# SAP PM Database Tables Reference (AUFK, AFIH, QMEL, EQUI and More)

> Source: https://netray.co/tools/sap-pm-database-tables-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A searchable lookup of the core SAP PM tables, their key fields and what each is used for in reports and extracts.

## Category

sap

## Erp

SAP ECC / S/4HANA

## Audience

- SAP PM consultant
- ABAP developer
- Maintenance planner

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Table

**Key:** table

**Type:** text

#### Description

**Key:** description

**Type:** text

#### Key fields

**Key:** keys

**Type:** text

#### Area

**Key:** area

**Type:** text

#### Typical use

**Key:** use

**Type:** text

**Rows:**

**Table:** AUFK

**Description:** Order master data

**Keys:** AUFNR

**Area:** Orders

**Use:** Order type, plant, texts, status object number OBJNR

**Table:** AFIH

**Description:** Maintenance order header (PM specific)

**Keys:** AUFNR

**Area:** Orders

**Use:** Equipment, functional location, planner group, notification link

**Table:** AFKO

**Description:** Order header data (scheduling)

**Keys:** AUFNR

**Area:** Orders

**Use:** Basic and scheduled start and finish dates

**Table:** AFVC

**Description:** Operation within an order

**Keys:** AUFPL, APLZL

**Area:** Orders

**Use:** Operation number, work center, control key

**Table:** AFVV

**Description:** Quantities, values and dates of the operation

**Keys:** AUFPL, APLZL

**Area:** Orders

**Use:** Planned work and duration per operation

**Table:** AFRU

**Description:** Order completion confirmations

**Keys:** RUECK, RMZHL

**Area:** Orders

**Use:** Actual hours, confirmation text, final confirmation flag

**Table:** RESB

**Description:** Reservation and dependent requirements

**Keys:** RSNUM, RSPOS, RSART

**Area:** Orders

**Use:** Planned spare parts per order

**Table:** MSEG

**Description:** Document segment: material

**Keys:** MBLNR, MJAHR, ZEILE

**Area:** Orders

**Use:** Goods issues posted to orders

**Table:** T003O

**Description:** Order types

**Keys:** AUART

**Area:** Customizing

**Use:** Order type configuration

**Table:** QMEL

**Description:** Quality notification header

**Keys:** QMNUM

**Area:** Notifications

**Use:** Notification type, dates, reporter, priority

**Table:** QMIH

**Description:** Quality message: PM specific data

**Keys:** QMNUM

**Area:** Notifications

**Use:** Equipment, functional location, breakdown indicator

**Table:** QMFE

**Description:** Quality notification items

**Keys:** QMNUM, FENUM

**Area:** Notifications

**Use:** Damage and object part codes

**Table:** QMUR

**Description:** Quality notification causes

**Keys:** QMNUM, FENUM, URNUM

**Area:** Notifications

**Use:** Cause codes for failure analysis

**Table:** QMMA

**Description:** Quality notification activities

**Keys:** QMNUM, MANUM

**Area:** Notifications

**Use:** Activity codes recorded on a notification

**Table:** QMSM

**Description:** Quality notification tasks

**Keys:** QMNUM, MANUM

**Area:** Notifications

**Use:** Planned tasks on a notification

**Table:** EQUI

**Description:** Equipment master data

**Keys:** EQUNR

**Area:** Technical objects

**Use:** Equipment category, manufacturer, serial number

**Table:** EQUZ

**Description:** Equipment time segment

**Keys:** EQUNR, DATBI, EQLFN

**Area:** Technical objects

**Use:** Installation data and link to ILOA via ILOAN

**Table:** EQKT

**Description:** Equipment short texts

**Keys:** EQUNR, SPRAS

**Area:** Technical objects

**Use:** Equipment description by language

**Table:** IFLOT

**Description:** Functional location

**Keys:** TPLNR

**Area:** Technical objects

**Use:** Functional location master and category

**Table:** IFLOTX

**Description:** Functional location short texts

**Keys:** TPLNR, SPRAS

**Area:** Technical objects

**Use:** Functional location description by language

**Table:** ILOA

**Description:** PM object location and account assignment

**Keys:** ILOAN

**Area:** Technical objects

**Use:** Maintenance plant, cost center, location, TPLNR

**Table:** IHPA

**Description:** Plant maintenance partners

**Keys:** OBJNR, PARVW, COUNTER

**Area:** Technical objects

**Use:** Partner roles on orders and notifications

**Table:** T370

**Description:** Equipment categories

**Keys:** EQTYP

**Area:** Customizing

**Use:** Equipment category configuration

**Table:** T370F

**Description:** Functional location categories

**Keys:** FLTYP

**Area:** Customizing

**Use:** Functional location category configuration

**Table:** T024I

**Description:** Maintenance planner groups

**Keys:** IWERK, INGRP

**Area:** Customizing

**Use:** Planner group per planning plant

**Table:** MPLA

**Description:** Maintenance plan header

**Keys:** WARPL

**Area:** Preventive maintenance

**Use:** Plan category, strategy, scheduling parameters

**Table:** MPOS

**Description:** Maintenance item

**Keys:** WAPOS

**Area:** Preventive maintenance

**Use:** Link of plan to object and task list

**Table:** MHIS

**Description:** Maintenance plan history

**Keys:** WARPL, ZAEHL

**Area:** Preventive maintenance

**Use:** Planned and completion dates per call

**Table:** MHIO

**Description:** Maintenance call object

**Keys:** WARPL, ZAEHL

**Area:** Preventive maintenance

**Use:** Call objects generated from plan

**Table:** T351

**Description:** Maintenance strategies

**Keys:** STRAT

**Area:** Customizing

**Use:** Strategy definitions and scheduling indicators

**Table:** T351P

**Description:** Maintenance packages

**Keys:** STRAT, ZAEHL

