# SMT Stencil Usage and Cleaning Log (Excel)

> Source: https://netray.co/tools/smt-stencil-usage-and-cleaning-log
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Keep a record of every stencil's print count, cleaning, tension checks and remaining life before it needs replacement.

## Category

electronics

## Industry

Electronics Manufacturing

## Audience

- SMT process engineer
- Stencil room technician
- Quality engineer

## Tool

**Kind:** worksheet

**Mode:** editable

**Columns:**

#### Stencil ID

**Key:** stencil

**Type:** text

#### Assembly

**Key:** assy

**Type:** text

#### Foil thickness

**Key:** thickness

**Type:** number

**Unit:** mm

#### Foil type

**Key:** type

**Type:** select

**Options:**

- Laser cut stainless
- Electroformed
- Nano-coated laser
- Step stencil

#### Prints to date

**Key:** prints

**Type:** number

#### Print life limit

**Key:** limit

**Type:** number

**Help:** Set per your own validated life

#### Prints remaining

**Key:** remaining

**Type:** number

**Expr:** max(limit - prints, 0)

**Format:** integer

#### Life used

**Key:** life_pct

**Type:** number

**Expr:** if(gt(limit, 0), min(prints / limit * 100, 100), 0)

**Format:** percent

#### Last deep clean

**Key:** last_clean

**Type:** date

#### Tension (N/cm)

**Key:** tension

**Type:** number

**Unit:** N/cm

#### Status

**Key:** status

**Type:** select

**Options:**

- In service
- Needs cleaning
- Tension check due
- Retire
- In storage

**Rows:**

**Stencil:** STN-20418-B

**Assy:** PCBA-20418

**Thickness:** 0.12

**Type:** Laser cut stainless

**Prints:** 12400

**Limit:** 50000

**Last clean:** 2026-10-16

**Tension:** 38

**Status:** In service

**Stencil:** STN-17730-A

**Assy:** PCBA-17730

**Thickness:** 0.1

**Type:** Nano-coated laser

**Prints:** 41800

**Limit:** 50000

**Last clean:** 2026-10-18

**Tension:** 35

**Status:** Tension check due

**Stencil:** STN-31092-C

**Assy:** PCBA-31092

**Thickness:** 0.08

**Type:** Electroformed

**Prints:** 6200

**Limit:** 30000

**Last clean:** 2026-10-10

**Tension:** 40

**Status:** Needs cleaning

**Stencil:** STN-11204-A

**Assy:** PCBA-11204

**Thickness:** 0.15

**Type:** Step stencil

**Prints:** 28900

**Limit:** 30000

**Last clean:** 2026-09-29

**Tension:** 31

**Status:** Retire

**Totals:**

#### Stencils tracked

**Key:** stencil

**Agg:** count

#### Total prints

**Key:** prints

**Agg:** sum

**Format:** integer

#### Highest life used

**Key:** life_pct

**Agg:** max

**Format:** percent

**Notes:** Print life is not a universal number. Set it from your own history of print quality, SPI trends and aperture wear, and shorten it for fine pitch stencils. Most stencil frame suppliers recommend a minimum tension and a measurement method; confirm the value for your frame type and use the same gauge each time. Record deep cleaning and any frame or foil damage in the status column.

## Content

**Intro:** A worn, dirty or slack stencil is a hidden cause of bridging, insufficient solder and SPI drift. This log keeps each stencil's print count, cleaning date, tension and status in one editable table so that nobody runs a stencil past its useful life.

**Sections:**

#### How to use the log

**Body:** Add one row per stencil when it arrives and record foil thickness and type. Update the print count at the end of each job from the printer counter, and log the date of the last deep clean and the latest tension reading. The sheet calculates prints remaining and the percentage of life used. Sort by life used to see which stencils need replacement orders, and use the status dropdown to flag stencils that should not be loaded.

**Bullets:**

- Set the life limit from SPI and defect history, not a catalog number.
- Record deep clean after each job family or per your procedure.
- Measure tension with the same gauge and location on each check.
- Retire stencils with damaged apertures or loose foil.

#### Why stencil condition matters

**Body:** Paste transfer depends on aperture quality, foil flatness and seal against the board. Dried paste narrows apertures and reduces volume, while worn nano-coating or dents increase underside smear and bridging. Foil tension affects registration and gasket seal. Tracking stencils like tooling turns a vague problem into a documented one, and it gives you evidence when paste volume trends in SPI move gradually over weeks.

#### Reading the example

**Body:** STN-17730-A has used 41,800 of 50,000 prints, so about 84 percent of its life, and its tension is flagged as due for a check. STN-31092-C is electroformed with a fine 0.08 mm foil, has a shorter life limit, and needs cleaning. STN-11204-A has reached 96 percent of its life and has lost tension, so it is marked for retirement and a replacement order should already be placed.

#### Common mistakes

**Body:** Teams often track prints with a manual tally, which gets lost during shift changes; read the printer counter instead. Others use one life limit for all stencils, even though a 0.08 mm foil with 0.4 mm pitch apertures wears differently from a 0.15 mm step stencil. Finally, do not store stencils with residual paste; clean them, dry them and store them in a protected rack.

**Cta:** If you already track tooling in an ERP or MES, we can add stencil counts automatically from the printer so the log updates itself.

**Faq:**

#### How many prints does an SMT stencil last?

**Answer:** There is no fixed number. Laser cut stainless stencils can often print tens of thousands of boards, while fine pitch or step stencils wear faster. Set the limit from SPI trends, defect rates and visual inspection of apertures.

#### How often should a stencil be cleaned?

**Answer:** Underside wipes happen during printing, typically every few prints for fine pitch and less often for coarse pitch. Deep cleaning with a stencil cleaner or ultrasonic system is done after each job or at defined intervals. Follow your paste and stencil supplier's guidance.

#### What tension should a stencil have?

**Answer:** Typical numbers are in the range of 30 to 50 N/cm for tensioned frames, but the right value depends on the frame and supplier. Measure at the same points each time and replace foils that drop below the supplier's minimum.

#### Can I reuse a stencil for a changed board revision?

**Answer:** Only if the apertures still match the new pad design and the engineering change notice confirms it. If pads changed, order a new stencil; do not modify old foils by hand.

## Search terms

smt stencil usage log, stencil cleaning log template, stencil life tracking excel, stencil print count tracker, smt stencil maintenance record, stencil tension check log, solder paste stencil inspection log, pcb stencil management

---