# SAP BW and BW/4HANA Metadata Tables Reference

> Source: https://netray.co/tools/sap-bw-metadata-tables-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Which table holds transformations, DTPs, process chain runs, ADSOs, InfoObjects and query elements, the key fields, and whether it still applies in BW/4HANA.

## Category

sap

## Erp

SAP BW/4HANA

## Audience

- SAP BW developer
- BW administrator
- Data architect

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Table

**Key:** table

**Type:** text

#### Object

**Key:** object

**Type:** text

#### Key fields

**Key:** keys

**Type:** text

#### What you find there

**Key:** content

**Type:** text

#### BW 7.x / BW/4HANA

**Key:** avail

**Type:** text

#### Join tip

**Key:** join

**Type:** text

**Rows:**

**Table:** RSTRAN

**Object:** Transformation

**Keys:** TRANID, OBJVERS

**Content:** Header: SOURCETYPE, SOURCENAME, TARGETTYPE, TARGETNAME, start and end routine IDs

**Avail:** Both

**Join:** Filter OBJVERS = 'A'. Find all transformations into a target with TARGETNAME.

**Table:** RSTRANRULE

**Object:** Transformation rules

**Keys:** TRANID, OBJVERS, RULEID

**Content:** One row per rule in a transformation

**Avail:** Both

**Join:** Join to RSTRAN on TRANID and OBJVERS.

**Table:** RSTRANFIELD

**Object:** Rule fields

**Keys:** TRANID, OBJVERS, RULEID, ...

**Content:** Source and target fields used by each rule

**Avail:** Both

**Join:** Join to RSTRANRULE on TRANID, OBJVERS, RULEID to map source to target fields.

**Table:** RSAABAP

**Object:** ABAP routine code

**Keys:** CODEID, OBJVERS, LINE_NO

**Content:** Source lines of routines in transformations and DTP filters

**Avail:** Both

**Join:** Search the LINE field to find which routines read a given table.

**Table:** RSBKDTP

**Object:** Data transfer process

**Keys:** DTP, OBJVERS

**Content:** DTP definition with source (SRC, SRCTP) and target (TGT, TGTTP)

**Avail:** Both

**Join:** Match SRC and TGT to RSTRAN SOURCENAME and TARGETNAME.

**Table:** RSBKDTPT

**Object:** DTP texts

**Keys:** LANGU, DTP, OBJVERS

**Content:** DTP descriptions

**Avail:** Both

**Join:** Join on DTP and OBJVERS with LANGU = 'E' or your logon language.

**Table:** RSBKREQUEST

**Object:** DTP request (classic)

**Keys:** REQUID

**Content:** DTP requests and their status in classic request management

**Avail:** BW 7.x; replaced by RSPM request management in BW/4HANA

**Join:** Join DTP to RSBKDTP.

**Table:** RSPMREQUEST

**Object:** Request (RSPM)

**Keys:** Request TSN

**Content:** Requests identified by transaction sequence number, with REQUEST_STATUS and REQUEST_IS_IN_PROCESS flags

**Avail:** BW 7.5 ADSO and BW/4HANA

**Join:** Do not update directly; change request status in the request administration of the ADSO Manage screen.

**Table:** RSPCCHAIN

**Object:** Process chain steps

**Keys:** CHAIN_ID, OBJVERS, TYPE, VARIANTE

**Content:** Each process in a chain with its process type and variant

**Avail:** Both

**Join:** TYPE = 'DTP_LOAD' rows have the DTP name in VARIANTE.

**Table:** RSPCCHAINT

**Object:** Process chain texts

**Keys:** LANGU, CHAIN_ID, OBJVERS

**Content:** Chain descriptions

**Avail:** Both

**Join:** Join on CHAIN_ID and OBJVERS.

**Table:** RSPCLOGCHAIN

**Object:** Process chain runs

**Keys:** CHAIN_ID, LOG_ID

**Content:** One row per chain run with date, time and status

**Avail:** Both

**Join:** LOG_ID links to RSPCPROCESSLOG.

**Table:** RSPCPROCESSLOG

**Object:** Process run status

**Keys:** LOG_ID, TYPE, VARIANTE, INSTANCE

**Content:** Status of each process in a run, with start and end time

**Avail:** Both

**Join:** Join to RSPCLOGCHAIN on LOG_ID to find failed steps per run.

**Table:** RSPCVARIANT

**Object:** Process variants

**Keys:** TYPE, VARIANTE, OBJVERS

**Content:** Parameters of process variants

**Avail:** Both

**Join:** Join on TYPE and VARIANTE from RSPCCHAIN.

**Table:** RSOADSO

**Object:** DataStore object (advanced)

**Keys:** ADSONM, OBJVERS

**Content:** ADSO definition and settings

**Avail:** BW 7.4 SP and later, BW/4HANA

**Join:** Generated tables use the prefix /BIC/A plus the ADSO name.

**Table:** RSOADSOT

**Object:** ADSO texts

**Keys:** LANGU, ADSONM, OBJVERS

**Content:** ADSO descriptions

**Avail:** BW 7.4 SP and later, BW/4HANA

**Join:** Join on ADSONM and OBJVERS.

**Table:** RSDODSO

**Object:** Classic DSO

**Keys:** ODSOBJECT, OBJVERS

**Content:** Classic DataStore object definitions

**Avail:** BW 7.x only; classic DSOs are not supported in BW/4HANA

**Join:** Active table /BIC/A<name>00, activation queue /BIC/A<name>40.

