# SAP Material Ledger Periodic Unit Price (Actual Costing) Calculator

> Source: https://netray.co/tools/sap-material-ledger-periodic-unit-price-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Compute the periodic unit price, ending inventory value and consumption value for a material in an actual costing period, and compare it with standard.

## Category

sap

## Erp

SAP S/4HANA

## Audience

- SAP FICO consultant
- Cost accountant
- Controller

## Tool

**Kind:** calculator

**Currency:** $

**Inputs:**

#### Opening stock quantity

**Key:** begin_qty

**Type:** number

**Default:** 5000

**Min:** 0

**Step:** 100

**Unit:** pcs

#### Opening stock value

**Key:** begin_value

**Type:** number

**Default:** 61000

**Min:** 0

**Step:** 500

**Unit:** currency

#### Receipts in period (quantity)

**Key:** rec_qty

**Type:** number

**Default:** 12000

**Min:** 0

**Step:** 100

**Unit:** pcs

#### Receipts in period (value at actual)

**Key:** rec_value

**Type:** number

**Default:** 156000

**Min:** 0

**Step:** 500

**Unit:** currency

#### Other price and exchange rate differences

**Key:** price_diff

**Type:** number

**Default:** 8400

**Step:** 100

**Unit:** currency

**Help:** Differences from invoices, freight or revaluation collected in the period. Can be negative.

#### Closing stock quantity

**Key:** end_qty

**Type:** number

**Default:** 6500

**Min:** 0

**Step:** 100

**Unit:** pcs

#### Standard price per piece

**Key:** std_price

**Type:** number

**Default:** 12.5

**Min:** 0

**Step:** 0.05

**Unit:** currency

**Outputs:**

#### Total available quantity

**Key:** total_qty

**Expr:** begin_qty + rec_qty

**Format:** number

#### Total available value

**Key:** total_value

**Expr:** begin_value + rec_value + price_diff

**Format:** currency

#### Periodic unit price

**Key:** pup

**Expr:** total_value / total_qty

**Format:** decimal

**Primary:** true

**Description:** Weighted average price for the period.

#### Closing stock value at PUP

**Key:** end_value

**Expr:** end_qty * pup

**Format:** currency

**Primary:** true

#### Consumed or sold value at PUP

**Key:** cons_value

**Expr:** (total_qty - end_qty) * pup

**Format:** currency

#### PUP vs standard price

**Key:** vs_std

**Expr:** (pup - std_price) / std_price * 100

**Format:** percent

#### Closing stock at standard

**Key:** std_value

**Expr:** end_qty * std_price

**Format:** currency

**Chart:**

#### Periodic unit price vs receipt value

**Type:** line

**X:** rec_value

**From:** 100000

**To:** 220000

**Steps:** 30

**Series:**

- pup

**Disclaimer:** Single level view. Multilevel price determination in SAP also rolls up actual prices of components into semi-finished and finished goods, and may include activity actuals and alternative valuation runs.

## Content

**Intro:** With the SAP Material Ledger and actual costing active, a material has a periodic unit price calculated at period close. It is the weighted average of opening stock, receipts and collected price differences, and it revalues consumption and ending inventory. This calculator reproduces the single-level arithmetic so you can understand a costing run result for a purchased material.

**Sections:**

#### How to use it

**Body:** Enter the opening stock quantity and value, the receipts quantity and value, and any additional price or exchange rate differences collected in the period. Add the closing stock quantity and the standard price. The result gives the periodic unit price, the value of closing stock at that price and the share of cost that goes to consumption. Sweep the receipt value on the chart to see how a more expensive delivery moves the price.

**Bullets:**

- Take opening values from the previous period's closing
- Include freight and import duty differences if they post as price differences
- Compare the result with the costing run log for the same material

#### The formula

**Body:** Periodic unit price = (opening stock value + receipts value + price differences) / (opening stock quantity + receipts quantity). Closing stock value is closing quantity times that price. The remaining value, total value minus closing value, flows to consumption, which means cost of goods sold or production order consumption is restated at actual. The material ledger costing run (CKMLCP) performs this per material and then runs multilevel settlement so the actual price flows up the bill of materials.

#### Reading the result

**Body:** If the periodic unit price is close to standard, the standard was a good estimate. A gap of several percent shows purchase price variance, exchange effects or freight that standard did not anticipate. A negative price difference input reduces the price, for example from a credit memo. Check that closing stock does not exceed total quantity, because that would signal timing issues in goods movements.

#### Common mistakes

**Body:** Leaving out price differences that arise after invoice verification, so the price looks lower than the true cost. Using quantity from a different plant than the value. Comparing a single-level result to the finished product after multilevel roll-up. Running the costing run before all goods movements are posted for the period.

**Cta:** If actual costing results are hard to explain to plant management, Netray can build a read-only assistant over your SAP data that breaks down price movements by material. Contact us to discuss.

**Faq:**

#### What is the difference between MAP and periodic unit price?

**Answer:** Moving average price changes with every goods receipt. Periodic unit price is calculated once at period end over all movements, so issues within the period are valued at the same final price, which stays consistent across the period.

#### Where is it calculated in SAP?

**Answer:** In the Material Ledger costing run, commonly run in the cockpit transaction CKMLCP, which determines the periodic unit price, performs multilevel settlement and then lets you post the closing.

#### Does this include activity costs?

**Answer:** No. This version is for a purchased material. For manufactured materials, SAP adds the actual cost of production orders, including activity actuals, and rolls costs up through the bill of materials.

#### Why does closing value differ from my report?

**Answer:** Differences usually come from timing of invoices, receipts posted late, price differences in a different currency type, or alternative valuation. Compare each input to the material price analysis document by document.

## Search terms

sap material ledger periodic unit price, sap actual costing calculator, periodic unit price formula, sap ml price determination, sap CKMLCP calculation, weighted average periodic cost, actual cost vs standard cost sap, material ledger price differences

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
