# SAP BAPI to Update Batch Characteristics: ABAP Generator for BAPI_OBJCL_GETDETAIL and BAPI_OBJCL_CHANGE

> Source: https://netray.co/tools/sap-ecc-batch-classification-bapi-objcl-abap-generator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Enter material, batch, plant, batch class and characteristic, and get an ABAP report that builds the correct MCH1 or MCHA object key, reads the batch classification and optionally changes one value with commit or rollback.

## Category

developer

## Erp

SAP ECC 6.0

## Audience

- ABAP developer
- SAP MM/QM consultant
- SAP batch management consultant

## Tool

**Kind:** template

**Output:** code

**Language:** abap

**Fields:**

#### Report name

**Key:** report

**Type:** text

**Default:** ZMM_BATCH_CLASS_VALUES

#### Material number (external format)

**Key:** material

**Type:** text

**Default:** 100245

**Help:** Converted with CONVERSION_EXIT_MATN1_INPUT, so numeric materials get leading zeros.

#### Batch (CHARG)

**Key:** batch

**Type:** text

**Default:** 0000012345

#### Plant (WERKS)

**Key:** plant

**Type:** text

**Default:** 1000

**Help:** Used in the key only when the object table is MCHA (plant-level batches).

#### Object table (from your batch level)

**Key:** objtab

**Type:** select

**Options:**

- MCH1
- MCHA

**Default:** MCH1

**Help:** MCH1 for material-level or client-level batches, MCHA for plant-level batches.

#### Batch class (CLASSNUM)

**Key:** classnum

**Type:** text

**Default:** Z_BATCH_CLASS

#### Class type (KLART)

**Key:** classtype

**Type:** text

**Default:** 023

**Help:** 023 is the standard batch class type.

#### Characteristic name (ATNAM, CHAR type)

**Key:** charact

**Type:** text

**Default:** Z_HEAT_NUMBER

#### New value

**Key:** newvalue

**Type:** text

**Default:** H-88231

#### Mode

**Key:** mode

**Type:** select

**Options:**

- READ
- CHANGE

**Default:** READ

**Blocks:**

#### Declarations and object key

**Body:** REPORT {{report}}.

* Read or change batch classification values (class type {{classtype}})
* Object table {{objtab}}: MCH1 = batch unique per material or client,
* MCHA = batch unique per plant. Must match your batch level (OMCT).

CONSTANTS: gc_mode   TYPE c LENGTH 6 VALUE '{{mode}}',
           gc_objtab TYPE bapi1003_key-objecttable VALUE '{{objtab}}'.

DATA: lv_matnr     TYPE matnr,
      lv_werks     TYPE werks_d,
      lv_charg     TYPE charg_d,
      lv_objkey    TYPE bapi1003_key-object,
      lv_classnum  TYPE bapi1003_key-classnum,
      lv_classtype TYPE bapi1003_key-classtype,
      lv_status    TYPE bapi1003_key-status,
      lv_error     TYPE c LENGTH 1,
      lt_num       TYPE STANDARD TABLE OF bapi1003_alloc_values_num,
      lt_char      TYPE STANDARD TABLE OF bapi1003_alloc_values_char,
      lt_curr      TYPE STANDARD TABLE OF bapi1003_alloc_values_curr,
      lt_return    TYPE STANDARD TABLE OF bapiret2,
      ls_num       TYPE bapi1003_alloc_values_num,
      ls_char      TYPE bapi1003_alloc_values_char,
      ls_return    TYPE bapiret2.

lv_werks     = '{{plant}}'.
lv_charg     = '{{batch}}'.
lv_classnum  = '{{classnum}}'.
lv_classtype = '{{classtype}}'.

CALL FUNCTION 'CONVERSION_EXIT_MATN1_INPUT'
  EXPORTING
    input        = '{{material}}'
  IMPORTING
    output       = lv_matnr
  EXCEPTIONS
    length_error = 1
    OTHERS       = 2.
IF sy-subrc <> 0.
  WRITE: / 'Material number conversion failed'.
  RETURN.
ENDIF.

* Fixed-length key: use offsets, CONCATENATE would drop trailing blanks
CLEAR lv_objkey.
lv_objkey(18) = lv_matnr.
IF gc_objtab = 'MCHA'.
  lv_objkey+18(4)  = lv_werks.
  lv_objkey+22(10) = lv_charg.
ELSE.
  lv_objkey+18(10) = lv_charg.
ENDIF.

