# SAP SD Pricing Condition Price Calculator

> Source: https://netray.co/tools/sap-sd-pricing-condition-price-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Walk a sales order line through a typical SD pricing procedure and see net value, invoice total and margin. Sweep the customer discount to see margin erosion.

## Category

sap

## Erp

SAP S/4HANA

## Audience

- SAP SD consultant
- Pricing analyst
- Sales operations

## Tool

**Kind:** calculator

**Currency:** $

**Inputs:**

#### List price (PR00)

**Key:** list_price

**Type:** number

**Default:** 1250

**Min:** 0

**Step:** 10

**Unit:** per pricing unit

**Help:** Amount on the PR00 condition record.

#### Pricing unit (per)

**Key:** price_unit

**Type:** number

**Default:** 1

**Min:** 1

**Step:** 1

**Unit:** units

**Help:** The 'per' value on the condition record, for example 1 or 100.

#### Order quantity

**Key:** qty

**Type:** number

**Default:** 200

**Min:** 0

**Step:** 10

**Unit:** units

#### Customer discount (K007)

**Key:** cust_disc

**Type:** slider

**Default:** 5

**Min:** 0

**Max:** 40

**Step:** 0.5

**Unit:** %

#### Material discount (K004)

**Key:** mat_disc

**Type:** slider

**Default:** 3

**Min:** 0

**Max:** 40

**Step:** 0.5

**Unit:** %

#### Header discount (HA00)

**Key:** hdr_disc

**Type:** slider

**Default:** 2

**Min:** 0

**Max:** 40

**Step:** 0.5

**Unit:** %

#### Discount base

**Key:** mode

**Type:** select

**Default:** 1

**Options:**

##### Sequential (each on running subtotal)

**Value:** 1

##### All on gross value

**Value:** 0

**Help:** Depends on the From/To steps and condition base in your pricing procedure.

#### Surcharge on discounted value

**Key:** sur_pct

**Type:** number

**Default:** 1.5

**Min:** 0

**Step:** 0.1

**Unit:** %

#### Freight (KF00, per order)

**Key:** freight

**Type:** number

**Default:** 350

**Min:** 0

**Step:** 10

#### Output tax rate

**Key:** tax_pct

**Type:** number

**Default:** 8

**Min:** 0

**Step:** 0.5

**Unit:** %

#### Standard cost per unit

**Key:** unit_cost

**Type:** number

**Default:** 780

**Min:** 0

**Step:** 10

**Outputs:**

#### Gross value

**Key:** gross

**Expr:** list_price / price_unit * qty

**Format:** currency

#### Total discount value

**Key:** disc_total

**Expr:** if(eq(mode,1), gross * (1 - (1 - cust_disc / 100) * (1 - mat_disc / 100) * (1 - hdr_disc / 100)), gross * (cust_disc + mat_disc + hdr_disc) / 100)

**Format:** currency

#### Effective discount

**Key:** eff_disc

**Expr:** if(gt(gross,0), disc_total / gross * 100, 0)

**Format:** percent

#### Surcharge

**Key:** surcharge

**Expr:** (gross - disc_total) * sur_pct / 100

**Format:** currency

#### Net value (NETWR)

**Key:** net_value

**Expr:** gross - disc_total + surcharge

**Format:** currency

**Primary:** true

**Description:** Net value of the item before freight and tax.

#### Invoice total incl. freight and tax

**Key:** invoice_total

**Expr:** (net_value + freight) * (1 + tax_pct / 100)

**Format:** currency

#### Gross margin on net value

**Key:** margin_pct

**Expr:** if(gt(net_value,0), (net_value - unit_cost * qty) / net_value * 100, 0)

**Format:** percent

**Primary:** true

**Chart:**

#### Margin and effective discount vs customer discount

**Type:** line

**X:** cust_disc

**From:** 0

**To:** 40

**Steps:** 40

**Series:**

- margin_pct
- eff_disc

**Disclaimer:** Simplified model of a pricing procedure. Your real procedure may use different from/to steps, rounding, scales and subtotals.

## Content

**Intro:** Pricing is the most configured part of SAP SD, and consultants constantly need a quick way to check what a procedure will do to a line before touching customizing. This calculator walks one order line through list price, stacked discounts, a surcharge, freight and tax.

**Sections:**

#### How to use the calculator

**Body:** Enter the PR00 amount and its pricing unit, the order quantity and the percentage discounts that your procedure would find through condition records. Choose whether discounts are taken sequentially on the running subtotal or all against the gross value. The outputs show the effective discount, net value, invoice total and margin against standard cost. Move the customer discount slider and watch the chart to see how fast margin erodes.

**Bullets:**

- Use the pricing unit for conditions maintained per 100 or per 1000
- Switch the discount base to compare two procedure designs
- Freight and tax sit after net value, as in most procedures

#### The logic behind it

**Body:** In a pricing procedure each step has a condition type, a from/to range, a subtotal and a calculation type. Percentage conditions are calculated on a base: either the gross subtotal or the running subtotal if the From column points at an earlier subtotal line. With sequential discounts of 5, 3 and 2 percent, the effective discount is 1 minus the product of the three remaining factors, slightly lower than the plain sum of 10 percent.

#### Worked example

**Body:** At 1250 per unit for 200 units the gross value is 250,000. Sequential discounts of 5, 3 and 2 percent give an effective discount of about 9.7 percent, so the discounted value is near 225,700. A 1.5 percent surcharge lifts the net value to about 229,100. Against a standard cost of 780 the margin is close to 31.9 percent. Raise the customer discount to 15 percent and the margin drops sharply.

#### Common mistakes

**Body:** The usual errors are mixing up the condition base, forgetting that a condition record can have a scale, and ignoring the pricing unit. Also remember that real procedures exclude some conditions from the net value, such as statistical conditions, and that rounding rules and currency decimals can change the cents.

**Bullets:**

- Check the From column of every discount step
- Check condition exclusion groups
- Do not compare margin against moving average price if the company uses standard price

**Cta:** If your pricing procedure has grown to dozens of steps and nobody can explain a price, we can build a read-only assistant over your condition tables that explains how any item price was reached.

**Faq:**

#### Does this replace transaction VK13 or the pricing analysis?

**Answer:** No. It is a design and teaching aid. The pricing analysis in the sales order shows exactly what the system did for one item, and VK13 displays condition records. Use this tool to test ideas on paper before configuring.

#### Why is the effective discount lower than the sum?

**Answer:** When discounts are taken sequentially, each one applies to an already reduced value. Three discounts of 5, 3 and 2 percent multiply to 90.3 percent remaining, a 9.7 percent total discount, not 10 percent.

#### Can it model scales or minimum prices?

**Answer:** Not directly. Run it once per scale level and compare. Minimum price conditions can be tested by checking whether the net value per unit falls below your floor value.

#### Which currency does it use?

**Answer:** The page shows dollars for display only. The arithmetic is currency neutral, so enter amounts in your document currency.

## Search terms

sap sd pricing calculator, sap pricing procedure simulation, sap condition type discount calculation, sap pr00 k007 calculation, sap net value calculation, sap sd price waterfall, sap pricing what if

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
