# SAP IDoc Error Incident Ticket Template

> Source: https://netray.co/tools/sap-idoc-error-incident-ticket-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A structured ticket for IDoc failures: control record details, status history, root cause, fix and prevention actions.

## Category

sap

## Erp

SAP S/4HANA

## Audience

- SAP support analyst
- SAP integration developer
- Application manager

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Ticket number

**Key:** ticket

**Type:** text

**Default:** INC-20481

#### System and client

**Key:** system

**Type:** text

**Default:** S4P / 100

#### IDoc number

**Key:** idoc

**Type:** text

**Default:** 0000000004711234

#### Message type

**Key:** msg_type

**Type:** text

**Default:** ORDERS

#### Partner

**Key:** partner

**Type:** text

**Default:** EDI_CUST_1001

#### Direction

**Key:** direction

**Type:** select

**Options:**

- Inbound
- Outbound

**Default:** Inbound

#### Current status

**Key:** status

**Type:** select

**Options:**

- 51 Application document not posted
- 56 IDoc with errors added
- 02 Error passing data to port
- 29 Error in ALE service
- 37 Erroneous control record
- 64 Ready to be passed to application

**Default:** 51 Application document not posted

#### Error text

**Key:** error_text

**Type:** textarea

**Default:** Material EX-4420 is not defined in plant 1000 (message M3 305)

#### Business impact

**Key:** impact

**Type:** textarea

**Default:** 14 customer orders are not created. Shipments due tomorrow may be delayed.

#### Root cause

**Key:** root_cause

**Type:** textarea

**Default:** Material was extended to plant 1000 in the test client only and not in production.

#### Fix applied

**Key:** fix

**Type:** textarea

**Default:** Master data team extended the material. IDocs reprocessed in BD87 and posted with status 53.

#### Reported by

**Key:** reporter

**Type:** text

**Default:** Order desk

#### Date

**Key:** date

**Type:** date

**Default:** 2026-10-20

**Blocks:**

#### IDoc Incident Ticket {{ticket}}

**Body:** System: {{system}}
Reported by: {{reporter}}
Date: {{date}}

#### Control record details

**Table:**

**Columns:**

- Field
- Value

**Rows:**

**0:** IDoc number

**1:** {{idoc}}

**0:** Message type

**1:** {{msg_type}}

**0:** Partner

**1:** {{partner}}

**0:** Direction

**1:** {{direction}}

**0:** Current status

**1:** {{status}}

#### Error text

**Body:** {{error_text}}

#### Business impact

**Body:** {{impact}}

#### Root cause

**Body:** {{root_cause}}

#### Resolution

**Body:** {{fix}}

#### Prevention actions

**Table:**

**Columns:**

- Action
- Owner
- Due date
- Done

**Rows:**

**0:** Add master data check to transport checklist

**0:** Add alert for status 51 older than 1 hour

**0:** Update interface runbook

#### Closure

**Signatures:**

- Support analyst
- Interface owner

**Notes:** Status descriptions follow standard SAP IDoc statuses. Add your own category codes if your service desk requires them.

## Content

**Intro:** IDoc failures are routine, but undocumented ones come back. This ticket template captures the facts that matter for a repeat fix: the control record, the status, the exact error and the real root cause.

**Sections:**

#### How to fill the ticket

**Body:** Open the IDoc in WE02 or WE05 and copy the IDoc number, message type and partner from the control record. Take the status and the text of the latest status record, because the first error is often more informative than the last. Describe business impact in terms the order desk or plant would recognise, such as how many documents are blocked. Record the root cause separately from the fix: reprocessing an IDoc is a fix, but a missing master data extension is the cause. Export the finished ticket to PDF or Word and attach it to your service desk record.

**Bullets:**

- Copy the exact error text and message class
- Note how many IDocs share the same error
- Separate root cause from workaround

#### Reading the status

**Body:** The status tells you which stage failed. For inbound IDocs, 51 means the application rejected the data, 56 means the IDoc was received with errors in the control record or partner setup, and 64 means it is waiting for processing. For outbound IDocs, 02 means the data could not be handed to the port, 29 points to an ALE service error and 30 means ready for dispatch. Treat 51 as a data or configuration issue for the business, and 02 or 29 as a technical issue for Basis or the integration team.

#### Closing the loop

**Body:** A ticket is only useful if the prevention table is filled. Typical actions include a master data validation before go-live, an alert on aging IDocs in a failure status, or a clearer error message in a custom inbound function module. Review closed tickets monthly: if three tickets name the same root cause, the problem is the process, not the IDoc. Link the ticket to the interface ID from your inventory so patterns across interfaces become visible.

**Cta:** Netray can set up read-only monitoring over IDoc tables so repeated failures are grouped by root cause without manual searching.

**Faq:**

#### Which transaction shows IDoc errors?

**Answer:** WE02 and WE05 list IDocs with their status and status records. BD87 is the status monitor used to select failed IDocs and reprocess them in bulk. The underlying tables are EDIDC for control records and EDIDS for status records.

#### What does status 51 mean?

**Answer:** Status 51 means the inbound IDoc reached the application but the document could not be posted. The error text usually names a missing master record, a closed posting period or an authorization problem.

#### Can I reprocess IDocs without fixing the root cause?

**Answer:** You can, but the IDoc will fail again with the same error. Fix the data or configuration first, then reprocess using BD87 or program RBDMANI2 for failed inbound documents.

#### Should every IDoc failure get a ticket?

**Answer:** Not necessarily. Group failures with the same cause into a single ticket and list the count. Create separate tickets only when causes or owners differ.

## Search terms

idoc error ticket template, sap incident report template, idoc failure root cause analysis, idoc status 51 incident, sap interface incident form, we02 error documentation, sap support ticket template

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
