# Maintenance Wrench Time Loss Calculator for SAP PM Crews

> Source: https://netray.co/tools/sap-pm-wrench-time-loss-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Enter minutes lost per shift to permits, parts, travel, meetings and breaks. See wrench time percent and the yearly labor cost of the losses.

## Category

sap

## Erp

SAP PM

## Industry

Manufacturing

## Audience

- Maintenance planner
- SAP PM consultant
- Reliability engineer

## Tool

**Kind:** calculator

**Currency:** $

**Inputs:**

#### Shift length

**Key:** shift_hours

**Type:** number

**Default:** 8

**Min:** 4

**Max:** 12

**Step:** 0.5

**Unit:** hours

#### Breaks and shift handover

**Key:** breaks

**Type:** number

**Default:** 55

**Min:** 0

**Step:** 5

**Unit:** min

#### Waiting for permits, isolation, access

**Key:** permit_wait

**Type:** number

**Default:** 40

**Min:** 0

**Step:** 5

**Unit:** min

#### Waiting for parts and tools

**Key:** parts_wait

**Type:** number

**Default:** 45

**Min:** 0

**Step:** 5

**Unit:** min

#### Travel and walking

**Key:** travel

**Type:** number

**Default:** 50

**Min:** 0

**Step:** 5

**Unit:** min

#### Meetings, paperwork, confirmations

**Key:** admin

**Type:** number

**Default:** 35

**Min:** 0

**Step:** 5

**Unit:** min

#### Technicians

**Key:** techs

**Type:** number

**Default:** 15

**Min:** 1

**Step:** 1

**Unit:** people

#### Working days per year

**Key:** days

**Type:** number

**Default:** 230

**Min:** 100

**Max:** 365

**Step:** 5

**Unit:** days

#### Loaded labor rate

**Key:** rate

**Type:** number

**Default:** 48

**Min:** 0

**Step:** 1

**Unit:** per hour

**Outputs:**

#### Minutes lost per shift

**Key:** lost_min

**Expr:** breaks + permit_wait + parts_wait + travel + admin

**Format:** minutes

#### Hands-on minutes per shift

**Key:** wrench_min

**Expr:** max(0, shift_hours * 60 - lost_min)

**Format:** minutes

#### Wrench time

**Key:** wrench_pct

**Expr:** wrench_min / (shift_hours * 60) * 100

**Format:** percent

**Primary:** true

**Description:** Hands-on share of the paid shift.

#### Hours lost per year (non-break)

**Key:** lost_hours_year

**Expr:** (lost_min - breaks) / 60 * techs * days

**Format:** hours

**Description:** Excludes breaks, which are not recoverable.

#### Annual cost of recoverable loss

**Key:** cost_lost

**Expr:** lost_hours_year * rate

**Format:** currency

**Primary:** true

#### Hours gained per year from 10 points of wrench time

**Key:** gain_10

**Expr:** shift_hours * 0.1 * techs * days

**Format:** hours

**Chart:**

#### Wrench time vs parts waiting minutes

**Type:** line

**X:** parts_wait

**From:** 0

**To:** 120

**Steps:** 25

**Series:**

- wrench_pct

**Disclaimer:** Minute values are estimates. Validate with a work sampling study on your own crews before committing to targets.

## Content

**Intro:** Wrench time is the share of a technician's paid shift spent doing hands-on repair work. It is the fastest lever for clearing a backlog without hiring, and this calculator prices what each category of waiting costs you.

**Sections:**

#### How to use it

**Body:** Estimate average minutes lost per shift in each category. A work sampling study (random observations over a few weeks) is the gold standard; short of that, ask planners and supervisors, then check against time confirmations in IW41 or CATS. Enter crew size, working days and a loaded hourly rate. The result shows wrench time percent and what the recoverable losses cost per year.

**Bullets:**

- Treat breaks as non-recoverable and keep them separate.
- Permits and isolation losses point to LOTO and access planning.
- Parts waiting points to reservation, kitting and staging discipline.

#### The method

**Body:** Wrench time equals paid minutes minus all lost minutes, divided by paid minutes. Many plants studied in the literature sit well under 50 percent, and well planned operations reach the mid 50s to 60s. The annual loss excludes breaks: recoverable minutes times technicians times working days times the labor rate. The chart shows how waiting for parts alone moves the percentage.

#### Common mistakes and SAP notes

**Body:** Do not infer wrench time from confirmed actual work in SAP alone. Confirmations record time booked to orders, which includes travel and waiting that technicians book to the job, so it overstates hands-on time. Confirmations also miss unbooked time. Use sampling to calibrate, then use work center data (CR02) and order confirmations for trend monitoring.

**Bullets:**

- Avoid targeting 100 percent; 65 to 70 is a ceiling in most plants.
- Do not blame technicians for losses that planning creates.
- Measure before and after each improvement, such as staging parts.

**Cta:** If you would like a view of booked hours versus planned hours by planner group pulled from SAP, Netray can build that read-only on your infrastructure.

**Faq:**

#### What is wrench time in maintenance?

**Answer:** Wrench time is the percentage of a technician's paid time spent actively performing maintenance work, as opposed to traveling, waiting, getting permits, attending meetings or doing paperwork. It is usually measured by work sampling.

#### What is a realistic wrench time target?

**Answer:** Reactive plants often measure 25 to 35 percent, while plants with disciplined planning and scheduling can reach the 50s and low 60s. A target of 5 to 10 points improvement per year is typically more credible than a jump.

#### Can SAP PM calculate wrench time?

**Answer:** Not directly. SAP holds confirmations by order and operation, which show time booked, not hands-on time. Combine confirmations with a work sampling study to estimate real wrench time.

#### Why exclude breaks from the cost?

**Answer:** Breaks are part of paid time but are not recoverable through better planning. Excluding them keeps the cost figure to losses you can reduce through permits, staging, travel and admin improvements.