# Sheet Metal Cost Estimator: Part Costing Sheet

> Source: https://netray.co/tools/sheet-metal-part-cost-estimator-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Estimate the cost and quote price of a laser cut and bent sheet metal part from blank size, material, cutting, bending, finishing and margin.

## Category

manufacturing

## Industry

Sheet Metal Fabrication

## Audience

- Fabrication estimator
- Buyer
- Job shop owner

## Tool

**Kind:** calculator

**Currency:** $

**Inputs:**

#### Blank length

**Key:** length

**Type:** number

**Default:** 400

**Min:** 1

**Step:** 10

**Unit:** mm

#### Blank width

**Key:** width

**Type:** number

**Default:** 250

**Min:** 1

**Step:** 10

**Unit:** mm

#### Thickness

**Key:** thick

**Type:** number

**Default:** 2

**Min:** 0.3

**Max:** 25

**Step:** 0.1

**Unit:** mm

#### Material

**Key:** density

**Type:** select

**Default:** 7.85

**Options:**

##### Mild steel (7.85 g/cm3)

**Value:** 7.85

##### Stainless steel 304 (8.0 g/cm3)

**Value:** 8

##### Aluminium 5052 (2.68 g/cm3)

**Value:** 2.68

##### Aluminium 6061 (2.70 g/cm3)

**Value:** 2.7

#### Sheet price

**Key:** price_kg

**Type:** number

**Default:** 1.1

**Min:** 0

**Step:** 0.05

**Unit:** per kg

**Help:** Your purchase price for the sheet, delivered.

#### Nesting utilization

**Key:** util

**Type:** slider

**Default:** 75

**Min:** 40

**Max:** 95

**Step:** 1

**Unit:** %

**Help:** Share of the sheet that ends up in parts. Scrap and skeleton are paid for.

#### Cut length per part

**Key:** cut_len

**Type:** number

**Default:** 1700

**Min:** 0

**Step:** 50

**Unit:** mm

**Help:** Total perimeter including holes.

#### Pierces per part

**Key:** pierces

**Type:** number

**Default:** 12

**Min:** 0

**Step:** 1

#### Average cutting speed

**Key:** cut_speed

**Type:** number

**Default:** 3

**Min:** 0.1

**Step:** 0.1

**Unit:** m/min

#### Laser cost rate

**Key:** laser_rate

**Type:** number

**Default:** 90

**Min:** 0

**Step:** 5

**Unit:** per hour

#### Bends per part

**Key:** bends

**Type:** number

**Default:** 4

**Min:** 0

**Step:** 1

#### Time per bend

**Key:** bend_sec

**Type:** number

**Default:** 25

**Min:** 0

**Step:** 1

**Unit:** sec

#### Press brake cost rate

**Key:** press_rate

**Type:** number

**Default:** 60

**Min:** 0

**Step:** 5

**Unit:** per hour

#### Finishing cost

**Key:** finish

**Type:** number

**Default:** 0.6

**Min:** 0

**Step:** 0.05

**Unit:** per sq ft

**Help:** Powder coat, plating or paint, per sq ft of surface (both sides).

#### Setup and programming per batch

**Key:** setup

**Type:** number

**Default:** 120

**Min:** 0

**Step:** 10

#### Batch quantity

**Key:** qty

**Type:** slider

**Default:** 100

**Min:** 1

**Max:** 1000

**Step:** 1

**Unit:** parts

#### Gross margin on price

**Key:** margin

**Type:** slider

**Default:** 25

**Min:** 0

**Max:** 60

**Step:** 1

**Unit:** %

**Outputs:**

#### Part weight

**Key:** net_kg

**Expr:** length * width * thick * density / 1000000

**Format:** decimal

**Description:** Net weight in kg of the blank, before nesting loss.

#### Sheet weight consumed per part

**Key:** gross_kg

**Expr:** net_kg / (util / 100)

**Format:** decimal

**Description:** Net weight plus its share of scrap, in kg.

#### Sheet price per sq ft

**Key:** price_sqft

**Expr:** price_kg * thick * density / 10.7639

**Format:** currency

**Description:** Price per square foot of sheet at this thickness and material.

#### Material cost per part

**Key:** mat_cost

**Expr:** gross_kg * price_kg

**Format:** currency

#### Cutting cost per part

**Key:** cut_cost

**Expr:** (cut_len / 1000 / cut_speed + pierces * 0.5 / 60) / 60 * laser_rate

**Format:** currency

**Description:** Assumes about 0.5 seconds per pierce on thin material; adjust the laser rate to compensate for thick plate.

