# Tally XML Export Request Generator

> Source: https://netray.co/tools/tally-xml-export-request-generator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Fill a few fields and get a ready XML envelope to pull masters or vouchers from Tally Prime over its HTTP server.

## Category

developer

## Erp

Tally Prime

## Region

India

## Audience

- Tally developer
- ERP integrator
- Accountant

## Tool

**Kind:** template

**Output:** code

**Language:** xml

**Fields:**

#### Report name

**Key:** report

**Type:** select

**Options:**

- List of Accounts
- Day Book
- Trial Balance

**Default:** List of Accounts

#### Company name (exactly as in Tally)

**Key:** company

**Type:** text

**Default:** Sharma Engineering Works

#### Account type (List of Accounts only)

**Key:** acct_type

**Type:** select

**Options:**

- Ledgers
- Groups
- Stock Items
- Godowns

**Default:** Ledgers

#### From date (YYYYMMDD)

**Key:** from_date

**Type:** text

**Default:** 20250401

#### To date (YYYYMMDD)

**Key:** to_date

**Type:** text

**Default:** 20260331

**Blocks:**

#### Request body (POST to http://localhost:9000)

**Body:** <ENVELOPE>
  <HEADER>
    <VERSION>1</VERSION>
    <TALLYREQUEST>Export</TALLYREQUEST>
    <TYPE>Data</TYPE>
    <ID>{{report}}</ID>
  </HEADER>
  <BODY>
    <DESC>
      <STATICVARIABLES>
        <SVCURRENTCOMPANY>{{company}}</SVCURRENTCOMPANY>
        <SVEXPORTFORMAT>$$SysName:XML</SVEXPORTFORMAT>
        <ACCOUNTTYPE>{{acct_type}}</ACCOUNTTYPE>
        <SVFROMDATE>{{from_date}}</SVFROMDATE>
        <SVTODATE>{{to_date}}</SVTODATE>
      </STATICVARIABLES>
    </DESC>
  </BODY>
</ENVELOPE>

#### Example call from PowerShell

**Body:** $xml = Get-Content .\request.xml -Raw
Invoke-RestMethod -Uri "http://localhost:9000" -Method Post -Body $xml -ContentType "text/xml"

**Notes:** Enable the ODBC/HTTP server in Tally (F1 Help > Settings > Connectivity, or the Client/Server configuration) and keep the company open. Report ids and variables vary by Tally release, so test on a copy of the data first.

## Content

**Intro:** Tally Prime can answer XML requests on a local HTTP port, which is how most Tally-to-Excel, Tally-to-CRM and dashboard connectors work. This generator builds a valid export envelope so you do not have to write the XML from memory.

**Sections:**

#### How to use it

**Body:** Pick the report, type the company name exactly as it appears in Tally, and set the date range. Copy the XML into a file, then POST it to the Tally server address, usually localhost on port 9000. The reply is XML that you can parse with Python, Power Query or any integration platform. Keep the company open in Tally while the call runs.

#### What the envelope means

**Body:** The HEADER tells Tally you want to Export Data and names the report in ID. STATICVARIABLES set the current company, the output format and filters such as the period. The ACCOUNTTYPE variable is used with List of Accounts to choose between ledgers, groups, stock items and godowns. More complex outputs use a custom TDL report or collection instead of a built-in report id.

**Bullets:**

- Use dates as YYYYMMDD in static variables.
- Company name must match exactly, including spaces.
- Larger exports are easier by month than by full year.

#### Security and limits

**Body:** The Tally HTTP server has no authentication of its own. Bind it to localhost or a protected network, and never expose port 9000 to the internet. For read-only analytics, extract data on a schedule into a separate database and query that instead of hitting Tally during working hours.

#### Common mistakes

**Body:** Typical failures are a wrong company name, a closed company, special characters in names that break XML, and requests so broad that Tally freezes. Escape ampersands as &amp; in any value you insert.

**Cta:** If you want natural language questions answered from Tally and other ERP data, with read-only access and an on-prem option, Netray can scope that with you.

**Faq:**

#### Which port does Tally use for XML?

**Answer:** The default HTTP port is 9000, and it can be changed in the Tally connectivity settings. If another program uses 9000 you will need to pick a different port in both Tally and your caller.

#### Does this work with Tally ERP 9 as well?

**Answer:** The XML request format is largely the same for Tally ERP 9 and Tally Prime, but report ids and variables can differ between releases. Test with a copy of your data.

#### Can I write data back to Tally with this?

**Answer:** Export requests only read data. Importing uses a separate Import Data request, and any write should be tested on a copy and reviewed by an accountant first.

#### Why does Tally return an empty reply?

**Answer:** Usually the company is not loaded, the name does not match, or the date range holds no data. Check the Tally window for error text and re-run the request with a short date range.

## Search terms

tally xml export, tally xml request example, tally prime api, tally port 9000 xml, export ledgers from tally xml, tally integration xml, tally data export python, tally prime xml day book

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
