# SAP SUM 2.0 Roadmap Phases Reference

> Source: https://netray.co/tools/sap-sum-roadmap-phases-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

The SUM 2.0 roadmap steps and key phases for upgrades, S/4HANA conversions and DMO, with uptime or downtime, what happens, typical issues and where the logs are.

## Category

sap

## Erp

SAP S/4HANA (on-premise)

## Audience

- SAP Basis administrator
- Upgrade lead
- ABAP developer

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Roadmap step

**Key:** step

**Type:** text

#### Phase or sub-step

**Key:** phase

**Type:** text

#### Uptime or downtime

**Key:** time

**Type:** text

#### What happens

**Key:** what

**Type:** text

#### Typical issue

**Key:** issue

**Type:** text

#### Where to look

**Key:** logs

**Type:** text

**Rows:**

#### Before start

**Phase:** Start SUM UI

**Time:** Uptime

**What:** Unpack SUM, register it with SAP Host Agent, open https://<host>:1129/lmsl/sumabap/<SID>/doc/sluigui

**Issue:** Host Agent too old or wrong user; port 1129 blocked

**Logs:** SAP Host Agent logs, SUM/abap/log

#### Extraction

**Phase:** Stack file and archives

**Time:** Uptime

**What:** Reads stack.xml from Maintenance Planner, checks and extracts the archives into the download directory

**Issue:** Missing or wrong archives for the target stack

**Logs:** SUM/abap/log

#### Extraction

**Phase:** Tool and key checks

**Time:** Uptime

**What:** Asks for passwords, checks kernel, SPAM/SAINT and SUM requirements, SAP Note implementation prompts

**Issue:** Required SAP Notes not implemented

**Logs:** SUM/abap/log

#### Configuration

**Phase:** Parameters

**Time:** Uptime

**What:** Choose scenario options, number of R3trans, R3load and background processes, shadow instance number and ports

**Issue:** Too many processes for the host, port conflicts with the shadow instance

**Logs:** SUM/abap/log

#### Configuration

**Phase:** Add-ons and transports

**Time:** Uptime

**What:** Decide add-on handling and include customer transports or SPDD/SPAU adjustment transports from a previous run

**Issue:** Add-on without a target version blocks the run

**Logs:** SUM/abap/log

#### Checks

**Phase:** Prerequisite checks

**Time:** Uptime

**What:** Free space, database version, open updates, open transports and other prerequisites

**Issue:** Tablespace or disk space too small

**Logs:** SUM/abap/log

#### Preprocessing

**Phase:** Shadow instance

**Time:** Uptime

**What:** Creates the shadow instance and imports the new repository into shadow tables (EU_IMPORT phases)

**Issue:** Long runtime on large repositories, shadow cannot start

**Logs:** SUM/abap/log, SUM/abap/tmp

#### Preprocessing

**Phase:** Development lock

**Time:** Uptime

**What:** Development environment is locked; no more transports or repository changes

**Issue:** Developers lose work if not told in time

**Logs:** SUM/abap/log

#### Preprocessing

**Phase:** SPDD adjustment (before ACT_UPG)

**Time:** Uptime

**What:** Adjust modified DDIC objects with SPDD in the shadow instance

**Issue:** Skipped SPDD lets SAP standard overwrite modified tables or fields

**Logs:** SPDD in shadow instance

#### Preprocessing

**Phase:** ACT_UPG

**Time:** Uptime

**What:** Activates the new dictionary objects in the shadow

**Issue:** Activation errors for customer DDIC objects

**Logs:** SUM/abap/log (activation logs)

#### Preprocessing

**Phase:** DMO uptime migration (DMO only)

**Time:** Uptime

**What:** With downtime-optimized options, part of the table migration runs in uptime

**Issue:** Changes during uptime must be replayed later

**Logs:** SUM/abap/log, migration logs

#### Preprocessing

**Phase:** DOWNCONF_DTTRANS

**Time:** Uptime, end of

**What:** Asks you to confirm entering downtime

**Issue:** Users and jobs still active; lock users and suspend jobs first

**Logs:** SUM UI dialog

#### Execution

**Phase:** Switch

**Time:** Downtime

**What:** Shadow repository is switched into the system, kernel switch (KX_SWITCH)

**Issue:** Kernel or profile problems after the switch

**Logs:** SUM/abap/log

#### Execution

**Phase:** DMO migration (DMO only)

**Time:** Downtime

**What:** R3load export and import of tables to the target database, e.g. SAP HANA

**Issue:** Runtime longer than benchmarked; table splitting tuning

**Logs:** SUM/abap/log, migration logs in SUM/abap/migrate_*

#### Execution

**Phase:** PARCONV_UPG

**Time:** Downtime

**What:** Table conversions and structure changes in parallel

**Issue:** Conversion errors on large or modified tables

**Logs:** SUM/abap/log (PARCONV logs)

#### Execution

**Phase:** TABIM_UPG

**Time:** Downtime

**What:** Imports remaining table contents

**Issue:** Import errors from customer table content

**Logs:** SUM/abap/log

#### Execution

**Phase:** XPRAS_AIMMRG

**Time:** Downtime

**What:** Runs XPRAs and after-import methods

**Issue:** XPRA errors that need SAP Notes; long runtimes on application data

**Logs:** SUM/abap/log (XPRA logs)

#### Postprocessing

**Phase:** SPAU and SPAU_ENH

**Time:** After downtime (system can be released per guide)

**What:** Adjust modified repository