# SAP Variant Configuration Transaction Codes: CT04, CL02, CU41, CS01 and More

> Source: https://netray.co/tools/sap-variant-configuration-transaction-codes
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A searchable list of the SAP transaction codes variant configuration and PLM consultants use daily, grouped by characteristic, class, dependency, BOM, routing and change work.

## Category

sap

## Erp

SAP S/4HANA

## Audience

- SAP VC consultant
- SAP PLM consultant
- Master data lead

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### T-code

**Key:** tcode

**Type:** text

#### Area

**Key:** area

**Type:** text

#### What it does

**Key:** purpose

**Type:** text

#### When you use it

**Key:** when

**Type:** text

**Rows:**

**Tcode:** CT04

**Area:** Characteristics

**Purpose:** Create, change or display a characteristic

**When:** Defining value lists, formats and the values of a new option

**Tcode:** CT05

**Area:** Characteristics

**Purpose:** Display characteristic

**When:** Read-only look at a characteristic and its values

**Tcode:** CT06

**Area:** Characteristics

**Purpose:** Where-used list for characteristics

**When:** Impact analysis before changing or deleting a characteristic

**Tcode:** CL01

**Area:** Classes

**Purpose:** Create class

**When:** Setting up a new class under a class type

**Tcode:** CL02

**Area:** Classes

**Purpose:** Change class

**When:** Adding characteristics or changing the class description

**Tcode:** CL03

**Area:** Classes

**Purpose:** Display class

**When:** Checking which characteristics a class carries

**Tcode:** CL24N

**Area:** Classes

**Purpose:** Assign objects to a class

**When:** Assigning many materials to one class

**Tcode:** CL20N

**Area:** Classes

**Purpose:** Assign classes to an object

**When:** Classifying one material and entering its values

**Tcode:** CL30N

**Area:** Classes

**Purpose:** Find objects in classes

**When:** Finding materials that match characteristic values

**Tcode:** CU01

**Area:** Dependencies

**Purpose:** Create dependency

**When:** Writing a precondition, selection condition or procedure

**Tcode:** CU02

**Area:** Dependencies

**Purpose:** Change dependency

**When:** Editing dependency source code or status

**Tcode:** CU03

**Area:** Dependencies

**Purpose:** Display dependency

**When:** Reviewing logic without changing it

**Tcode:** CU41

**Area:** Configuration profile

**Purpose:** Create configuration profile

**When:** Making a material configurable and assigning its dependencies

**Tcode:** CU42

**Area:** Configuration profile

**Purpose:** Change configuration profile

**When:** Adjusting the class or BOM explosion settings in the profile

**Tcode:** CU43

**Area:** Configuration profile

**Purpose:** Display configuration profile

**When:** Checking a profile before testing

**Tcode:** CU50

**Area:** Testing

**Purpose:** Configuration simulation

**When:** Testing a model without creating a sales order

**Tcode:** CU60

**Area:** Variant tables

**Purpose:** Maintain variant tables

**When:** Building lookup tables used by procedures and constraints

**Tcode:** MM01

**Area:** Material

**Purpose:** Create material

**When:** Creating the configurable material or a stock variant

**Tcode:** MM02

**Area:** Material

**Purpose:** Change material

**When:** Setting the configurable flag or MRP settings

**Tcode:** CS01

**Area:** BOM

**Purpose:** Create material BOM

**When:** Building the super BOM for the configurable material

**Tcode:** CS02

**Area:** BOM

**Purpose:** Change material BOM

**When:** Adding items or selection conditions

**Tcode:** CS03

**Area:** BOM

**Purpose:** Display material BOM

**When:** Reading the BOM without risk of editing

**Tcode:** CS11

**Area:** BOM

**Purpose:** Display BOM level by level

**When:** Checking each level of a multilevel structure

**Tcode:** CS12

**Area:** BOM

**Purpose:** Multilevel BOM explosion

**When:** Seeing the whole structure at once

**Tcode:** CS13

**Area:** BOM

**Purpose:** Summarized BOM

**When:** Quantity totals per component across levels

**Tcode:** CS15

**Area:** BOM

**Purpose:** BOM where-used for a material

**When:** Finding every BOM that uses a component

**Tcode:** CS20

**Area:** BOM

**Purpose:** Mass change of BOMs

**When:** Replacing a component across many BOMs

**Tcode:** CA01

**Area:** Routing

**Purpose:** Create routing

**When:** Defining operations for a material

**Tcode:** CA02

**Area:** Routing

**Purpose:** Change routing

**When:** Adding operations or attaching dependencies

**Tcode:** CA03

**Area:** Routing

**Purpose:** Display routing

**When:** Reviewing the operation sequence

**Tcode:** CC01

**Area:** Change management

**Purpose:** Create change number

**When:** Opening an engineering change before touching released data

**Tcode:** CC02

**Area:** Change management

**Purpose:** Change a change number

**When:** Updating validity date, status or object types

**Tcode:** CC03

**Area:** Change management

**Purpose:** Display change number

**When:** Checking what a