#### Bending cost per part

**Key:** bend_cost

**Expr:** bends * bend_sec / 3600 * press_rate

**Format:** currency

#### Finishing cost per part

**Key:** finish_cost

**Expr:** length * width * 2 / 1000000 * 10.7639 * finish

**Format:** currency

#### Setup per part

**Key:** setup_cost

**Expr:** setup / qty

**Format:** currency

#### Total cost per part

**Key:** unit_cost

**Expr:** mat_cost + cut_cost + bend_cost + finish_cost + setup_cost

**Format:** currency

**Primary:** true

#### Quote price per part

**Key:** price

**Expr:** unit_cost / (1 - margin / 100)

**Format:** currency

**Primary:** true

**Chart:**

#### Cost and price per part vs batch quantity

**Type:** line

**X:** qty

**From:** 1

**To:** 500

**Steps:** 30

**Series:**

- unit_cost
- price

**Disclaimer:** An estimate for quoting. Real quotes should add outbound freight, packaging, inspection, deburring, hardware insertion and any overhead you do not already include in the machine rates. Check weights against your material supplier.

## Content

**Intro:** To cost a sheet metal part, work out the blank weight and sheet cost, then add cutting, bending, finishing and setup, and apply your margin. This estimator does that in one page, shows the price per kg and per square foot, and charts how the unit price falls as batch size grows.

**Sections:**

#### How to use the sheet metal cost estimator

**Body:** Enter the blank size and thickness from the flat pattern, pick the material, and type your sheet price per kg. Add the cut length and pierces from your CAM or nesting software, the bend count, and your machine rates. Set the batch quantity and the margin you want. The result shows cost per part, quote price, and a chart of price against quantity, so you can see where a larger batch makes sense.

#### The formulas behind the calculation

**Body:** Weight in kg equals length times width times thickness in millimetres, times density in g/cm3, divided by one million. Material cost divides that weight by nesting utilization, because scrap is paid for, then multiplies by price per kg. Price per square foot equals price per kg times thickness times density, divided by 10.7639. Cutting time is cut length divided by speed, plus pierce time. Bending is bends times seconds per bend. Price equals cost divided by one minus margin.

#### Worked example

**Body:** A 400 by 250 by 2 mm mild steel blank weighs 1.57 kg. At 75 percent utilization it consumes 2.09 kg, about 2.30 in material at 1.10 per kg. Cutting 1.7 m at 3 m per minute plus pierces takes about 0.6 minutes, roughly 0.9 in laser time. Four bends add around 0.17. With finishing and setup spread over 100 parts, cost lands near 5 and the price at 25 percent margin near 6.6. Quantities of 1 to 10 cost far more because setup dominates.

#### Common mistakes

**Body:** Estimators often forget nesting loss, charge the laser at one flat rate for all thicknesses, ignore setup on small batches, and apply margin as a markup instead of on price. Remember that stainless and aluminium cost more per kg but differ in cutting speed, and that thicker plate cuts much slower. If your quotes live in an ERP, keep rates and material prices there so the estimate and the final job cost can be compared.

**Cta:** If you want quotes costed from your own routings and material prices automatically, we can build a private estimating assistant on your ERP data, on-premises if you prefer.

**Faq:**

#### How much does sheet metal cost per kg and per square foot?

**Answer:** It depends on material, grade, thickness and market. Enter your own supplier price per kg: the calculator converts it to a price per square foot for the chosen thickness. Stainless and aluminium usually cost several times more per kg than mild steel.

#### How do I calculate sheet metal weight?

**Answer:** Multiply length, width and thickness in millimetres, multiply by density in g/cm3, and divide by one million to get kilograms. For example, 400 by 250 by 2 mm mild steel at 7.85 gives 1.57 kg.

#### What nesting utilization should I assume?

**Answer:** Use your actual numbers from nesting software. Many shops see 65 to 85 percent depending on part shapes and whether remnants are reused. Low utilization on large simple parts is a quoting red flag worth checking.

#### Can I use this as a sheet metal costing sheet in Excel?

**Answer:** Yes, you can export the inputs and results to Excel or PDF and keep them with the quote. For repeated work, store your machine rates and material prices in a master spreadsheet or ERP and copy them in each time.