**Area:** Customizing

**Use:** Packages (cycles) within a strategy

**Table:** PLKO

**Description:** Task list header

**Keys:** PLNTY, PLNNR, PLNAL

**Area:** Task lists

**Use:** Task list type, group and group counter

**Table:** PLPO

**Description:** Task list operation

**Keys:** PLNTY, PLNNR, PLNKN

**Area:** Task lists

**Use:** Operations, work center, text

**Table:** MAPL

**Description:** Assignment of task lists to materials

**Keys:** MATNR, WERKS, PLNTY, PLNNR

**Area:** Task lists

**Use:** Find the task list behind an object

**Table:** DIIMPT

**Description:** Measuring points

**Keys:** POINT

**Area:** Condition monitoring

**Use:** Measuring point master

**Table:** IMRG

**Description:** Measurement documents

**Keys:** MDOCM

**Area:** Condition monitoring

**Use:** Counter and measurement readings

**Table:** JEST

**Description:** Individual object status

**Keys:** OBJNR, STAT

**Area:** Status

**Use:** Active system and user statuses

**Table:** JSTO

**Description:** Status object information

**Keys:** OBJNR

**Area:** Status

**Use:** Status profile assigned to the object

**Table:** TJ02T

**Description:** System status texts

**Keys:** ISTAT, SPRAS

**Area:** Status

**Use:** Translate I-codes into REL, TECO, CLSD

**Table:** CRHD

**Description:** Work center header

**Keys:** OBJTY, OBJID

**Area:** Master data

**Use:** Work center, plant and category

**Table:** KLAH

**Description:** Class header data

**Keys:** CLINT

**Area:** Classification

**Use:** Class definition for equipment classes

**Table:** AUSP

**Description:** Characteristic values

**Keys:** OBJEK, ATINN, ATZHL

**Area:** Classification

**Use:** Classification values of technical objects

**Notes:** Table and field names are stable across ECC and S/4HANA for the on-premise PM data model, but verify in SE11 for your release. Several joins need OBJNR, ILOAN or AUFPL, which are internal numbers rather than the numbers users see.

## Content

**Intro:** When a maintenance KPI report, data migration or interface needs data that standard transactions do not show, you end up in SE16N or an ABAP select. This reference lists the tables that matter in SAP plant maintenance, with key fields and what each one holds.

**Sections:**

#### How to use the table list

**Body:** Type a table name, a topic such as notification or equipment, or a field name into the search box. Use the Area column to narrow to orders, notifications, technical objects, preventive maintenance, task lists, status or customizing. The Key fields column tells you how to join: for example orders and notifications connect through AFIH-QMNUM, and equipment connects to location data through EQUZ-ILOAN and ILOA-ILOAN. Export the filtered list to Excel to keep a project data dictionary.

**Bullets:**

- Search by table, description or typical use
- Filter to one area to see a single process end to end
- Export to Excel for migration mapping documents

#### The joins that cause the most confusion

**Body:** Four joins explain most PM reports. First, AUFK to AFIH by AUFNR gives order header plus PM data. Second, AFIH to AFVC goes through AFKO-AUFPL, because operations hang off the routing number and not the order number. Third, any status question goes through OBJNR into JEST, then TJ02T for the readable status code. Fourth, equipment and functional location both pull location and cost center from ILOA through ILOAN. Learn these four and the rest follows.

#### Reading and cautions

**Body:** Reading from tables is safe, writing to them is not. Never update PM tables directly with SE16N edit or custom SQL, because status, change documents and dependent objects will go out of sync. Use BAPIs or standard transactions for changes. Also remember that EQUZ and several others are time segmented, so filter DATBI to the open-ended date to get the current record. On S/4HANA, some legacy tables still exist but are served as compatibility views, so check the data model for your release.

**Cta:** If your maintenance team still builds PM reports by hand from these tables, we can set up a read-only natural language layer over your SAP data that shows the query it ran.

**Faq:**

#### Which table holds SAP maintenance order data?

**Answer:** The order master sits in AUFK, with PM specific fields such as equipment, functional location and planner group in AFIH. Dates are in AFKO, operations in AFVC, and confirmations in AFRU. Join them by AUFNR, and by AUFPL for operations.

#### How do I link a notification to its order?

**Answer:** The notification number is stored in the order header table AFIH in field QMNUM. Join QMEL or QMIH on QMNUM to get the notification data. In reverse, the order number is stored in the notification header as AUFNR.

#### Where is the current status of an order stored?

**Answer:** Status lives in JEST, keyed by the object number OBJNR from AUFK. Active rows have INACT blank. Translate the internal status code into text such as REL or TECO using TJ02T. User statuses use the status profile from JSTO and texts in TJ30T.

#### Does this list change in S/4HANA?

**Answer:** Core PM tables are largely retained in S/4HANA on-premise, though some fields and views have been simplified, and Fiori apps read from CDS views. Always confirm table structure in SE11 on your system before building a report or migration.

## Search terms

sap pm tables, sap pm table list, aufk afih table, qmel table sap, equi equz table, sap maintenance plan table mpla, sap pm tables for reports, sap functional location table iflot

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