#### Read the batch classification (BAPI_OBJCL_GETDETAIL)

**Body:** CALL FUNCTION 'BAPI_OBJCL_GETDETAIL'
  EXPORTING
    objectkey       = lv_objkey
    objecttable     = gc_objtab
    classnum        = lv_classnum
    classtype       = lv_classtype
    keydate         = sy-datum
    language        = sy-langu
  IMPORTING
    status          = lv_status
  TABLES
    allocvaluesnum  = lt_num
    allocvalueschar = lt_char
    allocvaluescurr = lt_curr
    return          = lt_return.

LOOP AT lt_return INTO ls_return WHERE type = 'E' OR type = 'A'.
  WRITE: / ls_return-type, ls_return-message.
  lv_error = 'X'.
ENDLOOP.
IF lv_error = 'X'.
  RETURN.
ENDIF.

WRITE: / 'Object key:', lv_objkey, 'Status:', lv_status.
LOOP AT lt_char INTO ls_char.
  WRITE: / ls_char-charact, ls_char-value_char.
ENDLOOP.
LOOP AT lt_num INTO ls_num.
  WRITE: / ls_num-charact, ls_num-value_from.
ENDLOOP.

#### Change one character value (BAPI_OBJCL_CHANGE) when mode is CHANGE

**Body:** IF gc_mode = 'CHANGE'.
* The BAPI replaces the whole allocation: pass back every value you read
  READ TABLE lt_char INTO ls_char WITH KEY charact = '{{charact}}'.
  IF sy-subrc = 0.
    ls_char-value_char    = '{{newvalue}}'.
    ls_char-value_neutral = '{{newvalue}}'.
    MODIFY lt_char FROM ls_char INDEX sy-tabix.
  ELSE.
    CLEAR ls_char.
    ls_char-charact       = '{{charact}}'.
    ls_char-value_char    = '{{newvalue}}'.
    ls_char-value_neutral = '{{newvalue}}'.
    APPEND ls_char TO lt_char.
  ENDIF.

  CLEAR: lt_return, lv_error.
  CALL FUNCTION 'BAPI_OBJCL_CHANGE'
    EXPORTING
      objectkey          = lv_objkey
      objecttable        = gc_objtab
      classnum           = lv_classnum
      classtype          = lv_classtype
      status             = '1'
      keydate            = sy-datum
    IMPORTING
      classif_status     = lv_status
    TABLES
      allocvaluesnumnew  = lt_num
      allocvaluescharnew = lt_char
      allocvaluescurrnew = lt_curr
      return             = lt_return.

  LOOP AT lt_return INTO ls_return WHERE type = 'E' OR type = 'A'.
    WRITE: / ls_return-type, ls_return-message.
    lv_error = 'X'.
  ENDLOOP.

  IF lv_error = 'X'.
    CALL FUNCTION 'BAPI_TRANSACTION_ROLLBACK'.
    WRITE: / 'Change rolled back'.
  ELSE.
    CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
      EXPORTING
        wait = 'X'.
    WRITE: / 'Changed', '{{charact}}', 'to', '{{newvalue}}'.
  ENDIF.
ENDIF.

**Notes:** Paste the three blocks in order into one report in SE38 and run it in a development or quality client first. Verify on your system: the BAPI parameters in SE37 (some EHP levels add OBJECTKEY_LONG and the long value fields VALUE_CHAR_LONG and VALUE_NEUTRAL_LONG); your batch level in OMCT (stored in TCUCH) so you choose MCH1 or MCHA; the material length (18 characters unless long material numbers are active); and that the characteristic is of data type CHAR. Numeric and date characteristics go in ALLOCVALUESNUM, currency ones in ALLOCVALUESCURR.

## Content

**Intro:** This generator writes an ABAP report for SAP ECC 6.0 that reads a batch's classification with BAPI_OBJCL_GETDETAIL and, in CHANGE mode, updates one characteristic value with BAPI_OBJCL_CHANGE. It builds the batch object key for MCH1 or MCHA so the BAPI finds the right classification.

