# Shop Floor Dispatching Rules Reference (FIFO, SPT, EDD, Critical Ratio and More)

> Source: https://netray.co/tools/shop-floor-dispatching-rules-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A searchable table of the common dispatching and sequencing rules, what each one sorts by, what it favors and where it fails.

## Category

mes-shop-floor

## Industry

Discrete Manufacturing

## Audience

- Production scheduler
- Planner
- Operations manager

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Rule

**Key:** rule

**Type:** text

#### Abbreviation

**Key:** abbr

**Type:** text

#### Sequence jobs by

**Key:** sort

**Type:** text

#### Tends to improve

**Key:** favors

**Type:** text

#### Known weakness

**Key:** weakness

**Type:** text

**Rows:**

**Rule:** First in, first out

**Abbr:** FIFO / FCFS

**Sort:** Arrival time at the work center, earliest first

**Favors:** Fairness, predictable waiting

**Weakness:** Ignores due dates and job length

**Rule:** Shortest processing time

**Abbr:** SPT

**Sort:** Operation time, shortest first

**Favors:** Average flow time, WIP count, throughput of jobs

**Weakness:** Long jobs can starve and go very late

**Rule:** Longest processing time

**Abbr:** LPT

**Sort:** Operation time, longest first

**Favors:** Makespan balance across parallel machines

**Weakness:** Raises average flow time

**Rule:** Earliest due date

**Abbr:** EDD

**Sort:** Job due date, earliest first

**Favors:** Maximum lateness (minimizes it on one machine)

**Weakness:** Can still make many jobs late when the load is heavy

**Rule:** Earliest operation due date

**Abbr:** ODD

**Sort:** Due date assigned to each operation, earliest first

**Favors:** Due date performance in multi-operation routings

**Weakness:** Needs sensible operation due dates

**Rule:** Slack time

**Abbr:** STR / SLACK

**Sort:** Due date minus today minus remaining processing time

**Favors:** Avoiding jobs that are about to become late

**Weakness:** Ignores how many operations remain

**Rule:** Slack per remaining operation

**Abbr:** S/RO

**Sort:** Slack divided by number of operations left

**Favors:** Multi-operation jobs with uneven queue exposure

**Weakness:** Sensitive to wrong routing data

**Rule:** Critical ratio

**Abbr:** CR

**Sort:** Time remaining until due divided by work time remaining, lowest first

**Favors:** Dynamic priority, flags late jobs (CR below 1)

**Weakness:** Needs reliable remaining lead time estimates

**Rule:** Least work remaining

**Abbr:** LWR

**Sort:** Total processing time still to be done, smallest first

**Favors:** Finishing jobs that are nearly done, lowering WIP

**Weakness:** Delays big jobs

**Rule:** Most work remaining

**Abbr:** MWR

**Sort:** Total processing time still to be done, largest first

**Favors:** Protecting long jobs from late finish

**Weakness:** Raises WIP and average flow time

**Rule:** Fewest operations remaining

**Abbr:** FOPNR

**Sort:** Count of operations still to do, fewest first

**Favors:** Clearing jobs close to completion

**Weakness:** Ignores due dates

**Rule:** Next queue

**Abbr:** NQ

**Sort:** Length of the next work center queue, shortest first

**Favors:** Keeping downstream resources fed

**Weakness:** Needs queue visibility across work centers

**Rule:** Weighted shortest processing time

**Abbr:** WSPT

**Sort:** Job weight divided by processing time, highest first

**Favors:** Weighted flow time, customer priority

**Weakness:** Weights must be set and maintained

**Rule:** Shortest setup time

**Abbr:** SST

**Sort:** Sequence-dependent setup time from the current job, shortest first

**Favors:** Lower changeover loss on a bottleneck

**Weakness:** Can push important jobs back

**Rule:** Preferred customer or priority code

**Abbr:** PCO

**Sort:** Priority flag, then another rule as tiebreak

**Favors:** Expedite and key account handling

**Weakness:** Too many flagged jobs defeats the rule

**Rule:** Random

**Abbr:** RAND

**Sort:** Random selection

**Favors:** Used as a simulation baseline

**Weakness:** No planning value

**Rule:** Johnson's rule

**Abbr:** Johnson

**Sort:** Two-machine flow shop: jobs with shorter first-machine time go first, others go last by longest second-machine time

