# Stamping RFQ Package Template (Request for Quote)

> Source: https://netray.co/tools/stamping-rfq-package-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A fill-in RFQ for stamped or progressive die parts that captures the data a stamper needs to quote accurately and compare bids.

## Category

supply-chain

## Industry

Metal Stamping

## Audience

- Buyer
- Sourcing engineer
- Supplier quality

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Buying company

**Key:** buyer_co

**Type:** text

**Default:** Acme Assemblies Inc.

#### Buyer contact and email

**Key:** contact

**Type:** text

**Default:** J. Rivera, jrivera@example.com

#### RFQ number

**Key:** rfq_no

**Type:** text

**Default:** RFQ-26-0412

#### Quote due date

**Key:** due

**Type:** date

**Default:** 2026-11-15

#### Part number and revision

**Key:** part_no

**Type:** text

**Default:** BRK-2041 Rev C

#### Part description

**Key:** desc

**Type:** text

**Default:** Mounting bracket, formed, two pierced holes

#### Material and specification

**Key:** material

**Type:** text

**Default:** CR steel 1010, ASTM A1008 CS Type B

#### Thickness and tolerance

**Key:** thk

**Type:** text

**Default:** 0.060 in +/- 0.004 in

#### Finish or coating

**Key:** finish

**Type:** text

**Default:** Zinc plate, clear passivate, 5 to 8 micron

#### Estimated annual usage (EAU)

**Key:** eau

**Type:** number

**Default:** 120000

#### Quote price breaks

**Key:** breaks

**Type:** text

**Default:** 25,000 / 60,000 / 120,000 / 250,000

#### Preferred process

**Key:** process

**Type:** select

**Options:**

- Progressive die
- Transfer die
- Single-hit blanking
- Supplier to recommend

**Default:** Progressive die

#### Tooling ownership

**Key:** tooling

**Type:** select

**Options:**

- Buyer owned
- Supplier owned, amortized in piece price
- Supplier owned, paid in installments

**Default:** Buyer owned

#### PPAP level

**Key:** ppap

**Type:** select

**Options:**

- Level 1
- Level 2
- Level 3
- Level 4
- Level 5
- Not required

**Default:** Level 3

#### Target PPAP and PSW date

**Key:** launch

**Type:** date

**Default:** 2027-03-01

#### Packaging requirement

**Key:** packaging

**Type:** textarea

**Default:** Returnable totes, 1,000 pcs per tote, VCI liner, labeled to customer standard.

#### Special requirements

**Key:** notes

**Type:** textarea

**Default:** Burr height maximum 0.004 in, no burr on cosmetic face. Critical dimensions per control plan on drawing.

**Blocks:**

#### Request for Quote

**Body:** Buyer: {{buyer_co}}
Contact: {{contact}}
RFQ number: {{rfq_no}}
Quote due: {{due}}

#### Part data

**Table:**

**Columns:**

- Item
- Detail

**Rows:**

**0:** Part number and revision

**1:** {{part_no}}

**0:** Description

**1:** {{desc}}

**0:** Material

**1:** {{material}}

**0:** Thickness and tolerance

**1:** {{thk}}

**0:** Finish

**1:** {{finish}}

**0:** Estimated annual usage

**1:** {{eau}}

**0:** Preferred process

**1:** {{process}}

#### Pricing requested

**Body:** Please quote piece price at the following annual quantities: {{breaks}}.

State separately: tooling price, tooling lead time, delivery terms (Incoterms 2020), packaging cost, and any minimum order or surcharge. Please list material basis, coil price assumption and any material price adjustment clause.