change number controls

**Tcode:** CV01N

**Area:** Documents

**Purpose:** Create document info record

**When:** Registering a drawing or specification

**Tcode:** CV02N

**Area:** Documents

**Purpose:** Change document info record

**When:** Uploading a new file or setting status

**Tcode:** CV03N

**Area:** Documents

**Purpose:** Display document info record

**When:** Reading document data and originals

**Tcode:** VA01

**Area:** Sales

**Purpose:** Create sales order

**When:** Entering a configured item for an end-to-end test

**Tcode:** VA02

**Area:** Sales

**Purpose:** Change sales order

**When:** Reconfiguring an item and watching BOM change

**Tcode:** VA03

**Area:** Sales

**Purpose:** Display sales order

**When:** Viewing the configuration saved on an order item

**Tcode:** IB01

**Area:** Installed base

**Purpose:** Create installed base

**When:** Tracking the as-built configuration of a delivered product

**Notes:** Transaction codes exist in both SAP ERP and S/4HANA, but some are replaced by Fiori apps in S/4HANA and advanced variant configuration uses additional tools. Check availability and authorization objects on your system.

## Content

**Intro:** This list puts the transactions you need for SAP variant configuration and PLM work in one place, from CT04 for characteristics to CS01 for the super BOM and CC01 for engineering changes. Search by code, area or task and export the result for your team.

**Sections:**

#### How to use the list

**Body:** Use the search box to find a code, or type a task such as where-used or mass change. The Area column groups codes by the object they work on, so you can read the list in build order: characteristics, classes, dependencies, configuration profile, BOM, routing, then test with CU50 and VA01. The When column describes the typical moment you would reach for each code, which helps newer consultants who know the object but not the code. Export to Excel to share a one-page cheat sheet with the project team.

#### The build order that avoids rework

**Body:** Most VC models are built in a repeatable sequence. First create characteristics and classes, then assign values, then write dependencies, then create the configurable material and its configuration profile, and only then build the super BOM and routing with selection conditions. Test in CU50 before any sales order is created. Many problems come from building the BOM first and discovering later that a characteristic name or value changed. Because the characteristic and its values are referenced everywhere, treat CT04 as the foundation and change it carefully.

**Bullets:**

- Characteristics and classes first
- Dependencies next
- Configurable material and profile
- Super BOM and routing last
- Test in CU50 before VA01

#### Mistakes and S/4HANA notes

**Body:** A common mistake is editing a released characteristic or dependency without a change number where change management is active, which blocks or silently skips history. Another is testing only in CU50 and skipping VA01, so sales order pricing and MRP behavior is never seen. In S/4HANA, many master data tasks have Fiori equivalents, and advanced variant configuration replaces parts of the classic toolset. This list covers the classic GUI codes that most projects still use, so confirm the target release before you build training material around them.

**Cta:** If your team spends hours explaining where a configured value came from, Netray can help build a read-only assistant over your SAP data that answers those questions with the query shown.

**Faq:**

#### Which transaction creates a characteristic in SAP?

**Answer:** CT04 is used to create, change and display characteristics. You define the data type, length, whether it is single or multi valued, and the allowed values. CT05 is the display-only version, and CT06 shows where a characteristic is used.

#### What does CU41 do?

**Answer:** CU41 creates a configuration profile for a configurable material. The profile links the material to its classes and to dependencies such as procedures and constraints, and controls how the BOM is exploded during configuration. CU42 changes it and CU43 displays it.

#### How do I test a configurable material without a sales order?

**Answer:** Use CU50, the configuration simulation. Enter the material, choose characteristic values, and see the result, including the exploded BOM and any dependency errors. It does not create an order, so it is the fastest way to test model changes.

#### Which transaction creates an engineering change number?

**Answer:** CC01 creates a change number, with CC02 to change and CC03 to display it. The change number carries a validity date and optionally a release key, and it can control which object types, such as BOMs and routings, change under it.

## Search terms

sap vc transaction codes, sap variant configuration t codes, sap ct04 transaction, sap cu41 configuration profile, sap cl02 class transaction, sap cs01 bom transaction, sap cc01 change number, sap plm tcodes list

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
