# Saudi Arabia SABER Product Certificate and Shipment Certificate Checklist

> Source: https://netray.co/tools/saudi-saber-product-and-shipment-certificate-checklist
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A checklist covering the SABER steps manufacturers and importers follow for regulated products entering Saudi Arabia.

## Category

regional

## Region

Saudi Arabia

## Audience

- Export manager
- Product compliance
- Logistics coordinator

## Tool

**Kind:** checklist

**Scoring Note:** Rules differ by product and change over time. Use this list to organise the work and confirm each point with your Saudi importer, the conformity assessment body and the current SASO and ZATCA customs guidance.

**Groups:**

#### 1. Scope and product

**Items:**

**Text:** Confirm the HS code for each product and whether it is covered by a Saudi technical regulation

**Critical:** true

**Text:** Identify the applicable technical regulation or standard for the product

**Critical:** true

Check whether the product needs a Gulf conformity mark or other GCC marking

Record the exact model, rating and variant list that will be covered

Confirm the product labelling and language requirements

Check whether the product is restricted or needs a separate permit

#### 2. Registration

**Items:**

**Text:** Ensure the Saudi importer has an active commercial registration

**Critical:** true

**Text:** Register the importer and your company as required on the SABER platform

**Critical:** true

Assign a named person who will manage SABER requests

Record the company and user credentials in a controlled place

Agree who is responsible for each document between exporter, importer and broker

#### 3. Product certificate of conformity

**Items:**

**Text:** Select the conformity assessment body or route used for the product type

**Critical:** true

**Text:** Prepare test reports from a competent laboratory for the applicable regulation

**Critical:** true

Collect technical files, user manuals and labels for review

Submit the product certificate request through SABER

**Text:** Check that the certificate lists the correct models and HS code

**Critical:** true

Note the certificate validity date and set a renewal reminder

Keep a copy of the certificate with the item record

#### 4. Shipment certificate

**Items:**

**Text:** Create the shipment request in SABER for each consignment

**Critical:** true

**Text:** Match invoice quantities, models and values to the shipment request

**Critical:** true

Attach the commercial invoice, packing list and bill of lading as requested

Confirm the shipment certificate is issued before the goods are loaded or arrive

Check that the certificate number appears on the customs entry

Keep the shipment certificate with the shipping file

#### 5. Customs and follow-up

**Items:**

Confirm the incoterm and who pays duty, VAT and inspection charges

Check that the invoice shows the data required for Saudi customs

Prepare the certificate of origin if required

**Text:** Brief the clearing agent on the SABER numbers before arrival

**Critical:** true

Record any rejection reason and fix the root cause in the product file

Review the whole process after the first three shipments

## Content

**Intro:** Many regulated products shipped to Saudi Arabia need a conformity certificate arranged through the SABER platform. This checklist lays out the preparation steps so your export desk and your importer are not discovering missing documents at the port.

**Sections:**

#### How to use the checklist

**Body:** Work through the five groups in order and tick off each item for a single product family. Items marked critical block the shipment if they are missed. Use the checklist as the shared plan with your Saudi importer, because the registration, the certificate request and the shipment request involve both parties. Export the completed list as a PDF to keep with the export file. Repeat the exercise for each new product family, since certificates are tied to the models and HS codes they cover.

#### The two certificates

**Body:** In the SABER process, a product certificate of conformity shows that the product family complies with the applicable Saudi technical regulation, and a shipment certificate of conformity is obtained for each consignment and ties the actual goods on the invoice to that product certificate. Customs relies on the shipment certificate at clearance. The product certificate is usually reusable until it expires, while the shipment certificate is created per shipment. Both must match the invoice descriptions, models and quantities, so data quality in your item master and invoice template matters.

**Bullets:**

- Product certificate: per product or model family, with a validity period.
- Shipment certificate: per consignment, requested through the platform.
- Mismatched model names are a common cause of rejection.

#### Common mistakes and ERP notes

**Body:** Frequent problems are a wrong or too generic HS code, invoices that use internal part numbers instead of the certified model names, certificates that expire between order and shipment, and nobody owning the SABER account. In your ERP, add a customer-specific description or cross-reference so the Saudi invoice shows the certified model. Store the certificate number and expiry on the item or the customer-item record and block shipping when it has lapsed. Treat the first shipment of each product as a pilot to learn how the process behaves for your goods.

**Cta:** If you ship to Saudi Arabia from an ERP that does not hold certificate numbers and expiry dates, we can help add those controls to the item and shipment flow.

**Faq:**

#### What is SABER?

**Answer:** SABER is the Saudi online platform used to apply for conformity documents for regulated products entering the Kingdom. Importers and exporters use it to request product certificates and shipment certificates before customs clearance.

#### Do all products need a shipment certificate?

**Answer:** No. The requirement applies to products covered by Saudi technical regulations and to the categories the authority has placed under the scheme. Check your HS codes against the current scope and confirm with your importer.

#### Who applies for the certificates, exporter or importer?

**Answer:** It depends on the document and the platform roles. Typically the manufacturer or exporter handles the product certificate with a conformity assessment body, while the Saudi importer manages shipment requests. Agree this in writing before the first order.

#### What happens if the certificate details do not match the invoice?

**Answer:** Customs may hold or reject the shipment, and you may need to amend the invoice or request a new shipment certificate. This is why model names, quantities and HS codes must match across every document.

## Search terms

SABER Saudi Arabia checklist, SABER PCoC SCoC, SASO conformity certificate export, Saudi product certificate of conformity, shipment certificate of conformity SABER, export to Saudi Arabia documents, Saudi import requirements electronics

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
