# SAP BOM Where-Used SQL Generator: STPO, MAST and STKO Queries for Components and Dependencies

> Source: https://netray.co/tools/sap-bom-where-used-sql-generator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Fill in a component, plant and BOM usage to get SQL that lists every parent BOM using it, plus a query for BOM items with dependencies.

## Category

sap

## Erp

SAP S/4HANA

## Audience

- SAP PLM consultant
- SAP VC consultant
- Data analyst

## Tool

**Kind:** template

**Output:** code

**Language:** sql

**Fields:**

#### Client (MANDT)

**Key:** client

**Type:** text

**Default:** 100

#### Component material (IDNRK)

**Key:** component

**Type:** text

**Default:** COMP-4410

#### Parent material (MATNR)

**Key:** parent

**Type:** text

**Default:** CONF-PUMP-100

#### Plant (WERKS)

**Key:** plant

**Type:** text

**Default:** 1000

#### BOM usage (STLAN)

**Key:** usage

**Type:** select

**Options:**

- 1
- 2
- 3
- 4
- 5
- 6

**Default:** 1

**Help:** 1 production, 2 engineering, 3 universal, 4 plant maintenance, 5 sales, 6 costing.

**Blocks:**

#### Where-used: parents of a component

**Body:** SELECT m.matnr AS parent_material,
       m.werks,
       m.stlan AS bom_usage,
       m.stlnr AS bom_number,
       m.stlal AS alternative,
       p.posnr AS item,
       p.idnrk AS component,
       p.menge AS quantity,
       p.meins AS uom,
       p.datuv AS valid_from
FROM stpo p
JOIN mast m
  ON m.mandt = p.mandt
 AND m.stlnr = p.stlnr
JOIN stko k
  ON k.mandt = p.mandt
 AND k.stlty = p.stlty
 AND k.stlnr = p.stlnr
 AND k.stlal = m.stlal
WHERE p.mandt = '{{client}}'
  AND p.stlty = 'M'
  AND p.idnrk = '{{component}}'
  AND p.lkenz = ' '
  AND m.werks = '{{plant}}'
  AND m.stlan = '{{usage}}'
ORDER BY m.matnr, m.stlal, p.posnr;

#### Items of one parent that carry dependencies

**Body:** SELECT m.matnr AS parent_material,
       p.posnr AS item,
       p.idnrk AS component,
       p.knobj AS dependency_link,
       p.datuv AS valid_from
FROM mast m
JOIN stpo p
  ON p.mandt = m.mandt
 AND p.stlnr = m.stlnr
WHERE m.mandt = '{{client}}'
  AND m.matnr = '{{parent}}'
  AND m.werks = '{{plant}}'
  AND m.stlan = '{{usage}}'
  AND p.stlty = 'M'
  AND p.lkenz = ' '
  AND p.knobj <> '0000000000'
ORDER BY p.posnr;

#### Count BOM items per parent

**Body:** SELECT m.matnr AS parent_material,
       COUNT(*) AS item_count
FROM mast m
JOIN stpo p
  ON p.mandt = m.mandt
 AND p.stlnr = m.stlnr
WHERE m.mandt = '{{client}}'
  AND m.werks = '{{plant}}'
  AND m.stlan = '{{usage}}'
  AND p.stlty = 'M'
  AND p.lkenz = ' '
GROUP BY m.matnr
ORDER BY item_count DESC;

**Notes:** Verify on your system: material number length and padding (numeric materials are left padded with zeros in many releases), the KNOBJ empty value, and whether you need STAS to avoid duplicates on BOMs with item alternatives. These are read-only queries for reporting; for production support prefer the standard where-used transaction CS15.

## Content

**Intro:** A BOM where-used list answers a simple question: which parent products use this component? In SAP the answer sits across STPO, MAST and STKO. This generator writes the SQL for it, plus two helper queries for configurable BOMs.

**Sections:**

#### How to use the generator

**Body:** Enter the client, the component, the plant and the BOM usage, and optionally a parent material for the dependency query. The first block returns every parent BOM that contains the component, with item number, quantity and valid-from date. The second block lists items of one parent that have dependency links, which is the quick way to see where selection conditions sit in a super BOM. The third block counts items per parent to find the biggest structures. Run it against a reporting copy or a read-only HANA view, not against the transactional application server.

#### How the BOM tables connect

**Body:** MAST links a material and plant to a BOM number and alternative. STKO is the BOM header keyed by category, number and alternative. STPO holds the items, keyed by category, number, item node and counter. For a material BOM the category is M, so every query filters STLTY = M. Items marked for deletion carry a flag in LKENZ and should usually be excluded. The KNOBJ field on the item is the pointer to dependencies; a zero value means the item has none.

**Bullets:**

- MAST: material and plant to BOM number
- STKO: header and alternative
- STPO: items, quantities, dependency link
- Filter STLTY = M for material BOMs

#### Common mistakes

**Body:** The usual mistake is trusting a simple STPO to MAST join on BOM number when alternatives and multiple counters exist; check the row counts against CS15 for a few components. Another is ignoring validity dates, so a component that was replaced still shows. Also remember that this is single level: a component can be used in a subassembly that is itself used elsewhere, so a full where-used needs a recursive query or CS15 with multilevel selected. And a generic SQL tool will not know your authorization setup, so confirm access with your security team.

**Cta:** If planners keep asking where a component is used, Netray can set up a read-only assistant over your SAP BOM data that returns the answer with the SQL it ran.

**Faq:**

#### Is this a multilevel where-used?

**Answer:** No. It returns the direct parents of the component. For a multilevel result use CS15 with the multilevel option in SAP, or write a recursive query that repeats the join using each parent as the next component.

#### Why do I get duplicate rows?

**Answer:** Duplicates usually appear when a BOM has several alternatives or item counters and the join does not constrain them. Add the alternative condition through STKO as shown, or bring in STAS if your BOM uses item selection by alternative.

#### What does BOM usage mean?

**Answer:** BOM usage (STLAN) tells which area the BOM is for, for example 1 production, 2 engineering and design, 3 universal, 5 sales and 6 costing. It lets one material have different structures for different purposes. Choose the one your plant uses.

#### Can I run this on ECC?

**Answer:** Yes, the table structure is the same, but the data types differ, mainly the material number length. Adjust the values, test on a copy, and compare a few results with the standard transaction before you trust the query.

## Search terms

sap bom where used sql, sap stpo mast stko join, sap bom table query, sap bom component where used query, sap super bom dependency query, sap bom hana sql, sap stlnr stlal query, sap bom usage table

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
