# Sage 100 On-Prem vs Cloud Subscription Break-Even Calculator

> Source: https://netray.co/tools/sage-100-on-prem-vs-cloud-subscription-break-even-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Compares annual on-premise Sage 100 cost (server, maintenance, IT time, security) with a cloud subscription and computes payback on the migration spend.

## Category

erp-migration

## Erp

Sage 100

## Industry

SMB Manufacturing

## Audience

- Controller
- IT manager
- Owner

## Tool

**Kind:** calculator

**Currency:** $

**Inputs:**

#### Server and licenses refresh cost

**Key:** server

**Type:** number

**Default:** 35000

**Min:** 0

**Step:** 1000

**Unit:** one time

**Help:** Hardware, Windows Server and database licences, backup appliance.

#### Refresh cycle

**Key:** refresh

**Type:** slider

**Default:** 5

**Min:** 3

**Max:** 8

**Step:** 1

**Unit:** years

#### Annual software maintenance plan

**Key:** maint

**Type:** number

**Default:** 9000

**Min:** 0

**Step:** 500

**Unit:** per year

#### IT hours per month on ERP infrastructure

**Key:** it_hours

**Type:** slider

**Default:** 20

**Min:** 0

**Max:** 80

**Step:** 1

**Unit:** hours

**Help:** Patching, backups, restores, remote access, user support.

#### Loaded IT hourly cost

**Key:** rate

**Type:** number

**Default:** 60

**Min:** 0

**Step:** 5

**Unit:** per hour

#### Backup, DR and security tooling

**Key:** security

**Type:** number

**Default:** 4000

**Min:** 0

**Step:** 500

**Unit:** per year

#### Cloud subscription

**Key:** cloud

**Type:** number

**Default:** 30000

**Min:** 0

**Step:** 1000

**Unit:** per year

**Help:** Quote for the hosted or SaaS option including hosting and maintenance.

#### One-time migration cost

**Key:** migration

**Type:** number

**Default:** 25000

**Min:** 0

**Step:** 1000

**Unit:** one time

**Outputs:**

#### Server cost per year

**Key:** capex_year

**Expr:** server / refresh

**Format:** currency

#### IT labour per year

**Key:** it_year

**Expr:** it_hours * rate * 12

**Format:** currency

#### On-prem annual cost

**Key:** onprem_annual

**Expr:** capex_year + maint + it_year + security

**Format:** currency

**Primary:** true

#### Cloud annual cost

**Key:** cloud_annual

**Expr:** cloud

**Format:** currency

#### Annual saving (negative means cloud costs more)

**Key:** savings

**Expr:** onprem_annual - cloud_annual

**Format:** currency

**Primary:** true

#### Payback on migration

**Key:** payback

**Expr:** if(gt(savings, 0), migration / savings * 12, 0)

**Format:** months

**Description:** Shows 0 when the cloud option does not save money, so no payback exists.

**Chart:**

#### Annual cost by IT hours spent per month

**Type:** line

**X:** it_hours

**From:** 0

**To:** 80

**Steps:** 20

**Series:**

- onprem_annual
- cloud_annual

**Disclaimer:** Excludes intangible factors such as downtime risk, remote-access convenience and compliance obligations. Use your own quotes.

## Content

**Intro:** Many Sage 100 shops are weighing a move off an ageing server. The honest answer depends on how much IT time the server really consumes. This calculator puts both options on an annual basis and tells you how many months of savings repay the migration project, or that there are none.

**Sections:**

#### How to use it

**Body:** Spread the server and licence refresh over its life, add the maintenance plan, security tooling and the monthly IT hours at a loaded rate. Compare that with the all-in cloud quote. If the saving is positive, the payback output divides the one-time migration cost by the annual saving and converts it to months. The chart shows how the on-prem figure climbs with IT hours while the cloud line stays flat.

#### Reading the result

**Body:** A payback under 24 months is usually an easy decision; beyond 48 months you are buying other benefits rather than saving money. Check the IT hours input first, because it is the number people underestimate. Capture real hours from tickets for a quarter. Remember cloud subscription quotes often exclude add-ons, extra companies, or integration tools you run today.

**Bullets:**

- Include restore tests and patch windows in IT hours.
- Ask whether the cloud quote covers all companies and users.
- Add third-party products that need rewriting for the cloud.

#### Common mistakes

**Body:** Do not count the full server cost as annual when the machine also hosts other workloads, and do not ignore customisations, such as Crystal reports or Visual Integrator jobs, that need rework in a hosted environment. Also test the break-even at a conservative IT-hours value, since a lower figure makes the cloud look worse than it may be in a downtime event.

**Cta:** If a migration assessment would help, Netray can review your customisations and integrations and tell you what moves cleanly.

**Faq:**

#### Is Sage 100 cloud the same as hosting?

**Answer:** Not necessarily. Some options are a hosted copy of the same software on a provider's server, others are different products. Confirm exactly what the quote delivers and what remains your responsibility.

#### What IT hours should I use?

**Answer:** Count actual tickets and maintenance windows for a quarter, including backups, patches, user access and restores, then average per month. Estimates from memory are usually low.

#### Does a zero payback mean cloud is bad?

**Answer:** It means the cloud option does not save money on these inputs. It may still be right for resilience, remote access or risk, but you would be paying for those benefits.

#### Should I include data migration risk?

**Answer:** Put a realistic migration estimate in the one-time field and add contingency. Integrations and custom reports normally cost more than the data load itself.

## Search terms

sage 100 cloud migration cost, sage 100 on premise vs cloud, sage 100 break even calculator, sage 100 server replacement cost, move sage 100 to the cloud, sage 100 hosting cost

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
