# SAP PP Business Blueprint Workshop Template

> Source: https://netray.co/tools/sap-pp-business-blueprint-workshop-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A workshop record for the SAP PP blueprint phase capturing scope, org structure, process flow, master data and open gaps.

## Category

sap

## Erp

SAP S/4HANA

## Audience

- SAP PP consultant
- Project manager
- Process owner

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Project

**Key:** project

**Type:** text

**Default:** S/4HANA conversion, Plant 1000

#### Workshop title

**Key:** workshop

**Type:** text

**Default:** PP: Discrete manufacturing and MRP

#### Date

**Key:** date

**Type:** date

**Default:** 2026-10-20

#### Facilitator

**Key:** facilitator

**Type:** text

**Default:** SAP PP lead

#### Attendees

**Key:** attendees

**Type:** textarea

**Default:** Plant manager, production planner, scheduler, engineering, quality, IT.

#### Manufacturing mode

**Key:** mode

**Type:** select

**Options:**

- Make-to-stock
- Make-to-order
- Engineer-to-order
- Repetitive
- Mixed

**Default:** Mixed

#### Org structure

**Key:** orgs

**Type:** textarea

**Default:** Company code 1000, plant 1000, storage locations 0001 and 0002, MRP area plant level.

#### Process in scope

**Key:** process

**Type:** textarea

**Default:** Demand planning input, MRP run, planned order conversion, order release, goods issue, confirmation, goods receipt, order settlement.

#### Gaps and risks

**Key:** gaps

**Type:** textarea

**Default:** Finite scheduling not in current scope. Subcontracting approach to be agreed with purchasing.

**Blocks:**

#### SAP PP Blueprint Workshop

**Body:** Project: {{project}}
Workshop: {{workshop}}
Date: {{date}}
Facilitator: {{facilitator}}

#### Attendees

**Body:** {{attendees}}

#### Manufacturing mode and organizational structure

**Body:** Mode: {{mode}}

{{orgs}}

#### Process scope

**Body:** {{process}}

#### Master data scope

**Table:**

**Columns:**

- Object
- Owner
- Source
- Cleansing needed

**Rows:**

**0:** Material master (MRP and work scheduling views)

**0:** Bills of material

**0:** Work centers

**0:** Routings

**0:** Production versions

#### Gaps and risks

**Body:** {{gaps}}

#### Decisions and sign-off

**Signatures:**

- Process owner
- SAP PP lead
- Project manager

**Notes:** A workshop record, not a full blueprint. Pair it with your SAP Activate or ASAP deliverables and fit-to-standard results.

## Content

**Intro:** Blueprint workshops produce decisions that are forgotten within weeks. A one-document record of scope, org structure and gaps keeps the PP design traceable.

**Sections:**

#### How to run the workshop

**Body:** Send the form ahead, ask the process owner to fill the manufacturing mode, org structure and process fields, then use the workshop to correct and complete. Capture gaps as they arise, not afterward. Export the result and circulate within a day.

#### What PP design needs to settle

**Body:** Decide the strategy for each product family, such as planning with or without final assembly, and which materials are produced to stock versus to order. Decide which production order type and confirmation approach suits each plant. Agree the master data owners and how routings and BOMs are loaded. These choices drive MRP behavior and costing later.

**Bullets:**

- Planning strategy per product family
- Order types and confirmation profile
- Master data ownership
- Interfaces to quality, procurement and MES

#### Common mistakes

**Body:** Skipping master data quality is the commonest. Another is designing for the ideal process, then finding shop floor practice differs. Include a planner or scheduler who actually runs the process in the room.

**Cta:** Netray can help analyze your existing ERP data to find master data problems before blueprint workshops start.

**Faq:**

#### Does S/4HANA change PP design?

**Answer:** It keeps the core PP concepts but adds options such as MRP Live and Advanced MRP, and simplifications in some areas. Check the current simplification list for your target release when you scope.

#### How long is a PP workshop?

**Answer:** Typically a few hours per topic, such as MRP, shop floor execution and costing. Split large scopes into several sessions rather than one long day.

#### Who should own the output?

**Answer:** The business process owner signs off decisions and the PP lead keeps the document under project change control.

#### Is this a replacement for a blueprint?

**Answer:** No. It is the record of a workshop. Combine the outputs into the formal blueprint or design documents your methodology requires.