# SAP WM and EWM Transaction Codes Reference

> Source: https://netray.co/tools/sap-wm-ewm-transaction-codes-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Look up the transaction code you need for transfer orders, bins, stock reports, physical inventory and the EWM monitor.

## Category

sap

## Erp

SAP ECC / S/4HANA

## Audience

- SAP WM consultant
- SAP EWM consultant
- Warehouse supervisor

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### System

**Key:** system

**Type:** text

#### Transaction

**Key:** tcode

**Type:** text

#### Area

**Key:** area

**Type:** select

**Options:**

- Transfer orders
- Bins
- Stock reports
- Physical inventory
- Inbound
- Outbound
- Master data
- Monitoring
- Waves

#### What it is used for

**Key:** purpose

**Type:** text

**Rows:**

**System:** WM

**Tcode:** LT01

**Area:** Transfer orders

**Purpose:** Create a transfer order manually

**System:** WM

**Tcode:** LT03

**Area:** Transfer orders

**Purpose:** Create a transfer order for a requirement

**System:** WM

**Tcode:** LT04

**Area:** Transfer orders

**Purpose:** Create a transfer order from a transfer requirement

**System:** WM

**Tcode:** LT12

**Area:** Transfer orders

**Purpose:** Confirm a transfer order (single document)

**System:** WM

**Tcode:** LB01

**Area:** Transfer orders

**Purpose:** Create a transfer requirement manually

**System:** WM

**Tcode:** LB03

**Area:** Transfer orders

**Purpose:** Display a transfer requirement

**System:** WM

**Tcode:** LS01N

**Area:** Bins

**Purpose:** Create a storage bin

**System:** WM

**Tcode:** LS02N

**Area:** Bins

**Purpose:** Change a storage bin (blocks, capacity, section)

**System:** WM

**Tcode:** LS03N

**Area:** Bins

**Purpose:** Display a storage bin

**System:** WM

**Tcode:** LX01

**Area:** Stock reports

**Purpose:** List empty storage bins

**System:** WM

**Tcode:** LX02

**Area:** Stock reports

**Purpose:** Stock per storage bin

**System:** WM

**Tcode:** LX03

**Area:** Stock reports

**Purpose:** Bin status report (occupancy by storage type)

**System:** WM

**Tcode:** LX10

**Area:** Stock reports

**Purpose:** Warehouse stock overview by material

**System:** WM

**Tcode:** LS24

**Area:** Stock reports

**Purpose:** Display stock per material in the warehouse

**System:** WM

**Tcode:** LI01N

**Area:** Physical inventory

**Purpose:** Create a physical inventory document (WM)

**System:** WM

**Tcode:** LI11N

**Area:** Physical inventory

**Purpose:** Enter inventory counts

**System:** WM

**Tcode:** LI20

**Area:** Physical inventory

**Purpose:** Clear inventory differences

**System:** WM

**Tcode:** LICC

**Area:** Physical inventory

**Purpose:** Cycle counting: create physical inventory documents

**System:** EWM

**Tcode:** /SCWM/MON

**Area:** Monitoring

**Purpose:** Warehouse management monitor (documents, stock, tasks, resources)

**System:** EWM

**Tcode:** /SCWM/PRDI

**Area:** Inbound

**Purpose:** Process inbound delivery

**System:** EWM

**Tcode:** /SCWM/PRDO

**Area:** Outbound

**Purpose:** Process outbound delivery order

**System:** EWM

**Tcode:** /SCWM/RFUI

**Area:** Transfer orders

**Purpose:** Radio frequency user interface for mobile devices

**System:** EWM

**Tcode:** /SCWM/LS01

**Area:** Bins

**Purpose:** Create a storage bin

**System:** EWM

**Tcode:** /SCWM/LS02

**Area:** Bins

**Purpose:** Change a storage bin

**System:** EWM

**Tcode:** /SCWM/LS03

**Area:** Bins

**Purpose:** Display a storage bin

**System:** EWM

**Tcode:** /SCWM/MAT1

**Area:** Master data

**Purpose:** Maintain warehouse product

**System:** EWM

**Tcode:** /SCWM/PACKSPEC

**Area:** Master data

**Purpose:** Maintain packaging specification

**System:** EWM

**Tcode:** /SCWM/WAVE

**Area:** Waves

**Purpose:** Wave processing

**System:** EWM

**Tcode:** /SCWM/TU

**Area:** Inbound

**Purpose:** Maintain transportation unit (trucks and containers at the yard or door)

**Notes:** Descriptions are short paraphrases and menu texts differ slightly between releases. Some WM transactions are not available in S/4HANA systems where WM is replaced by embedded EWM, so check the simplification list for your release.

## Content

**Intro:** SAP warehouse work lives in a small set of transaction codes. This list covers the ones consultants and supervisors use daily in classic WM and in EWM, grouped by area so you can find the right one quickly.

**Sections:**

#### How to use the list

**Body:** Search by code or by task, for example bin, cycle count or wave. Filter the Area column to see only physical inventory or only stock reports. Export the filtered list to Excel or PDF to build a role-based cheat sheet for your warehouse team or for authorisation design, where each transaction maps to an authorisation object and a business role.

#### WM and EWM transactions compared

**Body:** In WM, most work flows through transfer orders created with LT01 or generated from deliveries, then confirmed with LT12 or by RF. In EWM, work is driven by warehouse tasks and warehouse orders, and the central transaction for supervisors is the warehouse monitor, /SCWM/MON. Where WM has separate reports for bins, stock and open orders, the EWM monitor presents them as nodes in one tree, which is faster for investigation but needs time to configure per user.

**Bullets:**

- WM stock reports: LX02, LX03, LX10, LS24
- EWM stock view: /SCWM/MON, stock and bin nodes
- WM count entry: LI11N
- EWM mobile work: /SCWM/RFUI

#### Common mistakes

**Body:** Teams often give warehouse operators access to LX02 for convenience and then discover it runs slowly on large warehouses without filters. Another frequent error is granting create access to bins (LS01N) widely, which lets users create bins outside the storage type design. Authorisation should follow your bin and storage type governance, and master data creation should be limited to a small group.

**Cta:** If your team spends time hunting through transactions to answer simple stock questions, we can discuss a read-only assistant that answers them from your SAP data without giving users broader access.

**Faq:**

#### What is the difference between LT01 and LT03?

**Answer:** LT01 creates a transfer order by entering material, quantity, source and destination by hand. LT03 creates a transfer order for a requirement, so the system proposes bins using the putaway or removal strategies configured for the storage types.

#### Which transaction shows stock per bin in WM?

**Answer:** LX02 shows stock per storage bin and is the most used. LX03 gives a bin status report with occupancy by storage type. LS24 shows stock per material, which is the better starting point when you know the material.

#### What replaces the WM stock reports in EWM?

**Answer:** The warehouse monitor, /SCWM/MON, with its stock and bin nodes. You choose the warehouse number, drill into the node and filter by product, bin or handling unit. You can save layouts and variants for different roles.

#### Do these transactions work in S/4HANA?

**Answer:** Classic WM transactions are available in S/4HANA for the compatibility period, while embedded EWM transactions under /SCWM/ are the strategic path. Check the simplification list and the product availability matrix for your exact release.

## Search terms

sap wm transaction codes, sap ewm transaction codes, LT01 transaction, LX02 stock per bin, /SCWM/MON, sap warehouse tcode list, sap physical inventory wm tcodes, sap ewm t codes list

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
