr:** TPU

**Temp:** 80 to 90

**Time:** 2 to 3

**Moisture:** about 0.02 percent

**Note:** Very moisture sensitive; use desiccant dryer

**Resin:** Polylactic acid

**Abbr:** PLA

**Temp:** 60

**Time:** 4

**Moisture:** about 0.025 percent

**Note:** Dry well below glass transition to avoid sticking

**Resin:** Cellulose acetate butyrate

**Abbr:** CAB

**Temp:** 70 to 80

**Time:** 2 to 3

**Moisture:** about 0.1 percent

**Note:** Hygroscopic cellulosics

**Resin:** Polyoxymethylene (acetal)

**Abbr:** POM

**Temp:** 80 to 100

**Time:** 2

**Moisture:** about 0.1 percent

**Note:** Often run undried; dry if stored in humid areas

**Resin:** Polypropylene

**Abbr:** PP

**Temp:** Not normally required

**Time:** n/a

**Moisture:** negligible

**Note:** Dry only if surface moisture from condensation

**Resin:** High density polyethylene

**Abbr:** HDPE

**Temp:** Not normally required

**Time:** n/a

**Moisture:** negligible

**Note:** Keep material out of cold-to-warm condensation

**Resin:** Polystyrene (general purpose)

**Abbr:** GPPS

**Temp:** Not normally required

**Time:** n/a

**Moisture:** negligible

**Note:** Dry only if wet from condensation

**Notes:** These are typical industry ranges for planning. Always follow the resin supplier's data sheet for the exact grade, especially for filled, flame-retardant or colored compounds. Use a desiccant dryer with a dew point near minus 40 deg C for hygroscopic resins and count drying time from the moment the material reaches the set temperature.

## Content

**Intro:** Wet resin is a leading cause of splay, voids, brittle parts and unstable viscosity in molding. This table gives typical drying temperatures, times and moisture limits for the resins molders run most, so a setter can check the dryer settings quickly.

**Sections:**

#### How to use the table

**Body:** Search by resin name or abbreviation, then compare the dryer settings with the ones on the hopper dryer. Values are typical figures, and a filled, colored or flame-retardant grade can differ, so confirm with the grade data sheet before changing a validated process. You can export the table to Excel for a laminated cheat sheet at the press, or to add to your standard work instructions.

#### Why some resins need drying

**Body:** Hygroscopic resins such as nylons, polycarbonate, PET, PBT, TPU and many blends take up water from the air. At melt temperature that water reacts with the polymer, a process called hydrolysis in polyesters, polycarbonate and polyamides, and cuts molecular weight, so the part loses strength even if it looks fine. Surface moisture also vaporizes and causes splay and bubbles. Non-polar polyolefins and polystyrene absorb almost nothing, so they are usually only dried if condensation forms on cold pellets.

#### Dryer setup and checks

**Body:** Time is counted once the resin has reached drying temperature, so a cold hopper load needs extra time. Match hopper capacity to throughput so material is not under- or over-dried; most dryer sizing guides use roughly a pound of material per hour times the drying hours for the hopper size. Check the dew point of the return air, filter and desiccant condition, hoses and sealing. A moisture analyzer on the dried pellets gives a direct check of the moisture content before molding.

**Bullets:**

- Check dew point near minus 40 deg C for hygroscopic resins.
- Do not open the hopper lid for long periods.
- Insulate hoses and keep them short.
- Do not mix different resins in one dryer.

#### Common mistakes

**Body:** Over-drying certain materials can cause oxidation or yellowing, and drying PET or PETG above the right temperature makes pellets stick together. Using the same program for every grade, drying regrind with the wrong settings, and leaving dried material exposed on the floor all bring moisture back. Remember that glass-filled grades are dried like the base resin, and that colorant or additive masterbatch with a hygroscopic carrier needs drying too.

**Cta:** If you want moisture and drying parameters to appear on production orders from your ERP or MES, we can help configure that.

**Faq:**

#### How long should nylon be dried before injection molding?

**Answer:** Typically around 80 deg C for 4 to 6 hours in a desiccant dryer, to bring moisture below about 0.2 percent. Check the grade sheet because glass-filled and specialty grades vary.

#### Do I need to dry polycarbonate?

**Answer:** Yes. Polycarbonate is moisture sensitive and typically needs about 3 to 4 hours at around 120 deg C, with a target moisture below roughly 0.02 percent, to avoid hydrolysis and splay.

#### Can I skip drying for polypropylene?

**Answer:** Usually yes, because PP absorbs very little moisture. Dry or warm it only if pellets show condensation after being brought from a cold area into a warm one.

#### What dew point should the dryer have?

**Answer:** A desiccant dryer used for hygroscopic engineering resins is normally run with return-air dew point near minus 40 deg C or lower. PET often requires lower.