# SAP HANA Revision and SPS Upgrade Checklist (hdblcm, step by step)

> Source: https://netray.co/tools/sap-hana-revision-sps-upgrade-checklist
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A step-by-step checklist for updating SAP HANA 2.0 to a new revision or SPS with hdblcm, including system replication, client updates and rollback.

## Category

sap

## Erp

SAP HANA

## Audience

- SAP Basis administrator
- HANA DBA

## Tool

**Kind:** checklist

**Groups:**

#### 1. Planning

**Items:**

**Text:** Choose the target revision using the SAP HANA 2.0 revision and maintenance strategy (SAP Note 2378962), preferring a maintenance revision of the current or next SPS

**Critical:** true

**Text:** Confirm the applications on this database (S/4HANA, BW, Business Suite, Business One) support the target SPS and revision in their notes and the Product Availability Matrix

**Critical:** true

**Text:** Confirm the operating system release and kernel are supported for the target revision (SAP Note 2235581)

**Critical:** true

Read the release note and known issues of the target revision

Confirm the update path from your current revision is supported directly

For system replication, plan the order: update the secondary first, then take over, then update the former primary

Agree downtime window, rollback criteria and sign-off with application owners

#### 2. Preparation

**Items:**

**Text:** Take a complete data backup of SYSTEMDB and every tenant and confirm it finished successfully

**Critical:** true

**Text:** Confirm log backups run and the last log backups are in the catalog

**Critical:** true

Record the current version: SELECT VERSION FROM M_DATABASE

Check free space in /hana/shared and the extraction directory for the new installation files

Download the SAR files for the database server and components from SAP Software Downloads or via Maintenance Planner

Extract the archives with SAPCAR -xvf and keep the SAP_HANA_DATABASE directory for hdblcm

Run hdblcm --action=check_installation to verify the current installation

Check that all services are active in M_SERVICES and that there are no unresolved critical alerts

Take a VM or storage snapshot as an extra rollback point if your platform supports it

Save copies of global.ini and other customised ini files

#### 3. Execution

**Items:**

**Text:** Stop or quiesce application servers if the update is not run as a near-zero downtime update

**Critical:** true

**Text:** Run hdblcm --action=update as root from the extracted SAP_HANA_DATABASE directory (or the resident hdblcm in /hana/shared/<SID>/hdblcm pointed at the new media)

**Critical:** true

Select all components that need the update: server, client, AFL, LCAPPS and any other installed components, matching the server revision

With system replication: update the secondary, confirm replication is active and in sync, perform a takeover, then update the former primary and re-register it as secondary

Monitor the hdblcm log in /var/tmp for errors during the update

Confirm the system and all tenants restart and accept connections

#### 4. Post-update checks

**Items:**

**Text:** Verify the new version with SELECT VERSION FROM M_DATABASE in SYSTEMDB and each tenant

**Critical:** true

Check traces and the alert log for errors after restart

Run the mini checks from the SQL statement collection (SAP Note 1969700) and compare with the pre-update run

Confirm the statistics service and scheduled jobs are running

**Text:** Update the SAP HANA client on every ABAP application server and other client hosts to a version supported with the new server

**Critical:** true

Check hdbuserstore LIST on application servers so secure store keys still point to the right host and port

Restart application servers that use the updated client and test logon and a few transactions

Update SAP Host Agent and check DBACOCKPIT or monitoring connections

Take a new complete data backup after the update

#### 5. Rollback and documentation

**Items:**

**Text:** Document the rollback route before starting: restore from the pre-update backup or snapshot, since a HANA update cannot be uninstalled in place

**Critical:** true

With system replication, keep the not-yet-updated side until the updated side is validated

Record old and new revisions, start and end times and any issues

Update the system landscape documentation and monitoring baselines

Schedule the next revision review against the maintenance strategy

**Scoring Note:** Critical items block go-ahead. Verify parameter names and hdblcm options in the SAP HANA Server Installation and Update Guide for your target SPS.

