# SAP Cost Element Categories Reference: Every Category and What It Is For

> Source: https://netray.co/tools/sap-cost-element-categories-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A searchable list of SAP CO cost element categories, S/4HANA account types and the master data objects around them.

## Category

sap

## Erp

SAP ECC and S/4HANA

## Audience

- SAP FICO consultant
- Controller
- Cost accountant

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Category / key

**Key:** code

**Type:** text

#### Kind

**Key:** kind

**Type:** text

#### Meaning

**Key:** meaning

**Type:** text

#### Typical use

**Key:** use

**Type:** text

**Rows:**

**Code:** 1

**Kind:** Cost element category

**Meaning:** Primary costs or cost-reducing revenues

**Use:** Expense accounts posted from FI or MM, such as materials, salaries, depreciation. Also credits that reduce cost.

**Code:** 3

**Kind:** Cost element category

**Meaning:** Accrual or deferral per surcharge

**Use:** Accruals calculated in CO through overhead surcharges, shown for costing only.

**Code:** 4

**Kind:** Cost element category

**Meaning:** Accrual or deferral per debit equals credit

**Use:** Accrual or deferral of a cost in CO where debit and credit are posted to the same cost object.

**Code:** 11

**Kind:** Cost element category

**Meaning:** Revenues

**Use:** Revenue accounts that post to CO-PA or sales-related cost objects.

**Code:** 12

**Kind:** Cost element category

**Meaning:** Sales deductions

**Use:** Discounts, rebates and other deductions from revenue.

**Code:** 21

**Kind:** Cost element category

**Meaning:** Internal settlement

**Use:** Settlement of orders or projects to other CO objects inside the controlling area.

**Code:** 22

**Kind:** Cost element category

**Meaning:** External settlement

**Use:** Settlement to objects outside CO, for example a G/L account or an asset under construction.

**Code:** 31

**Kind:** Cost element category

**Meaning:** Order or project results analysis

**Use:** Work in process and results analysis postings.

**Code:** 41

**Kind:** Cost element category

**Meaning:** Overhead rates

**Use:** Overhead applied to cost objects through costing sheets.

**Code:** 42

**Kind:** Cost element category

**Meaning:** Assessment

**Use:** Cost allocation by assessment cycles (KSU5), many senders to many receivers on one cost element.

**Code:** 43

**Kind:** Cost element category

**Meaning:** Internal activity allocation

**Use:** Allocation of activity quantity times activity type price, for example machine or labor hours.

**Code:** P

**Kind:** S/4HANA account type

**Meaning:** Primary costs or revenue

**Use:** G/L account that is also a primary cost element. Created in FS00 with the cost element category.

**Code:** S

**Kind:** S/4HANA account type

**Meaning:** Secondary costs

**Use:** G/L account that acts as a secondary cost element for allocations and settlement. Created in KA06 or FS00.

**Code:** N

**Kind:** S/4HANA account type

**Meaning:** Nonoperating expense or income

**Use:** P&L account that is not a cost element, such as interest or other financial items.

**Code:** X

**Kind:** S/4HANA account type

**Meaning:** Balance sheet account

**Use:** Balance sheet G/L account. Never a cost element.

**Code:** KA01

**Kind:** Transaction (ECC)

**Meaning:** Create primary cost element

**Use:** ECC master data. In S/4HANA primary cost elements are created as G/L accounts instead.

**Code:** KA06

**Kind:** Transaction

**Meaning:** Create secondary cost element

**Use:** Used to create the elements for assessment, distribution, activity allocation and settlement.

**Code:** KA03

**Kind:** Transaction (ECC)

**Meaning:** Display cost element

**Use:** Shows category, validity dates and attributes such as unit of measure.

**Code:** CSKA

**Kind:** Table (ECC)

**Meaning:** Cost element master data by chart of accounts

**Use:** Joins to CSKB for the controlling-area data, including the category field KATYP.

**Code:** CSKB

**Kind:** Table

**Meaning:** Cost elements data per controlling area

**Use:** Holds validity period and category (KATYP) per controlling area.

**Code:** CSKU

**Kind:** Table

**Meaning:** Cost element texts

**Use:** Names and descriptions per language.

**Notes:** Category numbers are those delivered in standard SAP. Your system may restrict which categories are available for a given account type. Confirm in KA03 or table CSKB (field KATYP) before relying on a value.

## Content

**Intro:** The cost element category tells SAP Controlling what kind of cost flow a cost element represents. Choosing it wrongly blocks postings, such as an allocation that will not accept a secondary element. This reference lists the standard categories, the S/4HANA account types that replaced separate cost element master data, and the transactions and tables that carry them.

**Sections:**

#### How to use this lookup

**Body:** Type a category number, a transaction or a keyword like settlement into the search box and the table filters live. Use it when creating a new secondary element for an assessment cycle, when a CO posting is rejected with a message about the cost element category, or when you document a chart of accounts design for a project. The result can be exported to Excel or PDF so the same list can sit in your blueprint document.

**Bullets:**

- Search by number, for example 43
- Search by process word, for example assessment or settlement
- Export the filtered view for your design document

#### Primary versus secondary elements

**Body:** Primary cost elements, category 1 for costs and 11 or 12 for revenue, exist as G/L accounts and are created by FI or MM postings. Secondary elements, categories 21, 22, 31, 41, 42 and 43, exist only in CO and carry internal flows. In ECC they are separate master data in KA01 and KA06. In S/4HANA they are G/L accounts with account type P or S, which is why the reconciliation between FI and CO is now automatic in the Universal Journal table ACDOCA.

#### Choosing a category in practice

**Body:** Match the category to the CO function that will post it. Assessment cycles need category 42, activity allocation from cost center to production order needs 43, and order settlement needs 21 or 22 depending on the receiver. A common design is one assessment element per business purpose so cost center reports show clearly where an allocation came from. Avoid using one element for several cycles.

#### Common mistakes

**Body:** Using category 1 for something that should be an allocation, so reports mix real expense with internal charge. Creating too many assessment elements and losing the report overview. Forgetting validity dates, so a new element cannot be posted in the current period. In S/4HANA, setting account type N on a P&L account that should have been a cost element, then wondering why cost center postings fail.

**Cta:** If you want these checks run against your own chart of accounts, such as finding secondary elements with the wrong category, Netray can set up a read-only query over your SAP data.

**Faq:**

#### What is the difference between category 42 and 43?

**Answer:** Category 42 is assessment, which moves cost with a fixed percentage or fixed amount across senders and receivers. Category 43 is internal activity allocation, which moves quantity multiplied by an activity type price, such as machine hours times a rate.

#### Are cost elements still separate objects in S/4HANA?

**Answer:** No. In S/4HANA the cost element is a G/L account with an account type of P or S, plus a cost element category. Master data is maintained in FS00 or in the Fiori app for G/L accounts, with KA06 still available for secondary ones.

#### Can I change a category after postings exist?

**Answer:** Generally not. SAP restricts changing the category once the element has been used. The usual approach is to create a new element with a new validity period or number and stop using the old one.

#### Which category do I use for freight surcharges added by a costing sheet?

**Answer:** Overhead applied through a costing sheet uses category 41. The credit side of the overhead is posted to a separate element so the original cost stays visible.

## Search terms

sap cost element categories, sap cost element category list, sap primary and secondary cost elements, cost element category 43 sap, ka06 secondary cost element, sap s/4hana cost elements as gl accounts, cost element category 11 revenue, sap co cost element types

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