**Sections:**

#### How to use it

**Body:** Fill in the material in its external format, the batch, the plant, the batch class and class type 023, the characteristic name and the new value. Pick the object table that matches your batch level and leave mode on READ for the first run. The report converts the material with CONVERSION_EXIT_MATN1_INPUT, builds the object key, reads all assigned values and prints them. Switch to CHANGE once the read shows the expected characteristics. The change block updates or appends the value, passes the full value tables back to BAPI_OBJCL_CHANGE with status 1 (released), and commits with BAPI_TRANSACTION_COMMIT only if RETURN has no E or A messages.

#### Where batch classification lives in ECC

**Body:** The batch level is set in OMCT and stored in TCUCH. With plant-level batches the batch master is MCHA and the classification object is MCHA with key MATNR (18) + WERKS (4) + CHARG (10). With material-level or client-level batches the master is MCH1 and the key is MATNR (18) + CHARG (10). Batch classes use class type 023. Values are stored in AUSP against an internal object number from INOB (INOB-CUOBJ, with OBTAB MCH1 or MCHA), which is why you call the BAPI with the readable key instead of writing AUSP. Check results in MSC3N on the Classification tab or in CL24N.

**Bullets:**

- MCHA key: MATNR + WERKS + CHARG
- MCH1 key: MATNR + CHARG
- Class type 023 for batch classes
- INOB maps the key to CUOBJ; AUSP holds the values

#### Version differences and gotchas

**Body:** BAPI_OBJCL_CHANGE replaces the whole allocation: any value you do not pass back is deleted, which is why the report reads first and sends every table back. Reference characteristics such as LOBM_VFDAT take their value from batch master fields, so change the shelf life expiration date with BAPI_BATCH_CHANGE or MSC2N, not through the class. If the batch is not yet allocated to the class, the read returns an error; create the allocation in MSC2N or with BAPI_OBJCL_CREATE first. VALUE_NEUTRAL holds the language-independent value, so the report sets it and VALUE_CHAR to the same text. If long material numbers are active, the 18-character offsets are wrong and you should use OBJECTKEY_LONG.

#### Batch reports and movement types

**Body:** Changing a characteristic value does not need a goods movement. Moving stock into a different batch is a transfer posting in MIGO, commonly movement type 309 (material to material, which also allows a batch change). For batch reporting, MB56 shows the batch where-used list, BMBC is the batch information cockpit for selection by characteristic values, and MCHB holds stock per batch and storage location. Use MSC3N to display one batch with its classification.

**Cta:** If you want planners and quality staff to ask for batch characteristics and where-used chains in plain English on your own servers, read-only, we can set that up on top of ECC.

**Faq:**

#### Which BAPI updates batch characteristics in SAP?

**Answer:** BAPI_OBJCL_CHANGE with OBJECTTABLE MCH1 or MCHA, class type 023 and the batch object key. Read the current values with BAPI_OBJCL_GETDETAIL first, change the row you need and pass all value tables back, then call BAPI_TRANSACTION_COMMIT. For batch master fields such as VFDAT use BAPI_BATCH_CHANGE.

#### What is the object key for a batch in BAPI_OBJCL_GETDETAIL?

**Answer:** For MCH1 it is the 18-character internal material number followed by the 10-character batch. For MCHA it is material, then 4-character plant, then batch. Build it with fixed offsets so trailing blanks in alphanumeric material numbers are kept.

#### What are the BAPI table structures for classification values?

**Answer:** BAPI1003_ALLOC_VALUES_CHAR for character values (CHARACT, VALUE_CHAR, VALUE_NEUTRAL), BAPI1003_ALLOC_VALUES_NUM for numeric and date values (CHARACT, VALUE_FROM, VALUE_TO, VALUE_RELATION) and BAPI1003_ALLOC_VALUES_CURR for currency values. Messages come back in BAPIRET2. Check them in SE11 for your release.

#### Why does BAPI_OBJCL_CHANGE delete my other values?

**Answer:** The BAPI treats the tables you pass as the complete new allocation. If you send only the changed characteristic, all others are removed. Always read the allocation with BAPI_OBJCL_GETDETAIL, modify the row in place, and pass the numeric, character and currency tables back together.

## Search terms

sap bapi update batch characteristics, bapi_objcl_change batch, bapi_objcl_getdetail batch class 023, sap batch classification abap, mch1 mcha object key, sap change batch characteristic value, sap bapi table structure, batch report in sap

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
