# SAP CVI Business Partner Gap Report ABAP Generator

> Source: https://netray.co/tools/sap-cvi-business-partner-gap-abap-generator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Generates an ABAP report that finds customers and vendors without a Business Partner link, the first check before a CVI conversion.

## Category

sap

## Erp

SAP S/4HANA

## Audience

- SAP ABAP developer
- SAP data migration lead
- SAP functional consultant

## Tool

**Kind:** template

**Output:** code

**Language:** abap

**Fields:**

#### Report name

**Key:** report_name

**Type:** text

**Default:** ZCVI_GAP_CHECK

**Help:** Must start with Z or Y

#### Max rows per list

**Key:** max_rows

**Type:** number

**Default:** 5000

#### Customer account group (blank for all)

**Key:** cust_group

**Type:** text

**Blocks:**

#### Customers without a Business Partner link

**Body:** REPORT {{report_name}}.

DATA lv_ktokd TYPE kna1-ktokd.
SELECT-OPTIONS s_ktokd FOR lv_ktokd.

START-OF-SELECTION.
  SELECT a~kunnr, a~name1, a~ktokd, a~land1
    FROM kna1 AS a
    LEFT OUTER JOIN cvi_cust_link AS l ON l~customer = a~kunnr
    WHERE l~customer IS NULL
      AND a~ktokd IN @s_ktokd
    INTO TABLE @DATA(lt_cust)
    UP TO {{max_rows}} ROWS.

  WRITE: / 'Customers without BP link:', lines( lt_cust ).
  LOOP AT lt_cust INTO DATA(ls_cust).
    WRITE: / ls_cust-kunnr, ls_cust-ktokd, ls_cust-land1, ls_cust-name1.
  ENDLOOP.

#### Vendors without a Business Partner link

**Body:** * Add this block to the same report, after the customer loop.
  SELECT a~lifnr, a~name1, a~ktokk, a~land1
    FROM lfa1 AS a
    LEFT OUTER JOIN cvi_vend_link AS l ON l~vendor = a~lifnr
    WHERE l~vendor IS NULL
    INTO TABLE @DATA(lt_vend)
    UP TO {{max_rows}} ROWS.

  WRITE: / 'Vendors without BP link:', lines( lt_vend ).
  LOOP AT lt_vend INTO DATA(ls_vend).
    WRITE: / ls_vend-lifnr, ls_vend-ktokk, ls_vend-land1, ls_vend-name1.
  ENDLOOP.

#### Optional: customers also set up as vendors

**Body:** * Candidates for a single Business Partner with both roles.
* Compare on tax number or on the vendor field KUNNR in LFA1.
  SELECT l~lifnr, l~kunnr, l~name1
    FROM lfa1 AS l
    WHERE l~kunnr <> @space
    INTO TABLE @DATA(lt_both)
    UP TO {{max_rows}} ROWS.

  WRITE: / 'Vendors that reference a customer:', lines( lt_both ).

**Notes:** Requires ABAP 7.40 or later for the inline syntax. CVI link tables exist only where the Customer Vendor Integration components are installed, so verify CVI_CUST_LINK and CVI_VEND_LINK in SE11 on your release. Run in a sandbox first. This report only reads data.

## Content

**Intro:** Before converting to S/4HANA, every customer and vendor must be linked to a Business Partner through CVI. This generator produces a read-only ABAP report that lists the records that are not linked yet.

**Sections:**

#### How to use the generated report

**Body:** Fill in the report name, row limit and optional account group, then copy the code into SE38 in a sandbox copy of production. Activate and run it. The customer list reads KNA1 and left joins CVI_CUST_LINK, so rows with an empty link are customers without a Business Partner. The vendor block does the same for LFA1 and CVI_VEND_LINK. Use the counts as a baseline and rerun after each CVI synchronization cycle.

**Bullets:**

- Run in a copy of production, not directly in production first
- Filter by account group to isolate one-time or blocked accounts
- Save counts per run to show progress to the program board

#### Why the gap matters

**Body:** In S/4HANA the Business Partner is the leading object, so customers and vendors that cannot be converted block the technical conversion until their data is clean. Typical reasons include missing mandatory fields, inconsistent country or region, duplicates, and account groups without a mapping in CVI customizing. The gap list is the starting point for cleansing, and the same keys help prioritize records that have open items or recent activity.

#### Common mistakes

**Body:** Do not assume every unlinked record is bad data. In some systems CVI is partly active already. Check your own configuration first. Do not delete records just because they are unlinked, since open documents may reference them. Also remember that blocked, deletion flagged and rarely used accounts often dominate the count, so filter by status before sizing cleanup effort.

**Cta:** If the gap list is large, Netray can help build a repeatable cleansing and deduplication approach for the master data before CVI runs.

**Faq:**

#### Does this report change any data?

**Answer:** No. It only runs SELECT statements and writes a list to the screen. It is safe to run in a sandbox, but still follow your change policy and avoid running on production at peak hours.

#### Why are the link tables missing in my system?

**Answer:** The CVI link tables belong to the Customer Vendor Integration component. If they are absent in SE11, CVI is not installed on that release, and you must follow SAP guidance to enable it before the pre-conversion checks.

#### Can I use this for large systems?

**Answer:** Yes, but raise the row limit carefully. For millions of records, write to a file or a Z table instead of using WRITE, and run in background to avoid dialog time limits.

#### What comes after the gap report?

**Answer:** Cleanse the data, fix customizing, run the synchronization cockpit, and rerun the report until counts are acceptable. The SAP pre-checks in the conversion then confirm CVI consistency.

## Search terms

cvi_cust_link abap, customers without business partner, vendors without business partner, cvi gap report abap, kna1 cvi_cust_link select, s4hana cvi pre check, business partner conversion abap, cvi synchronization check

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
