# SyteLine Mongoose Framework Events Reference

> Source: https://netray.co/tools/syteline-mongoose-framework-events-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Every framework event an application event handler can subscribe to in SyteLine 9/10 and CSI on-prem, with when it fires, what it passes and the traps to avoid.

## Category

developer

## Erp

Infor SyteLine

## Audience

- SyteLine developer
- Mongoose developer
- ERP administrator

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Event

**Key:** event

**Type:** text

#### Group

**Key:** group

**Type:** select

**Options:**

- IDO
- Session
- Task
- BOD
- Other

#### Fires when

**Key:** fires

**Type:** text

#### Parameters passed

**Key:** params

**Type:** text

#### Typical SyteLine use

**Key:** use

**Type:** text

#### Gotcha

**Key:** gotcha

**Type:** text

**Rows:**

**Event:** IdoOnInvoke

**Group:** IDO

**Fires:** Before an IDO method is invoked

**Params:** Method name, parameter count, parameter values

**Use:** Check or log calls to a specific method on an SL IDO before it runs

**Gotcha:** Read the method with METHOD() and values with METHODPARM(n); failing the handler stops the call

**Event:** IdoPostInvoke

**Group:** IDO

**Fires:** After an IDO method is invoked

**Params:** Method name, parameter count, parameter values

**Use:** Notify or log after a method such as a posting routine finishes

**Gotcha:** Post events cannot undo the method; use the On event to block

**Event:** IdoOnItemInsert

**Group:** IDO

**Fires:** Before an IDO item is inserted into a collection

**Params:** The row being inserted

**Use:** Validate a new SLCos or SLItems row, or default a value with Set Values

**Gotcha:** On events can veto the insert by failing the handler; P/PROPERTY works here

**Event:** IdoPostItemInsert

**Group:** IDO

**Fires:** After an IDO item is inserted

**Params:** The inserted row

**Use:** Notify a buyer when a new PO line (SLPoitems) is created

**Gotcha:** Runs after the insert; use it for follow-up actions, not validation

**Event:** IdoOnItemUpdate

**Group:** IDO

**Fires:** Before an IDO item is updated

**Params:** The row plus modified flags

**Use:** Require approval before CreditHold changes on SLCustomers

**Gotcha:** Use PROPERTYMODIFIED("CreditHold") so the handler only acts when that property changed

**Event:** IdoPostItemUpdate

**Group:** IDO

**Fires:** After an IDO item is updated

**Params:** The updated row plus modified flags

**Use:** Tell planning when a due date changes on SLCoitems

**Gotcha:** Fires per row; a bulk update of many rows fires it many times

**Event:** IdoOnItemDelete

**Group:** IDO

**Fires:** Before an IDO item is deleted

**Params:** The row

**Use:** Block deletion of SLItems rows unless the user is in an admin group, with a Fail action

**Gotcha:** Only properties present on the delete request are available; check with PROPERTYAVAILABLE

**Event:** IdoPostItemDelete

**Group:** IDO

**Fires:** After an IDO item is deleted

**Params:** The deleted row

**Use:** Write an audit row to a user-defined table after a delete

**Gotcha:** The row is gone from the database; copy what you need from the event

**Event:** IdoOnLoadCollection

**Group:** IDO

**Fires:** Before an IDO collection loads

**Params:** Load flags, property names, post-query actions

**Use:** Audit who queries a sensitive IDO, read the filter with FILTERSTRING()

**Gotcha:** Use P2/PROPERTY2 and FP2 here, not P; RECORDCAP() gives the cap for the query

**Event:** IdoPostLoadCollection

**Group:** IDO

**Fires:** After an IDO collection loads

**Params:** The result set

**Use:** Notify an admin when a load returns more than 1,000 rows

**Gotcha:** ROWS() counts rows only on this event; it returns 0 elsewhere

**Event:** IdoOnUpdateCollection

**Group:** IDO

**Fires:** Before an IDO collection update runs

**Params:** Custom insert, update and delete specifications

**Use:** Inspect or override custom save methods on an update request

**Gotcha:** CUSTOMINSERT, CUSTOMUPDATE and CUSTOMDELETE functions read the specifications

**Event:** IdoPostUpdateCollection

**Group:** IDO

**Fires:** After all IDO collection updates finish

**Params:** None

**Use:** Trigger one follow-up action per save instead of per row

**Gotcha:** No row data is passed; load what you need

**Event:** IdoOnPersistFailed

**Group:** IDO

**Fires:** When a create, update or delete throws an exception

**Params:** DBErrorDataKeys count, DBErrorDataKeyList

**Use:** Alert support when saves fail on an integration IDO

**Gotcha:** Fires on