# SAP Item Category Determination Reference: TAN, TANN, TAD, TAS and More

> Source: https://netray.co/tools/sap-item-category-determination-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A lookup table of standard SAP SD item categories with delivery and billing relevance, plus how item category determination finds them.

## Category

sap

## Erp

SAP ECC / S/4HANA

## Audience

- SAP SD consultant
- SAP functional analyst

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Item cat

**Key:** code

**Type:** text

#### Description

**Key:** name

**Type:** text

#### Delivery relevant

**Key:** delivery

**Type:** text

#### Billing relevant

**Key:** billing

**Type:** text

#### Typical use

**Key:** use

**Type:** text

**Rows:**

#### Standard Item

**Code:** TAN

**Delivery:** Yes

**Billing:** Yes

**Use:** Normal stocked material in a standard order.

#### Free of Charge Item

**Code:** TANN

**Delivery:** Yes

**Billing:** No

**Use:** Goods delivered without charge, such as samples.

#### Service

**Code:** TAD

**Delivery:** No

**Billing:** Yes

**Use:** Service or non-stock item billed from the order.

#### Third-Party Item

**Code:** TAS

**Delivery:** No

**Billing:** Yes

**Use:** Vendor ships directly to the customer, a purchase requisition is created.

#### Text Item

**Code:** TATX

**Delivery:** No

**Billing:** No

**Use:** Free text line on the document, no quantity processing.

#### Configurable Material

**Code:** TAK

**Delivery:** Yes

**Billing:** Yes

**Use:** Configurable product with characteristics selected in the order.

#### Inquiry Item

**Code:** AFN

**Delivery:** No

**Billing:** No

**Use:** Line in an inquiry, no follow-on processing by itself.

#### Quotation Item

**Code:** AGN

**Delivery:** No

**Billing:** No

**Use:** Line in a quotation, copied into the order later.

#### Returns Item

**Code:** REN

**Delivery:** Yes

**Billing:** Yes

**Use:** Customer return, delivery in and credit memo out.

#### Credit Memo Item

**Code:** G2N

**Delivery:** No

**Billing:** Yes

**Use:** Line in a credit memo request.

#### Debit Memo Item

**Code:** L2N

**Delivery:** No

**Billing:** Yes

**Use:** Line in a debit memo request.

#### Consignment Fill-Up Item

**Code:** KEN

**Delivery:** Yes

**Billing:** No

**Use:** Stock moved to customer consignment, no invoice.

#### Consignment Issue Item

**Code:** KAN

**Delivery:** Yes

**Billing:** No

**Use:** Stock withdrawn from consignment by the customer.

#### Consignment Pick-Up Item

**Code:** KBN

**Delivery:** Yes

**Billing:** Yes

**Use:** Stock returned from consignment, quantity based.

#### Consignment Returns Item

**Code:** KRN

**Delivery:** Yes

**Billing:** No

**Use:** Return of consumed consignment stock.

**Notes:** Relevance flags shown reflect the typical standard configuration. Check the item category in VOV7 for the exact billing relevance indicator and the schedule line category assignment in your system.

## Content

**Intro:** Item categories control what happens to each line of a sales document: whether it is delivered, billed, priced, or sent to purchasing. This reference lists the standard categories and explains how SAP picks one.

**Sections:**

#### How to use this reference

**Body:** Search for an item category such as TAS or a word like service to find its typical delivery and billing relevance. Use it when you design a process, for example third-party order processing, and need to decide which item category fits. It is also useful when you debug why a line is not delivered or invoiced, because the answer is often a mismatch between the item category and the schedule line category.

**Bullets:**

- Filter by code or description
- Compare with the client's VOV7 entries
- Export to Excel for the blueprint
- Use it in test case design for each process

#### How item category determination works

**Body:** SAP looks up a table (T184) using four keys: the sales document type, the item category group from the material master sales org 2 view, the usage and the higher-level item category. The result is a default item category, and optionally a manual alternative the user may pick. For example, document type OR with item category group NORM normally finds TAN, while the same type with group DIEN finds TAD. The configuration transaction is OVLP.

**Bullets:**

- Sales document type comes from the header
- Item category group is set per material
- Usage field supports special cases such as free goods
- Higher-level item category supports bills of material

#### Item categories and schedule lines

**Body:** Each item category links to schedule line categories, and the schedule line category decides whether the line is relevant for availability check, requirements transfer and delivery. A third-party item such as TAS uses a schedule line category that creates a purchase requisition instead of an MRP requirement. If a line shows no delivery, check both the item category and the schedule line category before changing either.

#### Common mistakes

**Body:** Common issues include changing the item category group on a material without testing existing open orders, creating a Z item category when a different usage entry would work, and forgetting to maintain the manual item category entry that users need for free of charge lines. A last classic is copying a standard item category without updating the pricing and billing relevance flags to match the new process.

**Cta:** If you want an easy way to find every material in your system whose item category group will lead to a non-standard item category, we can build a read-only report agent over your SAP master data.

**Faq:**

#### Where do I maintain item categories in SAP?

**Answer:** Use transaction VOV7 for the item category definition and OVLP for the determination table. The path in SPRO is Sales and Distribution, Sales, Sales Documents, Sales Document Item. Schedule line categories are maintained next to it.

#### What is an item category group?

**Answer:** It is a field in the material master, in the sales org 2 view, that classifies the material for item category determination. Standard values include NORM for normal items and DIEN for services. It is one of the keys SAP uses to find the item category.

#### Why is my line not billing?

**Answer:** Check the billing relevance in the item category, the billing block on the header or item, the delivery status if billing is delivery related, and the billing date. An item category that is not billing relevant will never appear in the billing due list.

#### Can one document have different item categories?

**Answer:** Yes. Each line gets its own category based on the material and usage. A single order can hold a standard item, a text item, a service and a free of charge line, each handled differently for delivery and billing.

## Search terms

sap item category determination, sap item category TAN TAD TAS, VOV7 item categories, sap item category group MTPOS, sap third party item category TAS, sap free of charge item category TANN, OVLP item category determination, sap sd item category table

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
