# SAP Production Order Types, Categories and Statuses Reference

> Source: https://netray.co/tools/sap-production-order-types-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A searchable lookup of SAP order categories, order type controls, system statuses, shop floor transactions and core order tables.

## Category

sap

## Erp

SAP S/4HANA

## Industry

Discrete Manufacturing

## Audience

- SAP PP consultant
- Production planner
- SAP key user

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Code / object

**Key:** code

**Type:** text

#### Kind

**Key:** kind

**Type:** text

#### Meaning

**Key:** meaning

**Type:** text

#### Practical note

**Key:** note

**Type:** text

**Rows:**

**Code:** 10

**Kind:** Order category

**Meaning:** Production order (discrete PP-SFC)

**Note:** Stored in AUFK-AUTYP. Most discrete manufacturing orders use this category.

**Code:** 40

**Kind:** Order category

**Meaning:** Process order (PP-PI)

**Note:** Used in process industries with master recipes instead of routings.

**Code:** 30

**Kind:** Order category

**Meaning:** Maintenance order (PM)

**Note:** Handled by plant maintenance, not shop floor control.

**Code:** 20

**Kind:** Order category

**Meaning:** Network (PS)

**Note:** Project system activities, not a PP order.

**Code:** 05

**Kind:** Order category

**Meaning:** Product cost collector

**Note:** Used with repetitive manufacturing and cost collection by period.

**Code:** 01

**Kind:** Order category

**Meaning:** Internal order (CO)

**Note:** Controlling order, no BOM or routing.

**Code:** PP01

**Kind:** Order type

**Meaning:** Standard delivered production order type

**Note:** Most projects copy it into customer types. Check your own system for the types in use.

**Code:** OPJH

**Kind:** Config transaction

**Meaning:** Define order type dependent parameters (PP)

**Note:** Controls status profile, settlement profile, costing variants and release behavior.

**Code:** Order type

**Kind:** Order type control

**Meaning:** Number range, status profile, settlement profile, cost variants, confirmation parameters

**Note:** Different order types let you separate normal, rework and subcontract style orders.

**Code:** CRTD

**Kind:** System status

**Meaning:** Created

**Note:** Order exists but is not released. No confirmations or goods issues yet.

**Code:** REL

**Kind:** System status

**Meaning:** Released

**Note:** Shop floor can confirm and post goods movements.

**Code:** PCNF

**Kind:** System status

**Meaning:** Partially confirmed

**Note:** At least one operation has a confirmation but not all.

**Code:** CNF

**Kind:** System status

**Meaning:** Confirmed

**Note:** All operations are fully confirmed.

**Code:** PDLV

**Kind:** System status

**Meaning:** Partially delivered

**Note:** Part of the order quantity received into stock.

**Code:** DLV

**Kind:** System status

**Meaning:** Delivered

**Note:** Order quantity received. Delivery complete is set by the system or user.

**Code:** GMPS

**Kind:** System status

**Meaning:** Goods movement posted

**Note:** Any goods movement exists on the order.

**Code:** MACM

**Kind:** System status

**Meaning:** Material committed

**Note:** Availability check confirmed components are covered.

**Code:** MSPT

**Kind:** System status

**Meaning:** Material shortage

**Note:** Availability check found missing components. Review in CO24.

**Code:** PRT

**Kind:** System status

**Meaning:** Printed

**Note:** Shop papers have been printed.

**Code:** SETC

**Kind:** System status

**Meaning:** Settlement rule created

**Note:** Required before settlement of variances.

**Code:** LKD

**Kind:** System status

**Meaning:** Locked

**Note:** Order is locked against further processing.

**Code:** TECO

**Kind:** System status

**Meaning:** Technically completed

**Note:** Open reservations and capacity requirements are removed. Costs still settle.

**Code:** CLSD

**Kind:** System status

**Meaning:** Closed

**Note:** Business completion. Normally follows settlement. Can be reversed with a reset.

**Code:** DLFL

**Kind:** System status

**Meaning:** Deletion flag

**Note:** Set for archiving. Order no longer shows in normal selections.

**Code:** DLID

**Kind:** System status

**Meaning:** Deletion indicator

**Note:** Order is marked for deletion pending archiving.

**Code:** CO01

**Kind:** Transaction

**Meaning:** Create production order

**Note:** Create with material, plant and order type.

**Code:** CO02

**Kind:** Transaction

**Meaning:** Change production order

**Note:** Release, reschedule, TECO and status changes.

**Code:** CO03

**Kind:** Transaction

**Meaning:** Display production order

**Note:** Read only view of header, operations and components.

**Code:** CO40

**Kind:** Transaction

**Meaning:** Convert planned orders to production orders

**Note:** Works for a selection of planned orders. See the planned order conversion checklist.

**Code:** CO11N

**Kind:** Transaction

**Meaning:** Enter time ticket

**Note:** Confirm an operation with quantities and times.

**Code:** CO15

**Kind:** Transaction

**Meaning:** Enter production order confirmation

**Note:** Confirm an operation or whole order, with backflush as configured.

**Code:** CO13

**Kind:** Transaction

**Meaning:** Cancel confirmation

**Note:** Reverses a posted confirmation and related goods movements.

**Code:** CO24

**Kind:** Transaction

**Meaning:** Missing parts info system

**Note:** Lists shortages per order and component.

**Code:** CO09

**Kind:** Transaction

**Meaning:** Availability overview

**Note:** Component availability for an order or material.