failure only; it does not replace normal error handling in the caller

**Event:** IdoPostRequestQuarantined

**Group:** IDO

**Fires:** When an IDO request is checked against the exclusion list

**Params:** IDO, request type, method name

**Use:** Log or alert on requests caught by request quarantine

**Gotcha:** Only relevant where request exclusion is configured

**Event:** SessionOnLogin

**Group:** Session

**Fires:** When a new session is requested

**Params:** User name

**Use:** Log logins for selected users or configurations

**Gotcha:** USERNAME() and CONFIGNAME() are meant for session events

**Event:** SessionOnLoginFailed

**Group:** Session

**Fires:** When a login attempt fails

**Params:** Application name, configuration, user, originating computer name, failure details

**Use:** Notify the administrator after failed logins on a production configuration

**Gotcha:** Keep the handler light; it runs on every failed attempt

**Event:** SessionOnLogout

**Group:** Session

**Fires:** When a session closes

**Params:** User name

**Use:** Record logout for licence or audit reporting

**Gotcha:** Sessions that time out may not behave like a clean logout; test your case

**Event:** SessionOnVarChanged

**Group:** Session

**Fires:** Before a session variable changes

**Params:** Variable name and new value

**Use:** Watch changes to a session variable a customization relies on

**Gotcha:** Read values with VARIABLENAME() and VARIABLEVALUE()

**Event:** SessionPostVarChanged

**Group:** Session

**Fires:** After a session variable changes

**Params:** Variable name and new value

**Use:** React after a variable is set

**Gotcha:** Fires often if a form sets variables on every record

**Event:** TaskOnPerform

**Group:** Task

**Fires:** Before a background task is performed

**Params:** Environment attributes, profile parameters, report options, cultural formatting, task attributes, task parameters

**Use:** Check parameters before a long report runs

**Gotcha:** Keep the handler light: it runs before every execution of the task

**Event:** TaskPostPerform

**Group:** Task

**Fires:** When a task completes successfully

**Params:** TaskOnPerform attributes plus task result attributes

**Use:** Email a finished report to a distribution list

**Gotcha:** Needs a Document Types entry for each Output Format value used, with the matching file extension (for example PDF)

**Event:** TaskOnPerformFailed

**Group:** Task

**Fires:** When a task fails

**Params:** TaskOnPerform attributes plus task result attributes

**Use:** Alert the owner when a nightly background task fails

**Gotcha:** Use it instead of polling Background Task History

**Event:** BodPreReceive

**Group:** BOD

**Fires:** When an inbound BOD is queued for processing

**Params:** BOD verb, BOD noun, BOD XML

**Use:** Screen inbound BODs before processing

**Gotcha:** If the handler fails, the BOD is not processed and BodOnReceive does not fire

**Event:** BodOnReceive

**Group:** BOD

**Fires:** When the site receives an inbound BOD through ION

**Params:** BODVERB(), BODNOUN(), BODXML

**Use:** Route or log inbound Sync.ItemMaster or Process.SalesOrder BODs

**Gotcha:** Use SUBXML to pull nodes from BODXML() rather than string parsing

**Event:** BodOnReceiveFail

**Group:** BOD

**Fires:** When processing of a received BOD fails

**Params:** BOD verb, BOD noun, BOD XML, error message

**Use:** Notify the integration owner with the error text

**Gotcha:** Pair it with a review of the inbox forms for the failed document

**Event:** DataViewOnLoad

**Group:** Other

**Fires:** When a DataView begins loading

**Params:** DataView report name (initiator)

**Use:** Audit use of a DataView

**Gotcha:** Newer than SyteLine 9.x; confirm the event exists in your release

**Event:** DataViewPostLoad

**Group:** Other

**Fires:** When a DataView finishes loading

**Params:** DataView report name (initiator)

**Use:** Log completion of a heavy DataView

**Gotcha:** Newer than SyteLine 9.x; confirm the event exists in your release

**Event:** ClearServiceSessions

**Group:** Other

**Fires:** When a Mongoose core trigger clears old service sessions

**Params:** None

**Use:** Rarely handled; housekeeping

**Gotcha:** Do not attach slow actions to housekeeping events

**Notes:** Names and parameters follow the Mongoose Framework events help topic. Internal-only events (EmailReportFromFileServer*, FileContentTest) are excluded. Event availability varies by Mongoose release: confirm the list in the Events form on your SyteLine 9.x, 10.x or CSI system before you build a handler.

