# Sage X3 4GL Syntax Reference: Loops, Database, Errors and Functions

> Source: https://netray.co/tools/sage-x3-4gl-syntax-and-functions-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

One searchable table of the Sage X3 V11/V12 4GL keywords developers look up most, with one-line syntax and the gotchas, plus the fstat return values.

## Category

other-erp

## Erp

Sage X3

## Audience

- Sage X3 developer
- Sage X3 consultant
- ERP administrator

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Keyword

**Key:** keyword

**Type:** text

#### Group

**Key:** group

**Type:** select

**Options:**

- Loops
- Conditions
- Database
- Transactions
- Error handling
- Strings
- Numbers
- Dates
- Subprograms
- Variables

#### Syntax (example)

**Key:** syntax

**Type:** text

#### Notes

**Key:** notes

**Type:** text

**Rows:**

**Keyword:** For ... To ... Next

**Group:** Loops

**Syntax:** For I = 1 To 10 : ... : Next I

**Notes:** Counter loop; a Step clause changes the increment.

**Keyword:** For (list of values)

**Group:** Loops

**Syntax:** For CODE = "A", "B", "C" : ... : Next CODE

**Notes:** Loops over an explicit list of values.

**Keyword:** For [table] Where

**Group:** Loops

**Syntax:** For [ITM]ITM0 Where ITMSTA = 1 : ... : Next

**Notes:** Database read loop on a key with optional Where; fields land in [F:ITM].

**Keyword:** For ... Sql ... As

**Group:** Loops

**Syntax:** For (Char ITMREF(20)) From "<db type>" Sql "select ITMREF_0 from ..." As [YSQL]

**Notes:** Loop over a native SQL statement; database type code is a string.

**Keyword:** While ... Wend

**Group:** Loops

**Syntax:** While I < 10 : I += 1 : Wend

**Notes:** Tests the condition before each pass.

**Keyword:** Repeat ... Until

**Group:** Loops

**Syntax:** Repeat : I += 1 : Until I >= 10

**Notes:** Body runs at least once.

**Keyword:** If ... Elsif ... Else ... Endif

**Group:** Conditions

**Syntax:** If A = 1 : ... : Elsif A = 2 : ... : Else : ... : Endif

**Notes:** Elsif avoids nested If blocks.

**Keyword:** Case ... When ... Endcase

**Group:** Conditions

**Syntax:** Case STA : When 1 : ... : When 2, 3 : ... : When Default : ... : Endcase

**Notes:** When Default handles all other values.

**Keyword:** Local File

**Group:** Database

**Syntax:** Local File ITMMASTER [ITM]

**Notes:** Opens a table with an abbreviation for the current script level.

**Keyword:** Read

**Group:** Database

**Syntax:** Read [ITM]ITM0 = "A100"

**Notes:** Reads one record by key; also First, Last, Next, Prev, Curr, and <=, >= modes. Check fstat after.

**Keyword:** Readlock

**Group:** Database

**Syntax:** Readlock [ITM]ITM0 = "A100"

**Notes:** Reads and locks the line until the end of the transaction or Unlock. Use inside Trbegin.

**Keyword:** Look

**Group:** Database

**Syntax:** Look [ITM]ITM0 = "A100"

**Notes:** Tests existence; same syntax as Read but [F] fields are not loaded. Not usable on Link joins.

**Keyword:** Write

**Group:** Database

**Syntax:** Write [ITM]

**Notes:** Inserts the current [F:ITM] record; fstat 3 means duplicate key.

**Keyword:** Rewrite

**Group:** Database

**Syntax:** Rewrite [ITM]

**Notes:** Updates the line read previously; fstat 6 means another user changed it (updtick).

**Keyword:** Delete

**Group:** Database

**Syntax:** Delete [ITM]ITM0 = "A100"

**Notes:** Deletes a line; fstat 7 is a delete conflict.

**Keyword:** Update ... Where ... With

**Group:** Database

**Syntax:** Update [ITM] Where ITMSTA = 6 With ITMDES2 = "OBSOLETE"

**Notes:** Set-based update of many lines in one statement.

**Keyword:** Link

**Group:** Database

**Syntax:** Link [SOP] With [SOH]SOH0 = [F:SOP]SOHNUM As [LNK]

**Notes:** Declares a join read with one Read or For on [LNK].

**Keyword:** Filter

**Group:** Database

**Syntax:** Filter [ITM] Where TCLCOD = "FG"

**Notes:** Applies a persistent Where to later reads; an Order By clause can change the access key. Filter [ITM] alone removes it, and a new Filter replaces the previous one.

**Keyword:** Columns

**Group:** Database

**Syntax:** Columns [ITM] (ITMREF, ITMDES1)

**Notes:** Limits the columns loaded by For loops; add Extended to apply it to Read and Readlock too. Columns [ITM] alone restores all columns.

