# SYSPRO Data Migration Mapping Worksheet

> Source: https://netray.co/tools/syspro-data-migration-mapping-worksheet
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Track each master data object from legacy system to SYSPRO with transform rules, owner and sign off status.

## Category

erp-migration

## Erp

SYSPRO

## Region

South Africa

## Audience

- ERP project manager
- Data migration lead
- SYSPRO consultant

## Tool

**Kind:** worksheet

**Mode:** editable

**Columns:**

#### Data object

**Key:** object

**Type:** text

#### Legacy source

**Key:** source

**Type:** text

#### SYSPRO target

**Key:** target

**Type:** text

#### Transform or cleansing rule

**Key:** rule

**Type:** text

#### Record count

**Key:** records

**Type:** number

#### Business owner

**Key:** owner

**Type:** text

#### Status

**Key:** status

**Type:** select

**Options:**

- Not started
- Mapped
- Loaded to test
- Reconciled
- Signed off

**Rows:**

**Object:** Customers

**Source:** Pastel customer file

**Target:** ArCustomer

**Rule:** Merge duplicates by VAT number, standardise addresses

**Records:** 1240

**Owner:** Credit controller

**Status:** Mapped

**Object:** Suppliers

**Source:** Pastel supplier file

**Target:** ApSupplier

**Rule:** Validate bank details with supplier, remove dormant

**Records:** 410

**Owner:** Creditors clerk

**Status:** Not started

**Object:** Stock items

**Source:** Evolution inventory

**Target:** InvMaster

**Rule:** Rebuild stock codes to new naming convention, map UoM

**Records:** 5800

**Owner:** Stores manager

**Status:** Mapped

**Object:** Bills of material

**Source:** Excel BOM files

**Target:** BomStructure

**Rule:** Confirm effective dates, remove obsolete components

**Records:** 930

**Owner:** Production manager

**Status:** Not started

**Object:** Opening balances

**Source:** Trial balance at cutover

**Target:** General ledger opening entries

**Rule:** Reconcile to audited trial balance

**Records:** 210

**Owner:** Financial manager

**Status:** Not started

**Totals:**

#### Total records in scope

**Key:** records

**Agg:** sum

**Format:** integer

#### Objects tracked

**Key:** object

**Agg:** count

**Format:** integer

**Notes:** Confirm exact target table and field names against your own SYSPRO version and the import methods you use. The targets above are common examples, not a full list.

## Content

**Intro:** A migration succeeds or fails on the mapping, not on the load. This worksheet gives you one row per data object with the legacy source, the SYSPRO target, the rules applied, an owner and a status. Export it to Excel to share with the project team.

**Sections:**

#### How to use it

**Body:** Start with one row for every master and open item object you will move: customers, suppliers, stock, bills of material, routings, price lists, open sales orders, open purchase orders and opening balances. Name the legacy source and the target, then write the cleansing rule in plain words. Assign a named business owner, not a team. Update the status as each object moves from mapped to loaded in test, reconciled and signed off.

#### What good looks like

**Body:** Each object has a rule that someone outside IT could read and agree to. Record counts are captured before and after, so you can show nothing was lost. Reconciliation is against a trusted figure, such as the audited trial balance for balances or a stock count for quantities. Sign off is by the business owner, with a date, before the object is loaded into the live company.

**Bullets:**

- Count records before cleansing and after loading
- Reconcile balances to the trial balance
- Load into a test company at least twice before cutover
- Keep the legacy extract files for audit

#### Common mistakes

**Body:** Teams often migrate everything and clean later, which carries years of dormant customers and obsolete stock codes into the new system. Another frequent problem is changing stock code structure without a cross reference to the old code, which breaks supplier catalogues and historic reports. Finally, open transactions are loaded without agreeing a cutoff, so invoices and receipts are counted twice or missed.

**Bullets:**

- Agree a cutover date and freeze rule
- Keep an old code to new code cross reference
- Do not load unverified bank details

**Cta:** If you have large or messy legacy data, we can profile it and produce a cleansing report before you load anything.

**Faq:**

#### Is this specific to SYSPRO?

**Answer:** The example rows use SYSPRO targets, but the structure works for any ERP migration. Replace the target column with your own system's objects and the rest of the sheet still applies.

#### How do I choose what to migrate?

**Answer:** Migrate what the business needs to operate and report on, usually active master data, open transactions and opening balances. Keep older history in a read only archive or reporting database rather than loading it all.

#### Who should sign off each object?

**Answer:** A named business owner, such as the stores manager for stock or the credit controller for customers. IT can load the data, but only the owner can confirm it is complete and correct.

#### How many test loads should I plan?

**Answer:** Plan at least two full test loads before cutover, plus a final dress rehearsal. The first usually exposes mapping errors, and the later ones prove the fixes and the timing of the real cutover window.

## Search terms

syspro data migration template, sage pastel to syspro migration, erp data mapping spreadsheet, data migration mapping template excel, sage evolution to syspro, erp data conversion tracker, master data migration checklist

---