## Content

**Intro:** This reference lists the Mongoose framework events that application event handlers can subscribe to in Infor SyteLine 9, 10 and CSI on-prem. For each event you get when it fires, the parameters it passes, a typical SyteLine use and the gotcha that usually catches people out.

**Sections:**

#### Where this lives in SyteLine

**Body:** Framework events are system-defined, so you do not create them; you attach handlers to them. Open the Event Handlers form, create a handler, set Event Name to one of these events and, for IDO events, set the Applies to Objects field to the IDO (for example SLCustomers or SLCoitems). Then add actions on the Event Actions form. Use the Event Status and Event Handler Status forms to see each run. For custom logic that only your forms should fire, define a custom event on the Events form and fire it with a Generate Event action instead of overloading a framework event.

**Bullets:**

- Event Handlers form: event name, applies-to objects, synchronous flag, sequence
- Event Actions form: the steps the handler runs
- Event Status form: results of each run, including failures and messages

#### On events versus Post events

**Body:** The naming rule is consistent: On events run before the change and Post events run after it. A synchronous handler on IdoOnItemUpdate that ends with a Fail action stops the update and shows the failure message to the user, which is how most SyteLine validation rules are built. A Post event is the right place for notifications and logging because the data is already committed. Item events (IdoOnItemInsert, Update, Delete and their Post versions) fire once per row, so a grid save of 200 lines fires 200 times. IdoPostUpdateCollection fires once after the whole update finishes, which suits a single follow-up action per save.

#### Worked example: credit hold approval

**Body:** To stop users clearing credit hold without approval, add a synchronous handler on IdoOnItemUpdate for SLCustomers. Give the first action a condition based on PROPERTYMODIFIED("CreditHold") so it only runs when that property changed, then use a Prompt to the credit manager and a Fail action when the answer is no. Because Prompt suspends the handler, the handler must be allowed to suspend; test this on a copy of your configuration first, since a synchronous handler that waits on a person holds the user's save open. Many sites prefer a Post event notification plus a report of changes when approval delays are not acceptable.

#### Version differences and gotchas

**Body:** DataView and Data Lake related events are newer than SyteLine 9.x, and the help for current Mongoose releases lists events your on-prem 9.x system may not have. Property functions are event specific: P or PROPERTY works only on the item events, P2 or PROPERTY2 only on IdoOnLoadCollection and IdoPostLoadCollection, and P3 after a Load IDO Collection action. ROWS() returns 0 outside IdoPostLoadCollection. TaskPostPerform handlers need a Document Types entry for each Output Format on Report Options. Handlers on high-volume IDOs such as SLMatltrans or SLCoitems add load to every save, so keep conditions tight.

**Cta:** If you want your team to ask SyteLine which handlers fire on an IDO, or what changed on an order, in plain English on your own servers, we can set that up.

**Faq:**

#### Where is the Infor Mongoose documentation for framework events?

**Answer:** Infor publishes it in the Mongoose online help under Framework events, and the SyteLine and CSI help include the same topic in the application event system guide. Use the help for your release, since the list grows over time. On your own system, the Events form shows every framework event that exists in that configuration.

#### Can a handler on IdoOnItemUpdate stop the save?

**Answer:** Yes, if the handler is synchronous and fails. A Fail action with a condition and a message ends the handler with Failure status, the update is rejected and the user sees the message. Asynchronous handlers run separately and cannot stop the save, so use them for notifications rather than validation.

#### Why does P() return nothing in my load collection handler?

**Answer:** P and PROPERTY only work with the item events (IdoOnItem and IdoPostItem). On IdoOnLoadCollection and IdoPostLoadCollection use the row form, shown as P2 or PROPERTY2 in the expression editor, with a one-based row number. After a Load IDO Collection action, use P3 with the result set name.

#### Is the Mongoose event system the same as WinStudio form events?

**Answer:** No. Framework and application events run on the application server and apply to every client and integration that touches the IDO. WinStudio form events such as StdFormSave run only inside one form in the client. Validation that must hold for imports and APIs belongs in the event system or IDO code, not in a form script.

## Search terms

infor mongoose documentation, syteline mongoose, infor syteline mongoose, infor mongoose ido development guide, infor mongoose guide, mongoose framework events, syteline event handler events, IdoOnItemUpdate

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