**Table:** RSDCUBE

**Object:** InfoCube

**Keys:** INFOCUBE, OBJVERS

**Content:** InfoCube header

**Avail:** BW 7.x only; InfoCubes are not supported in BW/4HANA

**Join:** Fact tables /BIC/F<cube> and /BIC/E<cube>.

**Table:** RSOHCPR

**Object:** CompositeProvider

**Keys:** HCPRNM, OBJVERS

**Content:** CompositeProvider definitions

**Avail:** BW 7.4 SP and later, BW/4HANA

**Join:** Replaces MultiProviders in BW/4HANA.

**Table:** RSDIOBJ

**Object:** InfoObject

**Keys:** IOBJNM, OBJVERS

**Content:** InfoObject type (IOBJTP), data type, length and settings

**Avail:** Both

**Join:** Master data tables: /BIC/P (attributes), /BIC/Q (time-dependent), /BIC/T (texts), /BIC/S (SIDs), /BIC/H (hierarchy).

**Table:** RSDIOBJT

**Object:** InfoObject texts

**Keys:** LANGU, IOBJNM, OBJVERS

**Content:** Short and long descriptions TXTSH, TXTLG

**Avail:** Both

**Join:** Join on IOBJNM and OBJVERS.

**Table:** RSZCOMPDIR

**Object:** Query components directory

**Keys:** COMPUID, OBJVERS

**Content:** Technical name COMPID and component type DEFTP (REP for a query)

**Avail:** Both

**Join:** COMPUID links to RSZELTDIR and RSZELTTXT ELTUID.

**Table:** RSZELTDIR

**Object:** Query elements

**Keys:** ELTUID, OBJVERS

**Content:** Directory of query elements (queries, structures, key figures, variables)

**Avail:** Both

**Join:** DEFTP gives the element type.

**Table:** RSZELTTXT

**Object:** Query element texts

**Keys:** ELTUID, OBJVERS, LANGU

**Content:** Query and element descriptions TXTLG

**Avail:** Both

**Join:** Query description: RSZCOMPDIR.COMPUID = RSZELTTXT.ELTUID with DEFTP = 'REP'.

**Table:** RSRREPDIR

**Object:** Query directory

**Keys:** COMPUID

**Content:** Query technical name and the InfoProvider (INFOCUBE field) it runs on

**Avail:** Both

**Join:** Fastest way to list queries per InfoProvider.

**Table:** RSDS

**Object:** DataSource

**Keys:** DATASOURCE, LOGSYS, OBJVERS

**Content:** DataSource definitions in BW

**Avail:** Both (BW/4HANA uses ODP and other source types)

**Join:** Join to ROOSOURCE in the source system on the DataSource name.

**Table:** RSLDPIO

**Object:** InfoPackage

**Keys:** LOGDPID, OBJVERS

**Content:** InfoPackage settings with the DataSource (OLTPSOURCE) and source system (LOGSYS)

**Avail:** BW 7.x only; InfoPackages are not used in BW/4HANA

**Join:** Texts in RSLDPIOT.

**Table:** RSTSODS

**Object:** PSA table mapping

**Keys:** ODSNAME, ...

**Content:** Maps a DataSource PSA to its generated /BIC/B table (ODSNAME_TECH)

**Avail:** BW 7.x; BW/4HANA uses an inbound ADSO table instead of PSA

**Join:** Look up the /BIC/B000... table name for a DataSource.

**Table:** RSHIEDIR

**Object:** Hierarchy directory

**Keys:** HIEID, OBJVERS

**Content:** Hierarchies with InfoObject IOBJNM and hierarchy name HIENM

**Avail:** Both

**Join:** Nodes in /BIC/H<iobj>.

**Table:** ROOSOURCE

**Object:** DataSource (source system)

**Keys:** OLTPSOURCE, OBJVERS

**Content:** DataSource header in the source ERP: extractor, delta process, extract structure

**Avail:** Source system table

**Join:** Read it in the ECC or S/4HANA system, not in BW.

**Table:** /BIC/A<name>1

**Object:** ADSO inbound table

**Keys:** Request TSN, data package, record

**Content:** Data loaded but not yet activated

**Avail:** ADSO in BW 7.4 SP and later, BW/4HANA

**Join:** Empty after activation for standard ADSOs.

**Table:** /BIC/A<name>2

**Object:** ADSO active data table

**Keys:** Semantic key of the ADSO

**Content:** Active data used for reporting

**Avail:** ADSO in BW 7.4 SP and later, BW/4HANA

**Join:** Query this for current values.

**Table:** /BIC/A<name>3

**Object:** ADSO change log

**Keys:** Request TSN, data package, record

**Content:** Before and after images for delta to further targets

**Avail:** ADSO in BW 7.4 SP and later, BW/4HANA

**Join:** Grows fast: plan request housekeeping.

**Table:** OBJVERS values

**Object:** Object version

**Keys:** A, M, D

**Content:** A active, M modified (revised, not yet active), D delivered (Business Content)

**Avail:** Both

**Join:** Always filter OBJVERS = 'A' unless you are comparing versions.

**Notes:** Key fields show the main keys; open each table in SE11 on your release for the full list. SAP-delivered objects use /BI0/ instead of /BIC/. Read these tables, never update them directly.

