# Tap Drill Size Chart for UNC, UNF and Metric Threads

> Source: https://netray.co/tools/tap-drill-size-chart-unc-unf-metric-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Look up the standard tap drill for common inch and metric threads, with pitch, and export the chart for the shop floor.

## Category

manufacturing

## Industry

Machining

## Audience

- CNC machinist
- CNC programmer
- Manufacturing engineer

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Thread

**Key:** thread

**Type:** text

#### System

**Key:** system

**Type:** text

#### Pitch / TPI

**Key:** pitch

**Type:** text

#### Tap drill

**Key:** drill

**Type:** text

#### Note

**Key:** note

**Type:** text

**Rows:**

**Thread:** M3 x 0.5

**System:** Metric coarse

**Pitch:** 0.5 mm

**Drill:** 2.5 mm

**Note:** Cutting tap, about 75% thread

**Thread:** M4 x 0.7

**System:** Metric coarse

**Pitch:** 0.7 mm

**Drill:** 3.3 mm

**Note:** Cutting tap

**Thread:** M5 x 0.8

**System:** Metric coarse

**Pitch:** 0.8 mm

**Drill:** 4.2 mm

**Note:** Cutting tap

**Thread:** M6 x 1.0

**System:** Metric coarse

**Pitch:** 1.0 mm

**Drill:** 5.0 mm

**Note:** Cutting tap

**Thread:** M8 x 1.25

**System:** Metric coarse

**Pitch:** 1.25 mm

**Drill:** 6.8 mm

**Note:** Cutting tap

**Thread:** M10 x 1.5

**System:** Metric coarse

**Pitch:** 1.5 mm

**Drill:** 8.5 mm

**Note:** Cutting tap

**Thread:** M12 x 1.75

**System:** Metric coarse

**Pitch:** 1.75 mm

**Drill:** 10.2 mm

**Note:** Cutting tap

**Thread:** M14 x 2.0

**System:** Metric coarse

**Pitch:** 2.0 mm

**Drill:** 12.0 mm

**Note:** Cutting tap

**Thread:** M16 x 2.0

**System:** Metric coarse

**Pitch:** 2.0 mm

**Drill:** 14.0 mm

**Note:** Cutting tap

**Thread:** M20 x 2.5

**System:** Metric coarse

**Pitch:** 2.5 mm

**Drill:** 17.5 mm

**Note:** Cutting tap

**Thread:** M24 x 3.0

**System:** Metric coarse

**Pitch:** 3.0 mm

**Drill:** 21.0 mm

**Note:** Cutting tap

**Thread:** M8 x 1.0

**System:** Metric fine

**Pitch:** 1.0 mm

**Drill:** 7.0 mm

**Note:** Cutting tap

**Thread:** M10 x 1.25

**System:** Metric fine

**Pitch:** 1.25 mm

**Drill:** 8.8 mm

**Note:** Cutting tap

**Thread:** M12 x 1.25

**System:** Metric fine

**Pitch:** 1.25 mm

**Drill:** 10.8 mm

**Note:** Cutting tap

**Thread:** M12 x 1.5

**System:** Metric fine

**Pitch:** 1.5 mm

**Drill:** 10.5 mm

**Note:** Cutting tap

**Thread:** M16 x 1.5

**System:** Metric fine

**Pitch:** 1.5 mm

**Drill:** 14.5 mm

**Note:** Cutting tap

**Thread:** M20 x 1.5

**System:** Metric fine

**Pitch:** 1.5 mm

**Drill:** 18.5 mm

**Note:** Cutting tap

**Thread:** #4-40 UNC

**System:** Unified coarse

**Pitch:** 40 TPI

**Drill:** #43

**Note:** Number drill

**Thread:** #6-32 UNC

**System:** Unified coarse

**Pitch:** 32 TPI

**Drill:** #36

**Note:** Number drill

**Thread:** #8-32 UNC

**System:** Unified coarse

**Pitch:** 32 TPI

**Drill:** #29

**Note:** Number drill

**Thread:** #10-24 UNC

**System:** Unified coarse

**Pitch:** 24 TPI

**Drill:** #25

**Note:** Number drill

**Thread:** #10-32 UNF

**System:** Unified fine

**Pitch:** 32 TPI

**Drill:** #21

**Note:** Number drill

**Thread:** 1/4-20 UNC

**System:** Unified coarse

**Pitch:** 20 TPI

**Drill:** #7

**Note:** Number drill

**Thread:** 1/4-28 UNF

**System:** Unified fine

**Pitch:** 28 TPI

**Drill:** #3

**Note:** Number drill

**Thread:** 5/16-18 UNC

**System:** Unified coarse

**Pitch:** 18 TPI

**Drill:** F

**Note:** Letter drill

**Thread:** 5/16-24 UNF

**System:** Unified fine

**Pitch:** 24 TPI

**Drill:** I

**Note:** Letter drill

**Thread:** 3/8-16 UNC

**System:** Unified coarse

**Pitch:** 16 TPI

**Drill:** 5/16 in

**Note:** Fractional drill

**Thread:** 3/8-24 UNF

**System:** Unified fine

**Pitch:** 24 TPI

**Drill:** Q

**Note:** Letter drill

**Thread:** 7/16-14 UNC

**System:** Unified coarse

**Pitch:** 14 TPI

**Drill:** U

**Note:** Letter drill

**Thread:** 7/16-20 UNF

**System:** Unified fine

**Pitch:** 20 TPI

**Drill:** 25/64 in

**Note:** Fractional drill

**Thread:** 1/2-13 UNC

**System:** Unified coarse

**Pitch:** 13 TPI

**Drill:** 27/64 in

**Note:** Fractional drill

**Thread:** 1/2-20 UNF

**System:** Unified fine

**Pitch:** 20 TPI

**Drill:** 29/64 in

**Note:** Fractional drill

**Thread:** 9/16-12 UNC

