# Solder Alloy Melting Point Reference (Lead-Free and Leaded)

> Source: https://netray.co/tools/solder-alloy-melting-point-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Compare common solder alloys by composition, solidus and liquidus temperature, and see where each is typically used.

## Category

electronics

## Industry

Electronics Manufacturing

## Audience

- Electronics buyer
- Process engineer
- Quality engineer

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Alloy

**Key:** alloy

**Type:** text

#### Composition (by weight)

**Key:** comp

**Type:** text

#### Solidus (deg C)

**Key:** solidus

**Type:** text

#### Liquidus (deg C)

**Key:** liquidus

**Type:** text

#### Lead content

**Key:** lead

**Type:** text

#### Typical use

**Key:** use

**Type:** text

**Rows:**

**Alloy:** Sn63Pb37

**Comp:** 63% tin, 37% lead

**Solidus:** 183

**Liquidus:** 183

**Lead:** Leaded (eutectic)

**Use:** Hand soldering and exempt leaded assembly

**Alloy:** Sn60Pb40

**Comp:** 60% tin, 40% lead

**Solidus:** 183

**Liquidus:** 190

**Lead:** Leaded

**Use:** General hand and wave soldering in legacy lines

**Alloy:** Sn62Pb36Ag2

**Comp:** 62% tin, 36% lead, 2% silver

**Solidus:** 179

**Liquidus:** 179

**Lead:** Leaded (eutectic)

**Use:** Silver bearing finishes and hybrid parts

**Alloy:** SAC305

**Comp:** 96.5% tin, 3.0% silver, 0.5% copper

**Solidus:** 217

**Liquidus:** 220

**Lead:** Lead-free

**Use:** Most common lead-free reflow and wave alloy

**Alloy:** SAC405

**Comp:** 95.5% tin, 4.0% silver, 0.5% copper

**Solidus:** 217

**Liquidus:** 220

**Lead:** Lead-free

**Use:** Higher silver, used where customers specify it

**Alloy:** SAC0307

**Comp:** 99.0% tin, 0.3% silver, 0.7% copper

**Solidus:** 217

**Liquidus:** 228

**Lead:** Lead-free

**Use:** Lower cost, low silver option

**Alloy:** SN100C

**Comp:** 99.3% tin, 0.7% copper plus trace nickel

**Solidus:** 227

**Liquidus:** 227

**Lead:** Lead-free

**Use:** Wave soldering and selective soldering

**Alloy:** Sn99.3Cu0.7

**Comp:** 99.3% tin, 0.7% copper

**Solidus:** 227

**Liquidus:** 227

**Lead:** Lead-free

**Use:** Wave soldering baths

**Alloy:** Sn96.5Ag3.5

**Comp:** 96.5% tin, 3.5% silver

**Solidus:** 221

**Liquidus:** 221

**Lead:** Lead-free

**Use:** Eutectic tin silver, thermal fatigue sensitive joints

**Alloy:** Sn95Sb5

**Comp:** 95% tin, 5% antimony

**Solidus:** 235

**Liquidus:** 240

**Lead:** Lead-free

**Use:** Higher temperature joints, step soldering

**Alloy:** Sn42Bi58

**Comp:** 42% tin, 58% bismuth

**Solidus:** 138

**Liquidus:** 138

**Lead:** Lead-free

**Use:** Low temperature reflow for heat sensitive parts

**Alloy:** Sn91Zn9

**Comp:** 91% tin, 9% zinc

**Solidus:** 198

**Liquidus:** 198

**Lead:** Lead-free

**Use:** Niche; zinc oxidizes readily in air

**Alloy:** In52Sn48

**Comp:** 52% indium, 48% tin

**Solidus:** 118

**Liquidus:** 118

**Lead:** Lead-free

**Use:** Very low temperature, cryogenic and optical assembly

**Alloy:** Pb92.5Sn5Ag2.5

**Comp:** 92.5% lead, 5% tin, 2.5% silver

**Solidus:** 287

**Liquidus:** 296

**Lead:** High lead

**Use:** High temperature die attach in exempt applications

**Alloy:** Au80Sn20

**Comp:** 80% gold, 20% tin

**Solidus:** 280

**Liquidus:** 280

**Lead:** Lead-free

**Use:** Hermetic packages and laser diode attach

**Notes:** Values are nominal and vary slightly by source and impurity content. Peak reflow temperature is normally set 20 to 40 deg C above liquidus, within the component's maximum body temperature rating. Use the solder paste supplier's profile guidance for production settings.

## Content

**Intro:** Solder alloy decides your reflow peak, which components you can use, and which RoHS or exemption rules apply. This reference lists common alloys with composition, solidus and liquidus so buyers and process engineers can compare them quickly.

**Sections:**

#### How to use the alloy reference

**Body:** Search an alloy name such as SAC305 and read its melting range. Solidus is where melting begins and liquidus is where the alloy is fully liquid. Use the numbers to sanity check a paste or wire order, to compare lead-free against leaded processes, or to understand why a low temperature alloy was chosen for a heat sensitive part.

**Bullets:**

- Search by alloy name or by temperature use
- Compare solidus and liquidus, not just one number
- Export the table for supplier specification files

#### How the numbers relate to your profile

**Body:** Eutectic alloys such as Sn63Pb37 and Sn99.3Cu0.7 melt at a single temperature, so they flow and solidify cleanly. Non-eutectic alloys have a pasty range between solidus and liquidus. Reflow peak temperature is typically set well above liquidus so that all joints wet, while staying under the lowest maximum body temperature of any component on the board. Lead-free assemblies have a narrower window than leaded ones.

#### Sourcing and compliance notes

**Body:** The alloy on a paste, bar or wire label should match the process document and the customer's lead-free requirement. Mixing leaded component finishes with lead-free solder, or the reverse, causes reliability concerns, and some defense and aerospace programs require leaded processes under specific controls. Record the alloy in your ERP item master as an attribute, and keep certificates of analysis with the lot for traceability.

#### Common mistakes

**Body:** People often assume SAC305 and SAC405 have very different melting points when both start melting near 217 deg C. Another mistake is using the liquidus as the reflow peak, which leaves no margin for wetting. A third is ordering a low temperature SnBi paste for a board that later sees high service temperatures, where bismuth alloys may creep or embrittle.

**Cta:** If solder paste lots and expiry are tracked in spreadsheets, we can connect your ERP and shop floor data to a private agent that answers where each lot was used.

**Faq:**

#### What is the melting point of SAC305?

**Answer:** SAC305 begins to melt near 217 deg C and is fully liquid around 220 deg C. Reflow peak temperatures are normally set 20 to 40 deg C above that, within the limits of the components.

#### What is the difference between solidus and liquidus?

**Answer:** Solidus is the temperature at which melting begins and liquidus is the temperature at which the alloy is fully liquid. Between them the alloy is partly solid, and joints should not move in that range.

#### Why is Sn63Pb37 popular for hand soldering?

**Answer:** It is eutectic, so it melts and freezes at one temperature, and it wets well at a lower temperature than lead-free alloys. Its use is restricted under RoHS except where an exemption applies.

#### Can I mix lead-free paste with leaded components?

**Answer:** It can be done but creates reliability and process risks, because the joint ends up with mixed metallurgy. Follow your customer's requirements and get process engineering approval.

## Search terms

sac305 melting point, solder alloy chart, sn63pb37 melting point, lead free solder alloys, sn100c solder, low temperature solder snbi, solder solidus liquidus, sac305 vs sac405

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