## Content

**Intro:** This reference maps BW metadata objects to the tables that store them, with key fields, what you find there and whether the table still applies in BW/4HANA. Use it to write lineage, impact and monitoring queries in SE16, SQL or an ABAP report on BW 7.x and BW/4HANA.

**Sections:**

#### How to use it

**Body:** Search by object (transformation, DTP, chain, query) or by table name. Each row gives the keys to join on and a tip for the most common question. Almost every metadata table has OBJVERS: filter OBJVERS = 'A' to read the active version, or you get the modified and delivered versions as duplicates. Text tables end in T and have LANGU in the key. For SAP-delivered content, generated table names start with /BI0/ instead of /BIC/.

**Bullets:**

- Lineage: RSTRAN (source to target), RSBKDTP (DTP), RSPCCHAIN (which chain runs the DTP).
- Monitoring: RSPCLOGCHAIN and RSPCPROCESSLOG.
- Query catalog: RSRREPDIR, RSZCOMPDIR, RSZELTTXT.

#### Worked example: which chain loads an ADSO

**Body:** To find what loads ADSO ZSALES01, read RSTRAN with TARGETNAME = 'ZSALES01' and OBJVERS = 'A' to get the source objects. Read RSBKDTP with TGT = 'ZSALES01' to get the DTP names. Then read RSPCCHAIN with TYPE = 'DTP_LOAD' and VARIANTE equal to each DTP name to get the CHAIN_ID, and RSPCCHAINT for the chain text. To see last night's run, take the latest LOG_ID for that CHAIN_ID from RSPCLOGCHAIN and read the step statuses in RSPCPROCESSLOG.

#### Version differences and gotchas

**Body:** BW/4HANA removed InfoCubes, classic DSOs, MultiProviders, InfoPackages and the PSA, so RSDCUBE, RSDODSO, RSLDPIO and RSTSODS describe objects that only exist in BW 7.x. Their replacements are ADSOs (RSOADSO) and CompositeProviders (RSOHCPR). Request handling also changed: ADSO loads in BW 7.5 and all loads in BW/4HANA use RSPM request management with request TSNs instead of request IDs, stored in RSPMREQUEST. Do not edit RSPMREQUEST to unlock a request; use the request administration in the ADSO Manage screen. ADSO tables use suffix 1 (inbound), 2 (active) and 3 (change log).

#### How to check the result in the system

**Body:** Open the table in SE11 to confirm fields on your release, and SE16 or SE16N to read data. Compare what you find with the BW modeling tools in Eclipse or RSA1, for example the transformation source and target or the DTP filter. For process chains, RSPC shows the same runs as RSPCLOGCHAIN. For ADSO tables, the Manage screen of the ADSO lists requests and the generated table names. Where a table is missing on BW/4HANA, the object type itself does not exist there.

**Cta:** If you want your BW team to ask lineage and load-status questions in plain English on your own servers, Netray can add that AI layer over your BW metadata.

**Faq:**

#### Which table stores BW transformations?

**Answer:** RSTRAN holds the transformation header with TRANID, source and target type and name. Rules are in RSTRANRULE and the fields per rule in RSTRANFIELD. Routine code is in RSAABAP. Always filter OBJVERS = 'A' for the active version.

#### What is the DTP table in SAP BW?

**Answer:** RSBKDTP stores DTP definitions with source (SRC, SRCTP) and target (TGT, TGTTP); texts are in RSBKDTPT. Classic DTP requests are in RSBKREQUEST, while BW/4HANA and BW 7.5 ADSO loads use RSPM request management and RSPMREQUEST.

#### Which table has the BW query description?

**Answer:** Join RSZCOMPDIR (technical name COMPID, DEFTP = 'REP' for queries) to RSZELTTXT on COMPUID = ELTUID and filter the language; TXTLG is the description. RSRREPDIR tells you which InfoProvider each query runs on.

#### What are the ADSO table names?

**Answer:** An ADSO generates /BIC/A<name>1 for the inbound table, /BIC/A<name>2 for active data and /BIC/A<name>3 for the change log, depending on the ADSO type. SAP-delivered ADSOs use /BI0/A. Definitions are in RSOADSO.

## Search terms

sap bw table transformation, dtp table sap bw, sap bw table for query description, sap bw table adso, sap bw infopackage table, psa table in sap bw, rspcchain table, rstran table

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