## Content

**Intro:** This checklist walks through updating SAP HANA 2.0 to a new revision or SPS with hdblcm, from choosing the target revision to updating clients on every application server. Tick it off in the browser and export it to PDF or Excel as a change record.

**Sections:**

#### How to use it

**Body:** Work through the groups in order and do not start execution until every critical item in planning and preparation is ticked. The planning group is where most failed updates start: an application that does not support the target SPS, or an operating system release that is not supported for it. Preparation proves you can go back, with verified backups and a recorded starting version. Execution covers both a standard update and the near-zero downtime approach with system replication. Post-update checks include the HANA client on application servers, which is the step most often forgotten and causes errors days later. Export the finished list as evidence for change management.

**Bullets:**

- Run it once on a sandbox or QA system before production
- Keep the hdblcm logs with the change record
- Record the revision in both SYSTEMDB and tenants

#### Revision strategy and compatibility

**Body:** SAP Note 2378962 describes the SAP HANA 2.0 revision and maintenance strategy: SPS releases bring features, and maintenance revisions within an SPS bring fixes. Production systems usually move to a maintenance revision of a recent SPS rather than the first revision of a new one. Before choosing, check application requirements: S/4HANA and BW releases have minimum and supported HANA SPS levels in their notes and in the Product Availability Matrix. SAP Note 2235581 lists the supported operating systems for each HANA release. An unsupported OS combination is a hard stop, and may mean an OS upgrade has to happen first, in its own window.

#### Running hdblcm

**Body:** The update runs as root with hdblcm, either from the extracted SAP_HANA_DATABASE directory of the new media or with the resident hdblcm in /hana/shared/<SID>/hdblcm. hdblcm --action=update starts the interactive update, where you choose the components to update; the graphical and web interfaces offer the same flow. Update server, client and add-on components (such as AFL and LCAPPS) together so their revisions match. With system replication, the secondary may run a higher revision than the primary, which is what allows the near-zero downtime sequence: update the secondary, take over, update the old primary and re-register it. Log files of each run are written under /var/tmp.

#### Gotchas after the update

**Body:** The HANA client on ABAP application servers is installed separately from the server, usually under /usr/sap/<SID>/hdbclient, and must be updated with its own installer from the client SAR. Check the secure store with hdbuserstore LIST. Run the mini checks from the SQL statement collection in SAP Note 1969700 before and after, so new warnings stand out. Take a fresh full backup because recovery across a revision change follows rules in the guide. A HANA update cannot be uninstalled: rollback means restore or snapshot, which is why preparation matters most.

**Cta:** If you want your Basis team to ask HANA about versions, alerts and update readiness in plain English on your own servers, we can set that up.

**Faq:**

#### What are the SAP HANA revision upgrade steps?

**Answer:** Choose the target revision per SAP Note 2378962, check application and OS support, take and verify a full backup, download and extract the SAR files, run hdblcm --action=check_installation, then hdblcm --action=update as root. Afterwards verify the version, run mini checks, update clients on application servers and take a new backup.

#### How do I upgrade the HANA client in SAP?

**Answer:** On each ABAP application server, extract the SAP HANA client SAR and run its installer (hdbinst or hdbsetup) into the client directory used by the system, typically /usr/sap/<SID>/hdbclient. Check hdbuserstore LIST still works and restart the application server so the work processes load the new client libraries.

#### Can I update HANA without downtime?

**Answer:** With system replication you can reduce downtime to a takeover: update the secondary first, take over, then update the former primary and register it as the new secondary. Applications see a short interruption during takeover. Without replication, a standard update needs a restart and application downtime.

#### Can I roll back a HANA revision update?

**Answer:** Not in place. hdblcm does not downgrade a database. Rollback means restoring the pre-update data backup and logs or reverting a storage or VM snapshot taken before the update. With system replication, keep the not-yet-updated side until the updated side is validated.

## Search terms

sap hana revision upgrade steps, sap hana sps upgrade step-by-step, hana upgrade step by step, sap hana db upgrade, hana client upgrade in sap, sap hana upgrade steps, hdblcm update

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