**Keyword:** fstat

**Group:** Error handling

**Syntax:** If fstat <> [V]CST_AOK : ... : Endif

**Notes:** Status after every database instruction; compare with constants, not numbers.

**Keyword:** fstat 0 [V]CST_AOK

**Group:** Error handling

**Syntax:** fstat = [V]CST_AOK

**Notes:** Operation succeeded.

**Keyword:** fstat 1 [V]CST_ALOCK

**Group:** Error handling

**Syntax:** fstat = [V]CST_ALOCK

**Notes:** Record locked by another user.

**Keyword:** fstat 2 [V]CST_AOUTSEARCH

**Group:** Error handling

**Syntax:** fstat = [V]CST_AOUTSEARCH

**Notes:** Read with <= or >= found a record whose key is not an exact match.

**Keyword:** fstat 3 [V]CST_ADUPKEY

**Group:** Error handling

**Syntax:** fstat = [V]CST_ADUPKEY

**Notes:** Duplicate value on a unique index.

**Keyword:** fstat 4 [V]CST_AOUTKEYS

**Group:** Error handling

**Syntax:** fstat = [V]CST_AOUTKEYS

**Notes:** Key value is below or above all existing keys.

**Keyword:** fstat 5 [V]CST_ANOREC

**Group:** Error handling

**Syntax:** fstat = [V]CST_ANOREC

**Notes:** No record read (no current record).

**Keyword:** fstat 6 [V]CST_ARECTICKUPD

**Group:** Error handling

**Syntax:** fstat = [V]CST_ARECTICKUPD

**Notes:** Update conflict: the updtick value changed since the read.

**Keyword:** fstat 7 [V]CST_ARECTICKDEL

**Group:** Error handling

**Syntax:** fstat = [V]CST_ARECTICKDEL

**Notes:** Delete conflict on updtick.

**Keyword:** Onerrgo

**Group:** Error handling

**Syntax:** Onerrgo ERR_LBL

**Notes:** Branches to a label on a runtime error; Onerrgo alone cancels it.

**Keyword:** Resume

**Group:** Error handling

**Syntax:** Resume

**Notes:** Returns from an Onerrgo label to the instruction after the error.

**Keyword:** errn / errmes$ / errl

**Group:** Error handling

**Syntax:** MSG = errmes$(errn) + " line " + num$(errl)

**Notes:** Error number, message for a number, and line of the last error.

**Keyword:** Trbegin

**Group:** Transactions

**Syntax:** Trbegin [ITM]

**Notes:** Starts a transaction; only one level is supported, test adxlog first.

**Keyword:** Commit

**Group:** Transactions

**Syntax:** Commit

**Notes:** Only valid in the script or subprogram level that ran Trbegin.

**Keyword:** Rollback

**Group:** Transactions

**Syntax:** Rollback

**Notes:** Undoes all updates since Trbegin, including tables opened before it.

**Keyword:** adxlog

**Group:** Transactions

**Syntax:** If adxlog : ... : Endif

**Notes:** 1 when a transaction is already in progress, otherwise 0.

**Keyword:** format$

**Group:** Strings

**Syntax:** format$("N3:10.2", AMT) ; format$("D:DD[/]MM[/]YYYY", date$)

**Notes:** Type letter K, N, D or LAnnn, options, colon, mask; bracketed text is literal.

**Keyword:** num$

**Group:** Strings

**Syntax:** num$(QTY)

**Notes:** Converts any value (number, date, uuid) to its string form.

**Keyword:** val

**Group:** Numbers

**Syntax:** val("12.5")

**Notes:** Converts a string to a number.

