# SAP Configuration Profile Setup Template

> Source: https://netray.co/tools/sap-configuration-profile-setup-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Document the configuration profile of a configurable material: class assignment, dependencies, BOM explosion level and the checks before release.

## Category

sap

## Erp

SAP S/4HANA

## Audience

- SAP VC consultant
- Product data steward
- Solution architect

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Company

**Key:** company

**Type:** text

**Default:** Acme Pumps Ltd

#### Configurable material

**Key:** material

**Type:** text

**Default:** PUMP-CONFIG-100

#### Plant

**Key:** plant

**Type:** text

**Default:** 1000

#### Configuration profile name

**Key:** profile

**Type:** text

**Default:** PUMP_STD

#### Class (type 300)

**Key:** klass

**Type:** text

**Default:** PUMP_CLASS

#### BOM usage

**Key:** bom_usage

**Type:** select

**Options:**

- 1 Production
- 3 Universal
- 5 Sales and distribution

**Default:** 1 Production

#### BOM explosion

**Key:** explosion

**Type:** select

**Options:**

- Single level
- Multilevel

**Default:** Multilevel

#### Owner

**Key:** owner

**Type:** text

**Default:** A. Kumar

#### Date

**Key:** date

**Type:** date

**Default:** 2026-10-20

#### Dependencies summary

**Key:** deps

**Type:** textarea

**Default:** Precondition on SEAL_TYPE for pumps above 22 kW. Selection condition on BOM item 0030 for SS316 housing. Procedure PUMP_PRICE_CLASS sets price class from variant table.

**Blocks:**

#### Configuration profile

**Body:** Company: {{company}}
Configurable material: {{material}}
Plant: {{plant}}
Profile: {{profile}}
Owner: {{owner}}
Date: {{date}}

#### Class and characteristics

**Body:** Material is assigned to class {{klass}} (class type 300). All characteristics used in dependencies must belong to this class or be set as BOM item characteristics.

#### BOM and routing settings

**Body:** BOM usage: {{bom_usage}}
Explosion: {{explosion}}
Check that BOM items carry selection conditions and that the BOM is in the same plant as the profile.

#### Dependencies

**Body:** {{deps}}

#### Pre-release checks

**Table:**

**Columns:**

- Check
- Result
- Notes

**Rows:**

**0:** Material type configurable and flag set

**0:** Class assigned and values released

**0:** Dependencies status released

**0:** Test configuration in sales order

**0:** Configured BOM explodes correctly

**0:** Pricing condition test passed

#### Approvals

**Signatures:**

- Consultant
- Product owner
- Process owner

**Notes:** This is a documentation aid. Confirm field names and options against your SAP release, since screens differ between ECC and S/4HANA and between the classic and advanced variant configuration.

## Content

**Intro:** A configuration profile ties a configurable material to its class, dependencies and settings, and it is where many VC defects start. This template makes you write the setup down in a consistent form that engineering, sales and support can all read.

**Sections:**

#### How to use the template

**Body:** Fill the fields with the details of the configurable material, then list the dependency summary in plain language. Export to PDF or Word and attach it to the design document or to the transport request. Keep one copy per configurable material or per product family.

**Bullets:**

- One profile document per configurable material
- Write dependencies in plain words, not code
- Record the plant and BOM usage
- Tick the pre-release table in a test client first

#### What a configuration profile controls

**Body:** The profile, created with CU41, is assigned to the configurable material and tells the system which class and which BOM to use during configuration. It can also carry dependencies and settings that govern how configuration behaves, for example whether the BOM is exploded multilevel. Without a valid profile the material cannot be configured in a sales order or a production order.

#### Reading the pre-release table

**Body:** Each row is a gate. If any answer is No, the material is not ready for sales. The test configuration row is the most important because it uses the real chain: characteristic selection, dependency check, BOM explosion and pricing. Record the result with the test order number so the evidence is traceable.

#### Common mistakes

**Body:** Teams forget to release dependencies, so they do not execute. They assign a class of the wrong type, or put BOM items in a different plant. Another common defect is copying a profile from a similar material and keeping dependencies that refer to characteristics the new class does not have.

**Cta:** If you want to check configuration profiles across many materials against the classes and dependencies in your system, we can build a read-only audit.

**Faq:**

#### What is a configuration profile in SAP?

**Answer:** It is the control record for a configurable material. It holds the class link, dependencies and settings that govern configuration. It is maintained with CU41 and assigned to the material.

#### Which class type is used for variant configuration?

**Answer:** Class type 300 is the standard for variant configuration. Characteristics are assigned to this class and the class is assigned to the configurable material.

#### Do I need a profile for each plant?

**Answer:** It depends on how the material and BOM are set up. Many companies keep one profile per material and plant combination where the BOM or plant specific rules differ.

#### Does this work for advanced variant configuration?

**Answer:** The ideas are similar, but advanced variant configuration in S/4HANA uses a different modelling approach and tools. Use this as a starting point and adapt the sections to your model.

## Search terms

SAP configuration profile, SAP CU41 template, SAP configuration profile setup document, SAP configurable material setup, SAP VC design document, SAP configuration profile fields, SAP KMAT material setup, SAP variant configuration documentation

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