**System:** Unified coarse

**Pitch:** 12 TPI

**Drill:** 31/64 in

**Note:** Fractional drill

**Thread:** 5/8-11 UNC

**System:** Unified coarse

**Pitch:** 11 TPI

**Drill:** 17/32 in

**Note:** Fractional drill

**Thread:** 3/4-10 UNC

**System:** Unified coarse

**Pitch:** 10 TPI

**Drill:** 21/32 in

**Note:** Fractional drill

**Thread:** 7/8-9 UNC

**System:** Unified coarse

**Pitch:** 9 TPI

**Drill:** 49/64 in

**Note:** Fractional drill

**Thread:** 1-8 UNC

**System:** Unified coarse

**Pitch:** 8 TPI

**Drill:** 7/8 in

**Note:** Fractional drill

**Notes:** Drills listed are the conventional tap drills for roughly 75% thread engagement with a cutting tap. Forming (roll) taps need a larger drill, so use the tap maker's chart for those. Always confirm against your tap supplier's catalog for hard or tough materials.

## Content

**Intro:** Every machinist and CNC programmer needs the tap drill for a given thread many times a week, and the chart is usually on a wall poster or buried in a catalog. This searchable chart covers the common Unified (UNC and UNF) and metric coarse and fine sizes with pitch and drill.

**Sections:**

#### How to use the chart

**Body:** Type a thread such as M8 or 1/4-20 into the search box to filter the rows. Read across to the tap drill column and use that drill for the pilot hole before tapping. Export the table to PDF, Excel or CSV if you want a printed copy at the machine or a lookup list inside your tooling database.

**Bullets:**

- Search by thread, system or drill size
- Number and letter drills are inch series sizes
- Metric drills are in millimetres
- Export to keep a copy by the machine

#### Where the numbers come from

**Body:** A tap drill is chosen so the pilot hole leaves enough material to form roughly 75% of a full thread. For metric threads the common rule of thumb is tap drill equals nominal diameter minus pitch, which is why M8 x 1.25 uses 6.8 mm and M10 x 1.5 uses 8.5 mm. Inch threads use the nearest standard number, letter or fractional drill to the same percentage of thread.

#### Choosing thread engagement

**Body:** Seventy five percent is the default, but it is not always right. In tough materials such as stainless steel or titanium, a larger drill giving 60 to 65 percent engagement reduces tap torque and breakage with very little loss of strength. In soft aluminum, the full 75 percent is normal. Blind holes also need drill depth beyond the thread depth to give the chips room.

#### Common mistakes

**Body:** The most frequent errors are mixing up M10 x 1.5 with M10 x 1.25, using a cutting tap drill for a forming tap, and forgetting that fine threads need a different drill than coarse threads of the same diameter. Record the correct drill in your tool list so the setup sheet, the program and the ERP tool record all agree.

**Cta:** If your tool list lives in a spreadsheet and your ERP routing does not know it, we can show how tooling data from the shop floor can be queried from the ERP in plain language.

**Faq:**

#### What is the tap drill for M8 x 1.25?

**Answer:** The standard tap drill for M8 x 1.25 coarse is 6.8 mm, which gives roughly 75% thread engagement with a cutting tap. For M8 x 1.0 fine pitch the drill is 7.0 mm. Always check the pitch before drilling.

#### What drill do I use for a 1/4-20 tap?

**Answer:** Use a number 7 drill, which is 0.201 inch, for a 1/4-20 UNC cutting tap. For 1/4-28 UNF the conventional drill is number 3. Number drills are part of the inch drill series, not metric.

#### Does a forming tap use the same drill?

**Answer:** No. Forming taps displace metal instead of cutting it, so the pilot hole is larger than for a cutting tap, for example about 7.4 mm for M8 x 1.25. Use the chart supplied by the tap manufacturer for forming taps.

#### Can I use the chart for pipe threads?

**Answer:** This chart covers Unified and ISO metric straight threads only. Pipe threads such as NPT, BSPP and BSPT have their own tap drills and are tapered or use different forms, so use a dedicated pipe thread chart for those.

## Search terms

tap drill size chart, tap drill chart metric, tap drill size chart unc unf, m8 tap drill size, 1/4-20 tap drill, tap drill chart pdf, tap drill sizes excel, thread tap drill reference

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