**Code:** COOIS

**Kind:** Transaction

**Meaning:** Order information system

**Note:** List and filter orders, operations and components.

**Code:** COHV

**Kind:** Transaction

**Meaning:** Mass processing of production orders

**Note:** Mass release, schedule, TECO and print in background.

**Code:** CO88

**Kind:** Transaction

**Meaning:** Collective settlement of production orders

**Note:** Settles variances to the target objects.

**Code:** AUFK

**Kind:** Table

**Meaning:** Order master data

**Note:** Common to all order categories. AUFNR is the order number.

**Code:** AFKO

**Kind:** Table

**Meaning:** Order header data PP orders

**Note:** Scheduling dates, task list link and BOM explosion data.

**Code:** AFPO

**Kind:** Table

**Meaning:** Order item

**Note:** Material, quantity and delivery data. Join to AFKO on AUFNR.

**Code:** AFVC

**Kind:** Table

**Meaning:** Operation within an order

**Note:** Work center, control key and operation number.

**Code:** AFVV

**Kind:** Table

**Meaning:** Quantities, dates and values for the operation

**Note:** Setup, machine and labor standard values.

**Code:** RESB

**Kind:** Table

**Meaning:** Reservation and dependent requirements

**Note:** Order components. Filter by AUFNR and BDART.

**Code:** AFRU

**Kind:** Table

**Meaning:** Order confirmations

**Note:** One row per confirmation. Reversals are flagged.

**Code:** JEST

**Kind:** Table

**Meaning:** Individual status per object

**Note:** Join with OBJNR from AUFK to read order statuses.

**Notes:** Standard values shown are from the delivered SAP data model. Order types, status profiles and number ranges are customer specific, so confirm against your own configuration.

## Content

**Intro:** This is a lookup for the codes you meet every day in SAP discrete manufacturing: order categories, order type controls, system statuses, shop floor transactions and the main order tables. Type in the search box to filter and export the list to Excel or PDF.

**Sections:**

#### How to use the reference

**Body:** Search for a status like TECO, a transaction like CO15 or a table like AFKO. The Kind column separates categories, statuses, transactions and tables so you can narrow the list. Use it as a quick check when reading an order in CO03, writing a COOIS variant or building a report that joins AUFK, AFKO, AFPO and AFVC. Export it to hand a new planner or key user a one page cheat sheet.

**Bullets:**

- Filter by Kind to see only statuses or only tables
- Use the practical note to decide the next action on an order
- Export to Excel to add your own Z order types

#### Order category versus order type

**Body:** Order category is a technical classification fixed by SAP: 10 for production orders, 40 for process orders, 30 for maintenance orders. Order type is a four character key you define under each category. It carries the number range, status profile, settlement profile and costing parameters. Many sites run one type for normal orders and others for rework, prototype or subcontracting so costs and statuses can be reported separately.

#### Reading statuses correctly

**Body:** System statuses are set by SAP as the order moves through its life: CRTD, REL, PCNF, CNF, DLV, TECO and CLSD. An order can hold several at once, for example REL, PCNF and GMPS. TECO is not the same as CLSD. TECO stops further planning and removes open reservations, while CLSD is the business close that normally follows variance settlement. Mixing these up is a frequent cause of open WIP at period end.

#### Common mistakes

**Body:** Deleting an order flag instead of using TECO leaves history unclear. Releasing orders without an availability check hides shortages that CO24 would have shown. Settling before all confirmations are posted pushes variances into the wrong period.

**Bullets:**

- Do not close orders with open goods issues
- Check the settlement rule exists before CO88
- Use COHV for mass TECO instead of manual change

**Cta:** If your planners keep exporting order lists from COOIS, we can build a read only assistant over your S/4HANA data that answers questions about order status and delays, with the query visible.

**Faq:**

#### What is the difference between TECO and CLSD in SAP?

**Answer:** TECO means technically complete: no more goods movements or confirmations are planned, open reservations and capacity requirements are removed, but costs can still be settled. CLSD is the business close, usually set after settlement. TECO can be reversed more easily than a close.

#### Where do I configure production order types?

**Answer:** Order type dependent parameters for PP orders are maintained in the Customizing transaction OPJH, along with related settings in the production planning IMG. Order types are tied to an order category, so a production order type uses category 10.

#### Which tables hold production order data?

**Answer:** AUFK holds the common order master, AFKO the PP header with dates, AFPO the item and material, AFVC the operations and RESB the components. Join AFKO to AFPO on AUFNR, and use OBJNR from AUFK to read statuses from JEST.

#### Can an order have more than one system status?

**Answer:** Yes. System statuses are cumulative. A running order can be REL, PCNF, GMPS and MACM at the same time. Selection screens like COOIS let you include or exclude combinations to find orders that need action.

## Search terms

sap production order types, sap order category 10 40, sap production order status list, sap crtd rel teco meaning, sap order type configuration opjh, sap production order tables afko afpo, sap co01 co02 co03 transactions, sap pp order status codes

---