**Favors:** Minimum makespan for a two-machine flow shop

**Weakness:** Only exact for two machines, no sequence-dependent setups

**Rule:** Moore-Hodgson algorithm

**Abbr:** Moore

**Sort:** EDD order, then remove the longest job each time a job would be late

**Favors:** Minimum number of tardy jobs on one machine

**Weakness:** The removed jobs finish last and can be very late

**Rule:** Apparent tardiness cost

**Abbr:** ATC

**Sort:** Weighted index mixing weight, processing time and slack

**Favors:** Total weighted tardiness on one machine

**Weakness:** Needs a tuned look-ahead parameter

**Notes:** Rules are heuristics. Which one wins depends on load, due date tightness and setup structure, so test a rule on a copy of your real queue before changing your dispatch policy.

## Content

**Intro:** Every dispatch list is sorted by some rule, even when nobody chose it on purpose. This table lists the standard dispatching and sequencing rules, what each one sorts by and where it breaks, so a scheduler can pick a rule deliberately.

**Sections:**

#### How to use this reference

**Body:** Type a rule name, an abbreviation or a goal such as lateness into the search box to filter the table. Read the sort column first, because that is the field your ERP or scheduling tool must hold for the rule to work. Then read the weakness column. A rule that needs remaining lead time cannot be run until routings and queue times are credible. Export the filtered rows to Excel to attach them to a scheduling policy or an ERP configuration request.

**Bullets:**

- Search by goal: lateness, flow time, makespan, setup.
- Check the data the rule needs before you configure it.
- Use a tiebreak rule, usually EDD, behind any primary rule.

#### Which rule for which goal

**Body:** Classic scheduling theory gives a few firm results for a single machine. SPT minimizes average flow time. EDD minimizes maximum lateness. Moore-Hodgson minimizes the number of tardy jobs. For two-machine flow shops Johnson's rule minimizes makespan. Real shops have several machines, setups and changing queues, so these results become guidance rather than guarantees. Most planners end up with a hybrid: critical ratio or slack for the main dispatch list, SPT or SST on a bottleneck where changeover loss is high, and a priority code override for expedites.

#### Rules inside ERP and APS systems

**Body:** Most ERP shop floor modules offer a small set of built-in dispatch sort options, typically start date, due date and priority, and only an advanced planning module offers true rule based sequencing. Before assuming your system uses critical ratio, check what the dispatch list or work center queue screen really sorts by. Sorting by operation start date, for example, behaves like a forward looking EDD variant and not like CR. If your rule needs data the ERP does not store, an export to a spreadsheet or script is the usual workaround.

#### Common mistakes

**Body:** The most common mistake is changing the rule to fix a capacity problem. No rule creates capacity, it only decides who is late. The second is using SPT everywhere and ignoring starvation: long jobs wait until they are very late. The third is mixing rules between shifts so operators see a different order each time. Publish one rule, one tiebreak and one expedite process, and measure on time delivery and average flow time for a month before changing anything.

**Cta:** If your dispatch list does not sort the way your planners need, we can add a rule-based priority score on top of live ERP data, read-only by default.

**Faq:**

#### What is the best dispatching rule?

**Answer:** There is no single best rule. SPT is strong for average flow time, EDD for maximum lateness and critical ratio for dynamic due date control. The right choice depends on your goal, load and setup structure. Compare two rules on a copy of your real queue before deciding.

#### What does a critical ratio below 1 mean?

**Answer:** Critical ratio is time remaining until the due date divided by work time remaining. Below 1 the job cannot finish on time at normal speed, equal to 1 it is exactly on schedule, and above 1 it has slack. Rank jobs from lowest to highest.

#### Is FIFO a good rule for production?

**Answer:** FIFO is fair and easy to explain, and it works when due dates are loose and job lengths are similar. It performs poorly under heavy load or mixed priorities because it ignores due dates and operation length entirely.

#### Can I run these rules in my ERP?

**Answer:** Basic ERPs usually offer only date or priority sorting. True rule based sequencing normally needs an APS or finite scheduling module, or a script working on an export of open operations. Check the actual sort fields on your dispatch screen first.

## Search terms

dispatching rules in production scheduling, shop floor priority rules, FIFO vs SPT vs EDD, critical ratio dispatching rule, job sequencing rules list, Johnson's rule scheduling, work center dispatch list rules, production sequencing rules table

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
