# SAP QM Sample Management Tables: QPRVK, QPRVP, QPRS and Related Objects

> Source: https://netray.co/tools/sap-ecc-qm-sample-management-tables-qprvk-qprs-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Tables, key fields, links and transactions behind SAP QM sample management: sample-drawing procedures, physical samples, sample drawings and how they connect to inspection lots and sampling procedures.

## Category

sap

## Erp

SAP ECC 6.0

## Audience

- SAP QM consultant
- ABAP developer
- Quality systems administrator

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Object

**Key:** object

**Type:** text

#### Type

**Key:** type

**Type:** text

#### Description

**Key:** desc

**Type:** text

#### Key / main fields

**Key:** keys

**Type:** text

#### Links to

**Key:** links

**Type:** text

#### Use

**Key:** use

**Type:** text

**Rows:**

**Object:** QPRVK

**Type:** Table

**Desc:** Sample-drawing procedure header

**Keys:** MANDT, PRZIEHVERF, VERSION; GUELTIGAB valid-from, QMASTAUTH auth group, KZQUIT confirmation required, GEBANZ drawing by number of containers

**Links:** QPRVKT, QPRVP, QALS, QPRS

**Use:** Find which procedures exist and whether confirmation of the drawing is required

**Object:** QPRVKT

**Type:** Table

**Desc:** Sample-drawing procedure texts

**Keys:** MANDT, PRZIEHVERF, VERSION, SPRACHE; KURZTEXT

**Links:** QPRVK

**Use:** Short text of a procedure in each language

**Object:** QPRVP

**Type:** Table

**Desc:** Sample-drawing procedure items

**Keys:** MANDT, PRZIEHVERF, VERSION, POSNRPRZV; STPRPLAN1/2 sampling scheme, AQLWERT1/2 AQL, PRANZ1/2 fixed number of samples, FAKTORPR1/2, ANZRUECKL reserve samples

**Links:** QPRVK, QDPK (sampling scheme), TQ42 (container)

**Use:** How many primary, pooled and reserve samples each item draws

**Object:** QPRS

**Type:** Table

**Desc:** Physical sample master record

**Keys:** MANDT, PHYNR; PRART sample type, PN_NR drawing number, MENGE/MEINH sample size, PLOS2 lot, MATNR, WERKS, CHARG, PNVER/PNVEV procedure and version, ABORT, ABDAT storage deadline, ENTDATUM/ENTZEIT drawing date and time

**Links:** QPRN, QALS, QPRVK, TQ40, TQ41

**Use:** The physical sample itself: what, how much, where it is stored and until when

**Object:** QPRN

**Type:** Table

**Desc:** Physical-sample drawing

**Keys:** MANDT, PN_NR; PLOS lot, MATNR, WERKS, CHARG, MBLNR/MJAHR/ZEILE, AUFNR, KZQUIT, FRGNA/FRGDT release

**Links:** QALS, QPRS, AUFK, MKPF

**Use:** One drawing event that produces one or more physical samples; confirmation and release data

**Object:** QALS

**Type:** Table

**Desc:** Inspection lot record

**Keys:** PRUEFLOS; PRBNAVERF and PRBNAVV sample-drawing procedure and version, STPRVER sampling procedure, STAT12 confirmation required, STAT13 inspection point type (3 = physical sample)

**Links:** QPRVK, QPRN, QPRS, QAMV

**Use:** Link from the lot to the sample-drawing procedure that the task list proposed

**Object:** QAPP

**Type:** Table

**Desc:** Inspection point

**Keys:** PRUEFLOS, VORGLFNR, PROBENR; PHYNR physical sample number

**Links:** QALS, QPRS, QASV

**Use:** In sample management, each physical sample becomes an inspection point for results recording

**Object:** QAMV

**Type:** Table

**Desc:** Characteristic specifications for inspection processing

**Keys:** PRUEFLOS, VORGLFNR, MERKNR; STICHPRVER sampling procedure

**Links:** QALS, QDSV, QASV

**Use:** Which sampling procedure each lot characteristic uses

**Object:** QASV

**Type:** Table

**Desc:** Sample specifications for inspection processing

**Keys:** PRUEFLOS, VORGLFNR, MERKNR, PROBENR; PRSTUFE inspection stage, PRSCHAERFE severity

**Links:** QALS, QDPS, QDEP

**Use:** Calculated sample size per characteristic and partial sample

**Object:** PLKO

**Type:** Table

**Desc:** Task list header

**Keys:** PLNTY, PLNNR, PLNAL; QPRZIEHVER and QVERSNPRZV sample-drawing procedure and version, QKZRASTER inspection points indicator

**Links:** QPRVK

**Use:** Where the sample-drawing procedure is assigned in the inspection plan header (QP01/QP02)

**Object:** PLMK

**Type:** Table

**Desc:** Inspection plan characteristics

**Keys:** PLNTY, PLNNR, PLNKN, MERKNR; STICHPRVER sampling procedure, PROBENR partial sample number

**Links:** QDSV, PLKO

**Use:** Characteristic-level sampling procedure and partial sample assignment

**Object:** QDSV

**Type:** Table

**Desc:** Sampling procedure

**Keys:** STICHPRVER; STICHPRART sampling type, BEWERTMOD valuation mode, STPRPLAN sampling scheme, AQLWERT, PROZUMF, KZRAST inspection points (incl. sample management)

