# SMD Chip Component Size Code Reference (Imperial and Metric)

> Source: https://netray.co/tools/smd-chip-component-size-code-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Look up imperial and metric size codes for chip resistors and capacitors with nominal length and width, plus typical resistor power ratings.

## Category

electronics

## Industry

Electronics Manufacturing

## Audience

- Electronics buyer
- Component engineer
- Purchasing agent

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Imperial code

**Key:** imperial

**Type:** text

**Help:** Length and width in hundredths of an inch

#### Metric code

**Key:** metric

**Type:** text

**Help:** Length and width in tenths of a millimetre

#### Nominal length (mm)

**Key:** length

**Type:** text

#### Nominal width (mm)

**Key:** width

**Type:** text

#### Typical thick-film resistor rating

**Key:** power

**Type:** text

**Help:** Varies by series and manufacturer

#### Buyer note

**Key:** note

**Type:** text

**Rows:**

**Imperial:** 01005

**Metric:** 0402M

**Length:** 0.40

**Width:** 0.20

**Power:** about 0.03 W

**Note:** Mobile and wearable designs; very hard to hand rework

**Imperial:** 0201

**Metric:** 0603M

**Length:** 0.60

**Width:** 0.30

**Power:** about 0.05 W

**Note:** Fine placement heads and tight stencil control needed

**Imperial:** 0402

**Metric:** 1005M

**Length:** 1.00

**Width:** 0.50

**Power:** about 0.063 W

**Note:** Most common size in dense consumer and industrial boards

**Imperial:** 0603

**Metric:** 1608M

**Length:** 1.60

**Width:** 0.80

**Power:** about 0.1 W

**Note:** Common default for general purpose designs

**Imperial:** 0805

**Metric:** 2012M

**Length:** 2.00

**Width:** 1.25

**Power:** about 0.125 W

**Note:** Easy to hand solder; good for prototypes

**Imperial:** 1206

**Metric:** 3216M

**Length:** 3.20

**Width:** 1.60

**Power:** about 0.25 W

**Note:** Common for higher voltage and larger capacitance MLCC

**Imperial:** 1210

**Metric:** 3225M

**Length:** 3.20

**Width:** 2.50

**Power:** about 0.5 W

**Note:** Larger MLCC values; check flex cracking risk

**Imperial:** 1812

**Metric:** 4532M

**Length:** 4.50

**Width:** 3.20

**Power:** varies by series

**Note:** High voltage MLCC and some power resistors

**Imperial:** 2010

**Metric:** 5025M

**Length:** 5.00

**Width:** 2.50

**Power:** about 0.75 W

**Note:** Power resistors and current sense parts

**Imperial:** 2512

**Metric:** 6332M

**Length:** 6.30

**Width:** 3.20

**Power:** about 1 W

**Note:** Current sense shunts; some series rated 2 W

**Notes:** Dimensions are nominal values used for sorting and sourcing. Tolerances, thickness and terminal geometry differ by manufacturer and series, so always confirm against the datasheet and your land pattern. Inch and metric codes use the same digits in a different unit, which is why 0402 (imperial) and 0402M (metric) are different parts.

## Content

**Intro:** Chip components are named by a four digit size code, and the same four digits mean different parts depending on whether the code is imperial or metric. This reference puts both codes side by side with nominal dimensions so buyers can read a BOM line and know what physical part is being asked for.

**Sections:**

#### How to use the size chart

**Body:** Type a code such as 0603 into the search box and read across to the metric equivalent and nominal length and width. Use it when a BOM from a supplier in Asia lists 1608 while your ERP item master says 0603, or when a quote request needs a size that both sides understand. The chart is sorted from smallest to largest, so you can also scan upward to find a larger fallback size when a part is on allocation.

**Bullets:**

- Search either the imperial or the metric code
- Check the M suffix before assuming a code is imperial
- Export the table to Excel for your own sourcing cross reference

#### How the codes are built

**Body:** An imperial code joins length and width in hundredths of an inch, so 0603 is 0.06 by 0.03 inch. A metric code joins them in tenths of a millimetre, so 1608 is 1.6 by 0.8 mm. The two systems describe the same body, which is why imperial 0603 equals metric 1608. The confusion comes from imperial 0201 (0.6 by 0.3 mm) sharing digits with metric 0201, which is a much smaller body again, so most datasheets mark metric codes with an M or state the unit explicitly.

#### Choosing a size for sourcing

**Body:** Smaller bodies cost more to place and inspect, and the supply base for 01005 and 0201 is narrower than for 0402 and 0603. Larger MLCC bodies such as 1206 and 1210 carry higher capacitance and voltage but are more prone to flex cracking after depaneling. When a design is released, a buyer should know which sizes are standard stock lines and which need a stocking agreement, and should flag any line where the footprint only fits one size.

#### Common mistakes

**Body:** The most frequent error is ordering metric 0402 when imperial 0402 was meant, which produces a part too small for the pads. Another is assuming power rating from size alone: ratings differ by series, and thin-film, thick-film and current-sense parts of the same size have different limits. Record the size code together with the unit in your item master description to prevent this.

**Cta:** If your item master mixes imperial and metric size codes, we can build a private cleanup agent that normalizes descriptions against your ERP data on your own infrastructure.

**Faq:**

#### Is 0603 the same as 1608?

**Answer:** Yes, when 0603 is the imperial code. Imperial 0603 is about 1.6 by 0.8 mm, which is metric 1608. Metric 0603 (often written 0603M) is a much smaller 0.6 by 0.3 mm body that equals imperial 0201.

#### Does package size tell me the power rating?

**Answer:** Only roughly. Typical thick-film ratings rise with size, but each series sets its own rating and derating curve, so use the datasheet for the exact series you are buying rather than the size alone.

#### Which sizes are easiest to hand solder?

**Answer:** 0805 and larger are practical for hand work and prototypes, 0603 is workable with practice, and 0402 and smaller usually need magnification and a fine tip or hot air.

#### Do capacitors use the same size codes as resistors?

**Answer:** Yes, MLCC chip capacitors use the same imperial and metric length and width codes. Thickness is not part of the code and varies with capacitance and voltage, so check the height limit on the datasheet.

## Search terms

smd size chart, 0402 vs 0603 size, smd resistor size code, imperial to metric smd size, 0805 package dimensions, chip resistor sizes, smd capacitor sizes, 1206 size in mm

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
