# SyteLine SQL Query Generator for Item, Job and Customer Order Tables

> Source: https://netray.co/tools/syteline-sql-query-generator-item-job-co
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Fill in site, item prefix, job status and date to produce read-only SQL for item master, jobs and open customer order lines.

## Category

developer

## Erp

Infor SyteLine

## Audience

- SyteLine developer
- Report writer
- Database administrator

## Tool

**Kind:** template

**Output:** code

**Language:** sql

**Fields:**

#### Site reference

**Key:** site

**Type:** text

**Default:** SITE1

#### Item prefix

**Key:** item_prefix

**Type:** text

**Default:** PN-

#### Job status code

**Key:** job_stat

**Type:** select

**Options:**

- R
- F
- P
- S
- C

**Default:** R

#### From date

**Key:** from_date

**Type:** date

**Default:** 2026-10-01

#### To date

**Key:** to_date

**Type:** date

**Default:** 2026-10-31

#### Order line status

**Key:** co_stat

**Type:** select

**Options:**

- O
- F
- C

**Default:** O

**Blocks:**

#### 1. Items by prefix

**Body:** SELECT i.item, i.description, i.u_m, i.p_m_t_code, i.product_code, i.unit_cost, i.lead_time
FROM item_mst i
WHERE i.site_ref = '{{site}}'
  AND i.item LIKE '{{item_prefix}}%'
ORDER BY i.item;

#### 2. Jobs by status and date

**Body:** SELECT j.job, j.suffix, j.item, j.qty_released, j.qty_complete, j.qty_scrapped, j.stat, j.job_date
FROM job_mst j
WHERE j.site_ref = '{{site}}'
  AND j.stat = '{{job_stat}}'
  AND j.job_date >= '{{from_date}}'
  AND j.job_date < DATEADD(day, 1, '{{to_date}}')
ORDER BY j.job_date, j.job, j.suffix;

#### 3. Open customer order lines

**Body:** SELECT c.co_num, c.cust_num, ci.co_line, ci.co_release, ci.item,
       ci.qty_ordered, ci.qty_shipped,
       (ci.qty_ordered - ci.qty_shipped) AS qty_open,
       ci.due_date, ci.stat
FROM coitem_mst ci
JOIN co_mst c
  ON c.co_num = ci.co_num AND c.site_ref = ci.site_ref
WHERE ci.site_ref = '{{site}}'
  AND ci.stat = '{{co_stat}}'
  AND ci.due_date >= '{{from_date}}'
  AND ci.due_date < DATEADD(day, 1, '{{to_date}}')
ORDER BY ci.due_date, c.co_num, ci.co_line;

#### 4. Demand and supply by item

**Body:** SELECT ci.item,
       SUM(ci.qty_ordered - ci.qty_shipped) AS open_demand,
       (SELECT SUM(j.qty_released - j.qty_complete)
          FROM job_mst j
         WHERE j.site_ref = ci.site_ref AND j.item = ci.item AND j.stat = 'R') AS open_job_supply
FROM coitem_mst ci
WHERE ci.site_ref = '{{site}}'
  AND ci.stat = 'O'
  AND ci.item LIKE '{{item_prefix}}%'
GROUP BY ci.item, ci.site_ref
ORDER BY open_demand DESC;

**Notes:** Read-only queries for SQL Server. Table and column names shown are those commonly found in SyteLine databases, but they can differ by version and customization, so confirm them in your own schema before running. Run against a reporting copy or with read-only access where possible, and always include the site reference filter in multi-site installations.

## Content

**Intro:** Anyone writing SyteLine reports ends up in the same four tables: items, jobs, customer orders and order lines. The base tables carry a site reference and a few naming quirks that trip up newcomers. This generator builds clean read-only queries you can adapt.

**Sections:**

#### How to use the generator

**Body:** Enter your site reference, an item prefix, a job status code and a date range, then copy the queries you need. Each block stands alone, so paste one into SQL Server Management Studio, a report builder or a script. The queries use the underlying tables with an explicit site filter, which makes results predictable in multi-site databases. Start with a narrow filter and a small date range, then widen it once the output looks right.

**Bullets:**

- Always filter on the site reference.
- Test on a reporting copy or with a read-only login.
- Add row limits while exploring.

#### How the tables relate

**Body:** The item table holds master data such as unit of measure, source code, cost and lead time. The job table holds production orders keyed by job and suffix with released, completed and scrapped quantities. The customer order header carries the customer and order dates, while order lines carry item, quantities, due date and status. Lines join to headers on order number and site. Comparing open order line quantity to open job quantity by item gives a first view of whether demand is covered by supply.

#### Common mistakes and safeguards

**Body:** Forgetting the site filter returns rows from every site and silently multiplies numbers. Hard coding status letters without checking meaning gives wrong totals, so confirm the values in your own data. Using date comparisons that ignore the time portion drops rows on the last day, which is why the queries use a less-than test against the next day. Never update SyteLine tables with SQL: changes bypass validation and audit. Use the application, IDO methods or supported import tools for writes.

**Bullets:**

- Read with SQL, write through IDOs or the application.
- Check stat values against the status reference.
- Prefer a reporting replica for heavy queries.

**Cta:** Netray's ERPray answers questions over SyteLine read-only, shows the SQL it ran and respects your roles. If you are tired of maintaining a pile of one-off queries, it is worth a look.

**Faq:**

#### Why do SyteLine tables end with _mst?

**Answer:** The base tables carry an _mst suffix and include a site reference column. Views without the suffix usually filter to the current site context. When querying directly with SQL, use the base tables and filter on the site reference yourself.

#### Can I use these queries in Power BI or SSRS?

**Answer:** Yes, they are standard T-SQL selects. Parameterize the site, dates and status instead of typing literals, and use a reporting login with read-only permissions. For large tables, filter early and avoid selecting every column.

#### Is it safe to run SQL against the production database?

**Answer:** Read-only selects are generally safe if they are filtered and efficient, but heavy queries can slow users. Prefer a replica or reporting copy, set a read-only login and avoid unfiltered scans of large tables during working hours.

#### How do I find the right column names for my version?

**Answer:** Query the database information schema for the table, or inspect the IDO that exposes it. Column names and extra user-defined columns differ across versions and installations, so always confirm before using a query in production reporting.

## Search terms

syteline sql queries, syteline item_mst query, syteline job_mst query, syteline coitem_mst open orders sql, syteline site_ref, syteline database tables, syteline sql report examples, csi sql server queries

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
