# SAP QM Implementation and Go-Live Readiness Checklist

> Source: https://netray.co/tools/sap-qm-implementation-readiness-checklist
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Check master data, integration points, inspection setup and user readiness before cutting over SAP QM.

## Category

sap

## Erp

SAP S/4HANA

## Audience

- SAP QM consultant
- Project manager
- Quality manager

## Tool

**Kind:** checklist

**Scoring Note:** Items marked critical should be complete before cutover. A clean list means ready, not that the project is risk free.

**Groups:**

#### Scope and design

**Items:**

**Text:** Inspection types in scope are listed per plant (goods receipt, in-process, final, stock, return)

**Critical:** true

**Text:** Inspection lot origins and the triggering business events are confirmed with logistics

**Critical:** true

Materials in scope have the QM view maintained and the inspection setup flag decided

Sampling procedures and sampling schemes are agreed with quality engineering

Dynamic modification rules and quality levels are defined or consciously excluded

Quality notification types and catalogs for defects, causes and tasks are designed

Certificate requirements for customers and vendors are listed

Data ownership between QM, logistics, production and maintenance is documented

#### Master data

**Items:**

**Text:** Master inspection characteristics are created with units and decimals checked

**Critical:** true

Inspection methods and code groups are created and linked to characteristics

**Text:** Inspection plans are assigned to materials with valid dates and status released

**Critical:** true

Inspection equipment and calibration plans are in place for each gauge used

Vendor and customer quality settings and QM control keys are reviewed

Usage decision codes and code groups are mapped to stock postings

Authorisation roles for QM master data and result recording are tested

#### Integration

**Items:**

**Text:** Goods receipt triggers the inspection lot and the stock posting to quality inspection stock

**Critical:** true

**Text:** Usage decision posts stock to unrestricted, blocked or scrap as designed

**Critical:** true

Production order and process order inspections trigger at the right operations

Procurement quality assurance agreements and release strategies work with purchasing

Quality notifications integrate with maintenance and customer complaint flows

Batch management and batch determination rules behave with inspection results

Output forms such as inspection certificates and sample labels print correctly

Interfaces to LIMS, MES or measurement devices are tested end to end

#### Testing and training

**Items:**

**Text:** Test scripts cover results recording, defect recording and usage decision for each plan type

**Critical:** true

Negative cases are tested: reject lots, blocked stock, missing plan

Inspectors recorded sample results on real devices or terminals

Quality users trained on worklists and the exception process

Reports for lot status, rejection rate and open notifications are validated

Key users own the first-week issue log

#### Cutover and support

**Items:**

**Text:** Open inspection lots and open notifications are cleared or migrated by plan

**Critical:** true

**Text:** Stock in quality inspection is counted and reconciled before cutover

**Critical:** true

Fallback procedure exists if inspection lots do not generate

Hypercare roster covers QM, MM, PP and basis

Audit and regulatory records requirements are met for the migrated history

## Content

**Intro:** SAP QM projects fail on small gaps: a material without a QM view, a plan without a valid date, a usage decision that posts stock to the wrong place. This checklist lists the checks that catch those before go-live.

**Sections:**

#### How to use it

**Body:** Work through the groups with the quality lead, the SAP QM consultant and a key user from logistics. Mark each item as done only when someone has seen it work in the test system, not when it is configured. Items flagged critical should be closed before cutover. Export the result to share the status in the steering meeting.

#### What the groups cover

**Body:** Scope and design settles what is inspected and how. Master data covers characteristics, methods, plans and equipment. Integration tests the touchpoints with materials management, production and maintenance. Testing and training ensures people can record results and take decisions. Cutover and support deals with open lots and stock in quality inspection, which is where migrations commonly stumble.

#### SAP behaviours worth knowing

**Body:** Inspection lots are created from events such as goods receipt, production order release or goods issue, and the type is set by the inspection type assigned to the material. The usage decision (QA11) is what moves stock out of quality inspection. Blocked or unclear stock is the largest source of cutover disputes, so reconcile it early.

#### Common mistakes

**Body:** Testing only the good path, loading inspection plans late so that users record results against nothing, and under-planning training for inspectors who work on shop floor terminals rather than the SAP GUI. Also check authorisations carefully, because a missing role often looks like a configuration error.

**Cta:** We can support SAP QM projects with AI-assisted master data checks and reconciliation queries against your own system, with a person approving every change.

**Faq:**

#### Does this apply to S/4HANA and ECC?

**Answer:** Yes. The structure of QM master data, inspection lots and usage decisions is the same, though user interfaces and some transactions differ between releases.

#### Who should own the checklist?

**Answer:** The SAP QM lead owns it, with the quality manager signing off the business items and logistics owning integration checks.

#### How long does QM readiness take?

**Answer:** It depends on scope. Plan weeks for testing and master data for a single plant and longer for several plants with different inspection types.

#### Can I add my own items?

**Answer:** Yes, export the checklist and extend it with industry or customer specific requirements such as aerospace or medical record rules.