# SAP PP Master Data Change Request Template

> Source: https://netray.co/tools/sap-pp-master-data-change-request-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A controlled change form for BOMs, routings, work centers and MRP data with impact assessment, approvals and rollback.

## Category

sap

## Erp

SAP S/4HANA

## Audience

- SAP PP consultant
- Master data steward
- Production planner

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Change request number

**Key:** cr_no

**Type:** text

**Default:** MDCR-2026-0142

#### Date raised

**Key:** date

**Type:** date

**Default:** 2026-10-20

#### Requester

**Key:** requester

**Type:** text

**Default:** Production planning

#### Object type

**Key:** object

**Type:** select

**Options:**

- Material master (MRP views)
- Bill of material
- Routing
- Work center
- Production version
- Other

**Default:** Bill of material

#### Material or object key

**Key:** material

**Type:** text

**Default:** FG-2210 plant 1000

#### Current value

**Key:** current

**Type:** textarea

**Default:** BOM FG-2210 component 100-455 quantity 2 EA, usage 1.

#### Proposed value

**Key:** proposed

**Type:** textarea

**Default:** Component 100-455 replaced by 100-470 quantity 2 EA, valid from 2026-11-15.

#### Reason for change

**Key:** reason

**Type:** textarea

**Default:** Supplier end of life notice on 100-455. Alternate qualified.

#### Open orders and planning impact

**Key:** impact

**Type:** textarea

**Default:** Two released production orders use old component. Planned orders after 15 Nov will pick up the new BOM after MRP run.

#### Rollback plan

**Key:** rollback

**Type:** textarea

**Default:** Reinstate old item with validity date change and re-run MRP for the material.

**Blocks:**

#### SAP PP Master Data Change Request

**Body:** Number: {{cr_no}}
Date: {{date}}
Requester: {{requester}}

#### What is changing

**Body:** Object type: {{object}}
Object: {{material}}

Current: {{current}}

Proposed: {{proposed}}

#### Reason

**Body:** {{reason}}

#### Impact on open orders and planning

**Body:** {{impact}}

#### Rollback

**Body:** {{rollback}}

#### Pre-release checks

**Table:**

**Columns:**

- Check
- Done
- By
- Date

**Rows:**

**0:** Tested in quality system

**0:** Costing run or cost estimate updated

**0:** Open orders reviewed

**0:** Routing and BOM consistent

**0:** Documents attached

#### Approvals

**Signatures:**

- Requester
- Engineering
- Production planning
- Quality
- Master data steward

**Notes:** Use for internal change control. If your change is a formal engineering change with change numbers, align this form with your ECN or ECO process. Template only.

## Content

**Intro:** Uncontrolled edits to a BOM or routing are a classic cause of wrong MRP and wrong product cost. This form puts current value, proposed value, impact and rollback on one page before anyone changes the data.

**Sections:**

#### How to use the form

**Body:** Raise one request per object and fill both current and proposed values with enough precision to be checked. Describe how open production orders and planned orders are affected, since orders already created from the old BOM keep their components until you regenerate or adjust them. Attach the exported document to the ticket in your service desk tool.

#### Why impact and rollback matter

**Body:** In SAP, BOM and routing changes can be date-effective through validity dates or change numbers. That helps, but released orders and costing do not automatically follow. A rollback line forces the author to think about what happens if the change is wrong, and a pre-release checklist covers costing updates and consistency between BOM and routing.

**Bullets:**

- Check validity dates
- Review open orders
- Update cost estimates when needed
- Re-run MRP for affected materials

#### Common mistakes

**Body:** Changing production data directly in the production client without a test is the biggest one. Another is forgetting that a BOM usage or status change hides the BOM from MRP. A third is skipping engineering approval for a component swap that changes form, fit or function.

**Cta:** Netray can add a read-only impact report that lists open orders and planned orders touched by a BOM change from your SAP data.

**Faq:**

#### Is this the same as an engineering change number?

**Answer:** No. SAP engineering change management with change numbers is a system feature. This form is the human approval record that can reference an ECN number where you use one.

#### Who should approve a routing change?

**Answer:** Typically production planning or industrial engineering owns the routing, with quality reviewing inspection steps and controlling aware of cost impact. Your own governance decides the final list.

#### How do I handle changes to released orders?

**Answer:** Decide per order whether to let it finish on the old structure, adjust components in CO02, or cancel and recreate. Document that decision in the impact section.

#### Should every change use this form?

**Answer:** Use it for changes that affect planning, costing or quality. Minor corrections like a description typo can follow a lighter process agreed with the master data team.