**Keyword:** left$ / right$

**Group:** Strings

**Syntax:** left$(ITMREF, 3) ; right$(ITMREF, 4)

**Notes:** right$ takes the substring from the given position to the end.

**Keyword:** mid$

**Group:** Strings

**Syntax:** mid$(STR, 2, 3)

**Notes:** Substring from a start position for a length.

**Keyword:** seg$

**Group:** Strings

**Syntax:** seg$(STR, 4, 6)

**Notes:** Substring from a start position to an end position.

**Keyword:** len

**Group:** Strings

**Syntax:** len(STR)

**Notes:** Length of the string.

**Keyword:** instr

**Group:** Strings

**Syntax:** instr(1, STR, "GHI")

**Notes:** Position of a substring, searching from a start position; 0 if absent.

**Keyword:** string$

**Group:** Strings

**Syntax:** string$(5, "-")

**Notes:** Repeats a string or character code n times.

**Keyword:** toupper / tolower

**Group:** Strings

**Syntax:** toupper(STR)

**Notes:** Case conversion.

**Keyword:** ctrans

**Group:** Strings

**Syntax:** ctrans(STR) ; ctrans(STR, "ab", "AB")

**Notes:** Removes accents by default, or maps characters with your own tables.

**Keyword:** date$

**Group:** Dates

**Syntax:** D = date$

**Notes:** Current date.

**Keyword:** gdat$

**Group:** Dates

**Syntax:** gdat$(1, month(date$), year(date$))

**Notes:** Builds a date from day, month and year.

**Keyword:** eomonth

**Group:** Dates

**Syntax:** eomonth(date$)

**Notes:** Last day of the month of the given date.

**Keyword:** addmonth

**Group:** Dates

**Syntax:** addmonth(date$, 6)

**Notes:** Adds months to a date.

**Keyword:** nday

**Group:** Dates

**Syntax:** nday(D)

**Notes:** Days since 1/1/1600; same as D - [1/1/1600].

**Keyword:** day / month / year

**Group:** Dates

**Syntax:** year(date$)

**Notes:** Extracts parts of a date as integers.

**Keyword:** Call

**Group:** Subprograms

**Syntax:** Call CONTROL(ITMREF, OK) From YSPEITM

**Notes:** Calls a Subprog in another script.

**Keyword:** Subprog ... End

**Group:** Subprograms

**Syntax:** Subprog CONTROL(ITMREF, OK) : Value Char ITMREF() : Variable Integer OK : ... : End

**Notes:** Value parameters are copies, Variable parameters are by reference.

**Keyword:** Funprog ... End

**Group:** Subprograms

**Syntax:** Funprog TOTAL(A, B) : Value Decimal A, B : End A + B

**Notes:** Function returning a value; called with func SCRIPT.TOTAL(1, 2).

**Keyword:** Gosub ... Return

**Group:** Subprograms

**Syntax:** Gosub CALC : ... : $CALC : ... : Return

**Notes:** Jumps to a label in the same script; labels start with $.

**Keyword:** Raz

**Group:** Variables

**Syntax:** Raz [F:ITM]

**Notes:** Sets variables or a whole class to null values.

**Notes:** Syntax and fstat values follow the Sage X3 V12 developer help (V7DEV 4GL pages). Check your version's help for exact optional clauses. Examples are illustrative; adapt table abbreviations and fields to your folder.