objects and enhancements

**Issue:** Large SPAU backlog; Note corrections to reset or reapply

**Logs:** SPAU, SPAU_ENH

#### Postprocessing

**Phase:** SGEN and cleanup

**Time:** Uptime

**What:** Load generation with SGEN, removal of shadow and temporary objects

**Issue:** Slow first use if SGEN is skipped

**Logs:** SGEN job logs

#### Postprocessing

**Phase:** Evaluation

**Time:** Uptime

**What:** Runtime analysis UPGANA.XML, feedback form, SUM Utilities

**Issue:** Not saving the analysis for the next system run

**Logs:** SUM/abap/doc/analysis

**Notes:** Phase names follow SUM 2.0 for ABAP. Exact phase lists change with each SUM 2.0 SP: always read the SUM guide and the central SAP Note for your SUM SP. With near-Zero Downtime Maintenance (nZDM) or downtime-optimized DMO, more work moves into uptime.

## Content

**Intro:** This reference walks through the SUM 2.0 roadmap from Extraction to Postprocessing, with the phases that matter most for Basis teams, where downtime starts and where to read the logs. It covers ABAP upgrades, S/4HANA conversions and Database Migration Option runs.

**Sections:**

#### How to use it

**Body:** Read the table top to bottom as a runbook outline, or search for a phase name you see in the SUM UI or a log, such as ACT_UPG or PARCONV_UPG. The uptime or downtime column tells you whether users can still work. Downtime begins after you confirm it at the end of Preprocessing (DOWNCONF_DTTRANS), so lock users, suspend background jobs and stop interfaces just before that. The typical issue column lists what usually stops a run at that point, so you can prepare for it in the sandbox.

#### The six roadmap steps

**Body:** SUM 2.0 runs six steps. Extraction reads the stack.xml from Maintenance Planner and extracts archives. Configuration sets process counts, the shadow instance and options such as nZDM or downtime-optimized DMO. Checks verifies space, versions and prerequisites. Preprocessing builds the shadow instance, imports the new repository, locks development, asks for SPDD and activates DDIC in ACT_UPG, all in uptime. Execution is the downtime: the switch, kernel switch, DMO migration if used, table conversion, imports and XPRAs. Postprocessing covers SPAU, SGEN, cleanup and evaluation.

**Bullets:**

- SPDD happens in Preprocessing, in the shadow instance.
- SPAU happens in Postprocessing, after the switch.
- DMO adds the R3load migration in Execution.

#### Worked example: planning the weekend

**Body:** On the sandbox run, save UPGANA.XML from SUM/abap/doc/analysis. It shows the runtime of every phase. Use the downtime phases (switch, migration, PARCONV_UPG, TABIM_UPG, XPRAS_AIMMRG) to estimate the production window, adding time for SPAU, tests and a rollback point. For DMO, run the benchmarking tool first to tune R3load process counts and table splitting. Feed the SPDD and SPAU transports from development into later runs through the Configuration step so you do not adjust the same objects again in QA and production.

#### Common mistakes

**Body:** Teams skip SPDD and lose modified table fields, or tell developers about the development lock too late. Shadow instance ports clash with other instances on the host. Too many R3load or background processes overload the database host and make downtime longer, not shorter. People read only the SUM UI message and not the detailed log in SUM/abap/log, where the real error is. And they do not keep UPGANA.XML from the previous run, so the production plan rests on guesses.

**Cta:** If you want your Basis team to search SUM logs and runbooks in plain English on your own servers, Netray can set up a private AI assistant for that.

**Faq:**

#### What are the SUM upgrade steps in SAP Basis?

**Answer:** SUM 2.0 runs six roadmap steps: Extraction, Configuration, Checks, Preprocessing, Execution and Postprocessing. Preprocessing builds the shadow instance and runs in uptime; Execution is the downtime with the switch, conversions and XPRAs; Postprocessing covers SPAU, SGEN and evaluation.

#### When does downtime start in SUM?

**Answer:** At the end of Preprocessing SUM asks you to confirm the start of downtime (phase DOWNCONF_DTTRANS). Before confirming, lock users, suspend background jobs and stop interfaces. With nZDM or downtime-optimized DMO, more work happens in uptime and the downtime part is shorter.

#### When do I do SPDD and SPAU?

**Answer:** SPDD comes in Preprocessing, in the shadow instance before ACT_UPG activates the dictionary. SPAU and SPAU_ENH come in Postprocessing, after the switch. Collect both in transports and feed them into later runs so the next systems pick them up automatically.

#### Where are the SUM logs?

**Answer:** Most logs are in SUM/abap/log, with temporary and working files in SUM/abap/tmp. The runtime analysis UPGANA.XML is in SUM/abap/doc/analysis. Read the detailed log named in the SUM UI error message, not just the summary.

## Search terms

sum upgrade in sap basis, sap sum upgrade steps, sum upgrade in sap step by step, sap basis sum upgrade, sap spau upgrade guide, sum 2.0 phases, sum dmo phases downtime

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