#### Price breakdown requested

**Table:**

**Columns:**

- Element
- Per piece
- Notes

**Rows:**

**0:** Material (gross)

**2:** State weight and price per lb

**0:** Conversion (press and labor)

**2:** State parts per hour

**0:** Secondary operations

**2:** Plating, tumbling, assembly

**0:** Tooling amortization (if any)

**2:** State pieces and years

**0:** Packaging and freight

**0:** Total piece price

#### Tooling and launch

**Body:** Tooling: {{tooling}}.
PPAP level: {{ppap}}.
Target PPAP and PSW date: {{launch}}.
Please state the die type, number of stations, press size, expected die life, and a sample submission plan.

#### Packaging and special requirements

**Body:** Packaging: {{packaging}}

Special requirements: {{notes}}

#### Supplier response

**Table:**

**Columns:**

- Question
- Response

**Rows:**

**0:** Quality system certification

**0:** Capacity available at EAU

**0:** Tooling lead time (weeks)

**0:** Price validity (days)

**0:** Exceptions to drawing or specification

#### Approvals

**Signatures:**

- Buyer
- Sourcing manager
- Supplier representative

**Notes:** A starting point for sourcing, not legal advice. Attach the drawing, 3D model, quality requirements and terms and conditions. Confirm confidentiality terms before sharing drawings.

## Content

**Intro:** A vague RFQ gets vague quotes. This template collects the part, material, volume, tooling, quality and delivery data a stamper needs, and asks for a price breakdown so you can compare bids fairly.

**Sections:**

#### How to use the template

**Body:** Fill in the part data, annual usage and price breaks. Choose who owns the tooling, because that changes how the supplier prices the part. State the PPAP level and the target date so the supplier can plan die build and sampling. The generated document includes a price breakdown table that asks for material, conversion, secondary operations, tooling amortization and packaging separately. Attach the drawing and 3D model when you send it, and export to PDF or Word.

#### Why price breaks and a breakdown matter

**Body:** Stamping cost depends on volume because die cost and setup are spread across the program. Asking for several breaks shows the supplier's real cost curve and helps you negotiate. A line-item breakdown lets you compare material assumptions, which is where the largest gaps appear. If one bidder uses a 55 percent utilization and another 75 percent, the difference is visible in the gross weight line rather than hidden in the total.

**Bullets:**

- Ask for the material basis and any index-linked adjustment clause.
- State the Incoterms 2020 delivery point for each quote.
- Require quote validity in days.

#### Common mistakes

**Body:** Buyers often send a drawing with no volume, no revision and no tooling terms, and receive quotes that cannot be compared. Another is leaving PPAP level unstated, which changes the supplier's plan and price. A third is failing to define tooling ownership, bailment and maintenance responsibilities, which leads to disputes later. Keep the RFQ number in all follow-up documents and log the quotes in your ERP or a sourcing file for later audit.

**Cta:** If RFQs, supplier quotes and awarded prices live in email and spreadsheets, we can help connect them to your ERP purchasing records.

**Faq:**

#### What should a stamping RFQ include?

**Answer:** Part number and revision, drawing and model, material and thickness, finish, annual usage and price breaks, tooling ownership, PPAP level and dates, packaging, delivery terms and quality requirements. Missing items lead to assumptions that make quotes hard to compare.

#### How many price breaks should I request?

**Answer:** Three to five that bracket the realistic range, such as 25 percent, 50 percent, 100 percent and 200 percent of EAU. This shows how price moves with volume and gives leverage if forecast volume changes.

#### Who should own the tooling?

**Answer:** Practice varies. Buyer-owned tooling gives portability but the buyer funds it. Supplier-owned tooling amortized in the piece price lowers up-front cost but needs a minimum volume or termination clause. Decide before the RFQ, and state it clearly.

#### Do I need PPAP for every stamped part?

**Answer:** Only if the customer requires it. Automotive programs usually require it, often at Level 3. Other sectors use first article inspection or a quality plan. State the requirement in the RFQ.

## Search terms

stamping rfq template, request for quote metal stamping, rfq form stamped parts, progressive die rfq checklist, stamping supplier quote request, tooling quote request template, price breaks rfq stamping, stamping quote comparison

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