**Links:** QDPK, QDEP, PLMK, QAMV

**Use:** Statistical sample size and valuation per characteristic (not the physical drawing)

**Object:** QDPK

**Type:** Table

**Desc:** Sampling scheme header

**Keys:** STPRPLAN

**Links:** QDSV, QPRVP

**Use:** Scheme (for example an AQL-based scheme) referenced by sampling procedures and drawing items

**Object:** QPV1 / QPV2 / QPV3

**Type:** Transaction

**Desc:** Create / change / display sample-drawing procedure

**Keys:** Procedure and version

**Links:** QPRVK, QPRVP

**Use:** Maintain procedures that drive physical-sample creation

**Object:** QPR1 / QPR2 / QPR3

**Type:** Transaction

**Desc:** Create / change / display physical sample

**Keys:** PHYNR

**Links:** QPRS

**Use:** Manual physical samples or correction of generated ones

**Object:** QPR4

**Type:** Transaction

**Desc:** Confirm physical-sample drawing

**Keys:** PN_NR

**Links:** QPRN, QALS

**Use:** Required before results recording when the procedure demands confirmation (KZQUIT)

**Object:** QDV1 / QDV2 / QDV3

**Type:** Transaction

**Desc:** Create / change / display sampling procedure

**Keys:** STICHPRVER

**Links:** QDSV

**Use:** Maintain statistical sampling procedures

**Object:** QA03 / QA32

**Type:** Transaction

**Desc:** Display inspection lot / inspection lot worklist

**Keys:** PRUEFLOS

**Links:** QALS

**Use:** See the sample tab of a lot and the drawing that belongs to it

**Notes:** Field names come from the ECC 6.0 data dictionary. Confirm in SE11 on your system, especially if you run industry add-ons (for example stability study fields in QPRS). Use SE16N with the key fields above to trace a lot to its samples: QALS-PRUEFLOS to QPRN-PLOS to QPRS-PN_NR to QAPP-PHYNR.

## Content

**Intro:** This reference maps the SAP ECC 6.0 QM sample management objects: the sample-drawing procedure (QPRVK, QPRVP), physical sample drawings (QPRN), physical samples (QPRS) and their links to inspection lots, inspection points and sampling procedures. It also lists the transactions that maintain each object.

**Sections:**

#### Sampling procedure vs sample-drawing procedure

**Body:** SAP QM has two similarly named objects that do different jobs. The sampling procedure (QDV1, table QDSV) is statistical: it decides how many units of each characteristic are inspected and how results are valued, and it is assigned per characteristic in PLMK. The sample-drawing procedure (QPV1, tables QPRVK and QPRVP) is physical: it decides how many physical samples are drawn from the lot, in which containers, and whether drawing must be confirmed. It is assigned in the inspection plan header and copied to QALS when the lot is created.

**Bullets:**

- Sample size per characteristic: QDSV, result in QASV.
- Number of physical samples: QPRVP, result in QPRN and QPRS.
- Results per physical sample: inspection points in QAPP with PHYNR.

#### Worked example: tracing a lot to its samples

**Body:** A goods receipt creates inspection lot 010000004711. In SE16N, QALS shows PRBNAVERF = RAW01 and PRBNAVV = 000001, the sample-drawing procedure from the plan. QPRN with PLOS = 010000004711 returns drawing number 000000001203, and QPRS with PN_NR = 000000001203 returns three physical samples with their sizes in MENGE and MEINH, storage location in ABORT and deadline in ABDAT. QAPP for the lot shows one inspection point per sample, with PHYNR filled, which is where results are recorded in QE51N.

#### How to use the table

**Body:** Search by table name, field name or transaction. The keys column lists the fields you need for joins and the most useful attributes; the links column names the parent or child tables. Export to Excel when you are writing a functional spec or an ABAP report so the developer has the joins in one place. When a field you need is not listed, open the table in SE11 rather than guessing: QPRS in particular carries many optional fields for stability studies and handling units.

#### Gotchas

**Body:** QALS does not have a field called PRZIEHVERF; the lot stores the procedure in PRBNAVERF and the version in PRBNAVV, both checked against QPRVK. QPRS stores the procedure as PNVER and PNVEV. If KZQUIT is set in the procedure, results recording is blocked until the drawing is confirmed with QPR4, which is a frequent cause of lots that seem stuck. Physical samples are only created automatically when the inspection type and plan are set up for sample management.

**Cta:** If you want quality engineers to ask SAP QM about lots, samples and results in plain English on your own servers, we can set that up over your ECC system.

**Faq:**

#### Which SAP table stores the sample-drawing procedure?

**Answer:** QPRVK holds the header of the sample-drawing procedure, keyed by PRZIEHVERF and VERSION, with texts in QPRVKT. The items, including sampling scheme, AQL and number of primary, pooled and reserve samples, are in QPRVP. Maintain them with QPV1, QPV2 and QPV3.

#### Where are physical samples stored in SAP QM?

**Answer:** Physical samples are in QPRS, keyed by PHYNR. Each sample references the drawing number PN_NR in QPRN, the inspection lot, material, plant and batch, the sample size in MENGE and MEINH, and the storage location and deadline. Display or change them with QPR3 and QPR2.

#### What is the difference between QDV1 and QPV1?

**Answer:** QDV1 creates a sampling procedure, which defines the statistical sample size and valuation per inspection characteristic. QPV1 creates a sample-drawing procedure, which defines how many physical samples are drawn from a lot and whether the drawing must be confirmed. A lot can use both at the same time.

#### How do I link an inspection lot to its physical samples?

**Answer:** Read QPRN where PLOS equals the lot number to get the drawing number PN_NR, then read QPRS where PN_NR matches to get each PHYNR. For results, read QAPP where PRUEFLOS equals the lot; the PHYNR field on each inspection point identifies the physical sample.

## Search terms

sap table for sample drawing procedure, sap qm sample table, sap qm sample drawing procedure, sap qm sample management, qprs table sap, qprvk table, sap physical sample table, sap qm sample

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