## Content

**Intro:** A searchable reference of the Sage X3 4GL (L4G) keywords developers look up most on V11 and V12: loops, database reads and writes, transactions, error handling, string, number and date functions. Each row gives a one-line syntax example and the practical gotcha, and the fstat return codes are listed with their constant names.

**Sections:**

#### How to use it

**Body:** Type in the search box to filter by keyword or group, for example fstat, Readlock or format$. The syntax column is written the way you type it in the editor, with colons standing in for line breaks. Export the table to Excel if you want a desk copy for a project team. The notes column holds the behaviour that trips people up, such as Look not loading [F] fields or Commit only working at the level that ran Trbegin.

**Bullets:**

- Filter by group to see all database instructions together.
- Use the constant names, not numbers, when testing fstat.
- Keep the export with your specific-development standards.

#### Where this lives in Sage X3

**Body:** From V7 onward, 4GL scripts are edited in the Eclipse-based Sage X3 development environment connected to a folder, or in the classic process editor under Development > Processes. Specific and vertical scripts conventionally start with Y, Z or X and are protected by activity codes so patches do not overwrite them. Tables are declared with Local File and an abbreviation, and the current record of a table lives in the [F:abbreviation] class. Database instructions set fstat; runtime errors set errn and can be trapped with Onerrgo.

#### Worked example: safe update of one item

**Body:** To change ITMDES2 on item A100 safely: test adxlog and start Trbegin [ITM] only if no transaction is running. Readlock [ITM]ITM0 = "A100" and check fstat: CST_ALOCK means another user holds it, CST_ANOREC means it does not exist. Set [F:ITM]ITMDES2, then Rewrite [ITM]. If fstat is CST_ARECTICKUPD someone changed the record since your read, so Rollback and report; otherwise Commit. The same pattern applies inside a For loop, but keep transactions short so locks are not held across hundreds of lines.

#### Version differences and gotchas

**Body:** Only one transaction level exists, so a subprogram called inside a transaction must not start its own; check adxlog. Rollback covers tables opened before Trbegin too. Rewrite and Delete compare the updtick column, which is why fstat 6 and 7 exist. Onerrgo is scoped to the current script level; a called subprogram needs its own if you want it to trap errors. format$ masks put literal separators in square brackets, as in D:DD[/]MM[/]YYYY.

**Cta:** If you want a private assistant that answers questions about your Sage X3 data and specific code from your own servers, we can set that up.

**Faq:**

#### How do I write a For loop on a table in Sage X3?

**Answer:** Declare the table with Local File ITMMASTER [ITM], then use For [ITM]ITM0 Where ITMSTA = 1 followed by your instructions and Next. Each pass loads the record into [F:ITM]. Add Columns to limit fields and keep the Where on indexed columns where possible for large tables.

#### How do I format a number or date with format$ in Sage X3?

**Answer:** format$ takes a mask and a value. The mask starts with a type letter (N for number, D for date, K for string), optional option letters, a colon, then positions. format$("N3:10.2", AMT) groups thousands with two decimals; format$("D:DD[/]MM[/]YYYY", date$) prints a day-month-year date with literal slashes.

#### What does fstat 6 mean in Sage X3?

**Answer:** fstat 6, constant [V]CST_ARECTICKUPD, is an update conflict: the line no longer has the updtick value it had when you read it, so another process changed it. Roll back, reread the record and retry or report the conflict to the user instead of overwriting their change.

#### How does error handling work in Sage X3 4GL?

**Answer:** Database instructions return a status in fstat, which you test after each call. Runtime errors are trapped with Onerrgo LABEL; inside the label, errn gives the error number, errmes$(errn) the message and errl the line. Use Resume to continue after the failing instruction, or exit cleanly with a Rollback.

## Search terms

sage x3 4gl, sage x3 l4g, sage x3 for loop, sage x3 format$, sage x3 number format, sage x3 error handling, sage x3 fstat, sage x3 customization, sage x3 technical help

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
